Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.0 Laccepted-aoc | ₹2.0 L | accepted-aoc |
Tender Value
₹1.9 L
EMD Value
₹1,895
Closing Date
13 Aug 2026, 3:30 pmClosed
Executive Engineer R and B Division Anantaupramu
Opp Medical College Sai Nagar Ananthapuramu
Urgent Repairs to the road from Km.268/0 to 271/0 of Mypadu - Nellore - Bellary - Bombay road in Anantapuramu District (SH)
971998
NIT No.76/TO/2026-27, Dated 30.07.2026
OPEN - NCB
Civil Works
ANANTHAPUR
7 documents required · 7 mandatory
₹68
₹1,895
18 Sept 2026
6 Aug 2026
6 Aug 2026
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. .
Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor on prepared surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.70 kg/sqm using emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-charge
Providing B.T. patch work for pot holes using 9.5mm to 11.20 mm HBG machine crushed metal with required quantity HBG key chips 5 to 7mm and 80/100 grade bitumen at 72 Kgs / 1 cum of work for filling the pot holes including removal of loose material in the pot holes, trimming the edges to provide form vertical faces, cleaning, applying tack coat, filling the pot holes compacting with power Road roller of 8 to 10 T and finishing including cost and conveyance of materials T&P charges and all labour charges etc., complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 76 J.xlsx
TENDER_DOCUMENT • 0.24 MB
DTS 76.doc
TENDER_DOCUMENT • 0.58 MB
NIT 76 Shedule-A.xlsm
TENDER_DOCUMENT • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .