| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 Cr+₹3.5 L (1.59%)Rejected-AOC | ₹2.2 Cr+₹3.5 L (1.59%) | L2 | Rejected-AOC L2 |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
4 Mar 2023, 12:00 pmClosed
EE, PWD, Boleng
Office of the Executive Engineer, PWD, Boleng, PO/PS Boleng, Dist-Siang, Pin-791103
Completion of Komsing Bridge at Pangin, Span-224.00 mtr. in Siang District, AP.
2023_PWDAP_1129_1
BD/e-NIT/SASCI/2022-23/05
Open Tender
Civil Works
Item Rate
92 days
Over river Siang at Komsing
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE PWD Boleng
₹2.1 L
Office of the EE, PWD, Boleng
25 Apr 2023
25 Feb 2023
6 Mar 2023
25 Feb 2023
4 Mar 2023
25 Feb 2023
1 Mar 2023
Amount
I. SH: WIND ANCHOR BLOCK RIGHT BANK-2 Nos.
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. E. RCC Grade M20 Case I. Using concrete mixer
Filling annular space in footing in rock ,lean concrete 1:3:6 normal mix random rubble massonary with round hard stone boulders directly available in river bed at site of works in foundation and plinth i/c leveling up with cement concrete 1:4:8 ( 1 cement : 4 coarse sand 8 graded stone or 1 cement : 12 sand shingle mix.
II. SH: WIND ANCHOR BLOCK LEFT BANK-2 Nos.
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications E. RCC Grade M20 Case-I Using concrete mixer
Filling annular space in footing in rock ,lean concrete 1:3:6 normal mix random rubble massonary with round hard stone boulders directly available in river bed at site of works in foundation and plinth i/c leveling up with cement concrete 1:4:8 ( 1 cement : 4 coarse sand 8 graded stone or 1 cement : 12 sand shingle mix.
III. SH: DLC(CC BASE COURSE)RIGHT BANK
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base material,spreading in uniform layer with motor grader on preapared surface,mixing by mix in olace method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per clause 401) (i) A By Manual Means Grading- I (Using Screening Crushable type such as Moorum or Gravel)
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing)
Centring & Shuttering including strutting and propping etc and removal of formwork for: b) Foundation & Plinth
III SH: DLC(CC BASE COURSE)LEFT BANK
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A Granular
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base material,spreading in uniform layer with motor grader on preapared surface,mixing by mix in olace method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per clause 401) A By Manual Means (i) Grading- I (Using Screening Crushable type such as Moorum or Gravel)
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing)
Centring & Shuttering including strutting and propping etc and removal of formwork for: b) Foundation & Plinth
III. SH: (CC DRAIN RIGHT BANK)
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth
Centring & Shuttering including strutting and propping etc and removal of formwork for: b) Foundation & Plinth
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
Neat cement punning
III SH: (CC DRAIN LEFT BANK)
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth
Centring & Shuttering including strutting and propping etc and removal of formwork for: b) Foundation & Plinth
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
Neat cement punning
IV. SH: (CC STEP)R/B
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m
Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth
Centring & Shuttering including strutting and propping etc and removal of formwork for: b) Foundation & Plinth
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
V. SH: (RCC APPROACH SLAB RIGHT BANK)
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. RCC Grade M20
Centring & Shuttering including strutting and propping etc and removal of formwork for: a) Walls (any thickness) including attached pilaster,buttresses plinth and string courses
VI. SH: (RCC APPROACH SLAB LEFT BANK)
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M20
VII. SH: (RIGHT BANK PEDESTAL) - 2 Nos.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (ii) Ordinary rock (not requiring blasting) A) Manual Means (Depth upto 3 m)
: PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M20
VIII. SH: (RCC BOX CULVERTS)(1.90MX1.10MX11.00M) L/B.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) I. Ordinary rock (not requiring blasting) (A) Manual Means - (i) Depth upto 3 m (without de-watering)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification A. RCC Grade M20 Using Concrete Mixer (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Centring & Shuttering including strutting and propping etc and removal of formwork for: b) Walls(any thickness) including attached pilaster,butresses , plinth and string courses etc
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. Granular material
IX. SH: (CATTLE TRAP)-R/B
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning to the plinth
Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Reinforcement of RCC work including bending, binding and placing in position complete. b) Cold twisted bars.
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) foundation & Plinth
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to a)M20.
Centring and shuttering including strutting, propping etc and removal of form work for : a) Foundation, footings, bases of columns etc. and mass concrete.
12mm cement plaster 1:4(1 cement:4 fine sand).
Steel work in single section including cutting, hoisting, fixing in position and applying priming coat of red lead paint.
Welding by Electric plant
X. SH: PROTECTION WORK IN RCC COUNTERFORT WALL-RIGHT BANK
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) ii) OR
: PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M20
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
XI. SH: PROTECTION WORK IN RCC COUNTERFORT WALL-LEFT BANK
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) ii) OR
: PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Reinforcement Cement concrete in open foundation complete as per drawing and technical specification. RCC Grade M20
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
XII. SH: RETAINING WALL R/B UPSTREAM
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I. Ordinary soil A. Manual Means (i) upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification. (b) Random Rubble Masonry
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100mm dia, AC pipe. Extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Sandy
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : Parapet
12 mm cement plater 1:6 (1 cement : 6 fine sand)
XIII. SH: RAILING AND PARAPET
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Providing and laying cement concrete 1 : 1.5 : 3 (1 cement : 1.50 coarse sand : 3 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level.
Painting two coats with oil type wood preservative of approved brand and manufacture on new work.
XIV. SH: CARRIAGE
Cement ( silaphater to work site =182.37 KM)
Steel ( Guwahati to work site = 700.37 KM)
Sand (Simang quarry to worksite =19.87 km
Aggregate (Simang crusher to work site =19.37 KM)
Boulder (Simang crusher to work site =19.37 KM)
Granular (Simang crusher to work site =19.37 KM)
XV. SH: HEAD LOAD for LEFT BANK
Cement
Steel
Aggregate
Boulders
Shri Tatung Jamoh
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1249.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .