Loading…
Loading…
Tender Value
₹49.4 L
EMD Value
₹50,000
Closing Date
9 Oct 2026, 6:00 pm
Executive Engineer Shedhi Irrigation Division Nadiad
Constructing Precast Concrete RCC Box Culvert at ch.4860 mt & ch.7750 mt Ex Tail Distry.
348458
06 of 2026-27
Open
Civil Works - Canal
Works
Nadiad
13 documents required · 10 mandatory · 3 optional
₹1,500
Executive Engineer Shedhi Irrigation Division Nadiad
₹50,000
24 Sept 2026
24 Sept 2026
24 Sept 2026
9 Oct 2026
24 Sept 2026
SCHEDULE -'B'(Bill of Quantity)
Constructing Precast Concrete RCC Box Culvert at ch 4860 mt & ch. 7750 mt Ex Tail Distry
Item No. Item of work Unit Qty Amount (Rs.)
Dismantling the existing brick masonry including sorting out
and stacking the useful material and removing the debris Rs. Seven Hundred
1 and making good the damages etc. complete as directed. In Cum 126.00 750.90 Fifty & Ninety Paise
Cement Mortar Only
Dismantling the R.C.C. work and disposing off the stuff
Rs. Two Thousand
including stacking of the useful materials etc. complete as
2 Cum 67.50 2021.60 Twenty One & Sixty
directed.Heavy Reinforcement ( Main bar above 16 mm. dia. Paise Only
Removing of exiting disturbed any type of lining including
Rs. Twenty Nine &
3 opening of joints, stacking the same and disposing of stuff as Sqmt 481.50 29.10
directed etc. complete with all leads and lifts.
Excavation for foundation in all sorts of soil including yellow
sandy gravelly soils ,soft & hard murrum etc. in dry
condition including depositing the excavated stuff in Rs. One Hundred
4 uniform layers in banks or as and where directed etc. Cum 613.00 107.80 Seven & Eighty Paise
complete for lead upto 500 m and all lift.(BY MACHINERY) Only
Including dewatering.
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, curing as
Rs. Four Thousand
5.a directed with all lead & lift etc complete without Cum 121.00 4012.50 Twelve & Fifty Paise
dewatering and excluding the cost of steel reinforcement.(b) Only
Concrete grade M-15 and MSA-40 mm
(A) For Footing of column / Abutment / Pier / Bottom slab of
barrel / Plinth course / Coping/Approach slab etc.
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, curing as Rs. Four Thousand
5.b directed with all lead & lift etc complete without Cum 51.50 4190.00 One Hundred Ninety
dewatering and excluding the cost of steel reinforcement.(a) Only
Concrete grade M-15 and MSA-20 mm
(A) For Footing of column / Abutment / Pier / Bottom slab of
barrel / Plinth course / Coping/Approach slab etc.
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, curing as Rs. Four Thousand
5.C directed with all lead & lift etc complete without Cum 42.00 4651.00 Six Hundred Fifty
dewatering and excluding the cost of steel reinforcement.(e) One Only
Concrete grade M-25 and MSA-20 mm(A) For Footing of
column / Abutment / Pier / Bottom slab of barrel / Plinth
course / Coping/Approach slab etc.
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, curing as Rs. Four Thousand
5.d directed with all lead & lift etc complete without Cum 153.50 4344.00 Three Hundred Forty
dewatering and excluding the cost of steel Four Only
reinforcement.(e)Concrete grade M-15 and MSA-40 mm
(B) For Pier and Abutments / Wing wall / Head wall /
Return wal/Dowel wall etc.
SCHEDULE -'B'(Bill of Quantity)
Constructing Precast Concrete RCC Box Culvert at ch 4860 mt & ch. 7750 mt Ex Tail Distry
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for
C.C./ R.C.C work by "FLORI" including necessary formwork,
centering, scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without Rs. Five Thousand
5.e dewatering and excluding the cost of steel reinforcement.(n) Cum 23.50 5481.00 Four Hundred Eighty
Concrete grade M-25 and MSA -10 to 20mm One Only
(E) For Column / Beam / Solid Slab of Road Bridge / Barrel /
Cutoff wall etc.
Providing & Placing in position reinforcement bars including
Rs. Seven Thousand
cutting, bending, welding joints where necessary, hooking
6 Qtl 96.00 7194.00 One Hundred Ninety
etc. complete as per drawing for all lead and lifts. (b) TMT Four Only
Providing and laying in position 110 mm dia (6
Rs. Two Hundred
kgf/sqcm) P.V.C. Pipe for weep holes with non
7 Rmt 48.00 262.50 Sixty Two & Fifty
corroding jali in abutments, wing walls, retaining walls Paise Only
Providing rubble and sand layer including supplying of
rubble & coarse clean sharp sand at site including spreading Rs. One Thousand
rubble & coarse sand materials in 25 cm layer including One Hundred Fifty
filling in the gaps in rubble, and levelling etc.complete as Five & Ninety Paise
directed (80% rubble & 20% coarse sand) including Only
consolidation, watering etc. complete.
Back filling the foundation trenches around the structures
Rs. Thirty Six &
9 etc with selected excavated stuff including watering, Cum 132.00 36.90
Ninety Paise Only
ramming, compacting etc. complete. (By Machinery)
Providing and Erecting a "W" metal beam CRASH BARRIER
comprising of 3 mm thick corrugatedsheet metal beam rail,
70 cm above road/groundlevel fixed on ISMC series channel
vertical post,150x 75 x 5 mm space 2.00 m centre to centre
1.80 mhigh 1.10 m below ground/road level fixing at site
shall be in C.C. M-20 block of size 50 x 50 x100 cms for each
post. All steel parts and fitments to be galvanized by hot dip
process, all fitting to conform IS: 1367 and IS: 1364 metal Rs. Four Thousand
beam rail to be fixed on the vertical post with a pacer of Eight Hundred Sixty
section 150 x 75 x 5 mm 3.30 m long complete as per Four & Seventy Paise
MORTH Clause 810.Rates including providing and fixing 3 Only
mm thick ACM type reflactor 100 mm wide, type 4, class-B,
High inensity grade sheeting between two 'W' metal beam
throught and reflactive unit at the top of vertical post as per
IRC:67-2012 etc. complete as per detailed drawing and
directed by engineer-in charge.(Metal beam crash barrier
Design, Manufacturing & Supplying factory- made RCC (wet
cast) Precast Box Culvert category for use in Road Crossing,
stormwater drainage, cable trenching, or utility ducts,
having dimensions of Width x Depth (in mm) (In to In
dimension) and with varies length, with a load carrying
capacity of 70R with minimum earth cushion 200mm for
heavy vehicle movement. Box culvert shall have interlocked
plug socket arrangement. Rubber gasket required to ensure
water-tight character and for jointing of each segment
flange-bolt connection with 12 mm diameter, 50 mm length
Grade-8.8 high tensile bolts with zinccoating and round
washer or equivalent nut- bolt connection will be supplied
11 as part of the Box culvert. The drains shall be manufactured Rmt 28.00 54854.00
Hundred Fifty Four
using minimum M-50/C-40 grade concrete duly steam cured Only
for durability, OPC 53 Grade cement with admixtures as per
IS:456-2000, and coarse and fine aggregates derived from
natural sources. Reinforcement shall be with TMT/TMX bars
of Fe 500D or higher, conforming to IS:1786, fabricated
using in- house automated cage-making units for
consistency. RO water shall be used during manufacturing to
enhance durability. The factory shall be certified with ISO
9001 (Quality Management), ISO 14001 (Environmental
Management), and ISO 45001 (Occupational Health &
Safety) 2000x2000 MM (250 mm all four thickness)
SCHEDULE -'B'(Bill of Quantity)
Constructing Precast Concrete RCC Box Culvert at ch 4860 mt & ch. 7750 mt Ex Tail Distry
Providing temporary all weather and fair weather diversion Rs. Fifty Seven
suitable for traffic during the construction period of the bridge Thousand Six
12 including providing necessary drains and all safty measures Nos 2.00 57616.00
Hundred Sixteen
Providing and laying plain/reinforced cement concrete lining
of M 15 (MSA 20 mm) in bed, side slopes and curvature
including batching, mixing, transporting, placing, vibrating, Rs. Four Hundred
13 smooth finishing, curing including dewatering where Sqmt 357.00 415.80 Fifteen & Eighty
required.(MACHINERY BASED by "FLORI" - WITHOUT PAVER Paise Only
10 cm thick lining in Bed / Slope
In Words: Rs. Forty Nine Lac Thirty Six Thousand Six Hundred Seventy Four & Twenty Five Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should be written in figures and words) of the estimated rate
mentioned above. Amount of my/our tender works out as under.
Estimated amount Estimated amount
Deduct :- ____ % Below Rs. _______________ Add ____ % above Rs. ______
Net Tender amount Rs. ______________ Net Tender amount Rs.
1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment
2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 - GST and Income tax TDS will be deducted at a source while making payments of bills
4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC 10/2017CementConsumption
/16/CDate:11/05/2017as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division or as directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be filled in inkand total of entries in last
column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects and hold good for work under all conditions,
site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt = Running metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs. 5483.37/M.T. (Rate as per CGWRD SOR 2023-24)
Signature of agency
Tedner Clerk Deputy Executive Engineer
Shedhi Irrigation Division Mahemdavad Irrigation Sub Division
Nadiad Mahemdavad
Executive Engineer Divisional Accoutant
Shedhi irrigation Division Shedhi Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. Final SBD pre cast.pdf
02. Sch-B Final.pdf
03. Technical Specification Final1.pdf
04. General and item wise specification Chalindra VRB.pdf
05. specifications precast.pdf
06. DRG.pdf
07. DRG.pdf
Tender Notice No.06 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .