Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | L1 | Accepted-AOC Lowest Agreement Executed | |
| 2 | L2₹7.8 L+₹7,789.87 (1.01%)Rejected-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L2 | Rejected-AOC Second lowest | |
| 3 | L3₹8.0 L+₹31,922.25 (4.15%)Rejected-Finance | L3 | Rejected-Finance 3 rd lowest | |
| 4 | L4₹8.2 L+₹46,536.81 (6.05%)Rejected-Finance | L4 | Rejected-Finance 4 th lowest | |
| 5 | L5₹8.2 L+₹46,610.25 (6.06%)Rejected-Finance | L5 | Rejected-Finance 5 th lowest |
Tender Value
₹12.9 L
EMD Value
₹32,400
Closing Date
17 Jul 2020, 9:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer,Minor Irrigation Sub Division, Aluva
Cleaning and desilting of Aluva Thodu
2020_Irrig_371591_1
AEE/MISDN/ALY/31/ET/2020-21/S
Open Tender
Civil Works - Others
Item Rate
30 days
Parakkadavu
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,290
Yes
online
₹32,400
Yes
4 Aug 2020
14 Jul 2020
18 Jul 2020
14 Jul 2020
17 Jul 2020
14 Jul 2020
14 Jul 2020 - 17 Jul 2020
Amount
Scheme 1
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 2
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 3
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 4
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 5
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 6
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 7
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 8
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 9
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 10
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in widthas well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
DAISY JOSE
P.C TOMY
T A JOSEPH
MOHAMMED SUHAIL M A
SAHAJ SAJEEV
muhammed haneefa
Bidder Name
DAISY JOSE
T A JOSEPH
CIJU JOHN
P.C TOMY
muhammed haneefa
MOHAMMED SUHAIL M A
SAHAJ SAJEEV
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_526080.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .