Tender ID
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
10 Feb 2026, 6:00 pmClosed
Executive Engineer, Gir Somnath Irrigation Division, Veraval Ishvar Complex, 3rd Floor, A-Wing, Opp. Reliance Mall, Veraval-Junagadh Road, Veraval-362265
Construction of Men -2 check Dam across Machchhundree River near Village Men in Una Taluka of Gir Somnath District.
267876
Tender Notice No.30 2025-26
Open
Civil - All
Works
Gir Somnath
8 documents required · 8 mandatory
₹3,600
Yes
Executive Engineer,Gir Somnath Irrigation Division,Veraval
₹1.3 L
Yes
21 Jan 2026
21 Jan 2026
21 Jan 2026
10 Feb 2026
21 Jan 2026
Sr. Amount
specification and reference to book of Qty Unit (Without
No. (Without GST)
specifications) GST)
Excavation in all sort of strata and
formations incl. depositing the unuseful
excavated stuff as and where directed
1 incl sorting and stacking useful materials 680.00 Cum 79.00
as directed upto 200 mt lead and all lift
etc. complete incl. dewatering. (A) IN
OVERBURDEN INCL. HARD MURRUM.
Excavation in all sort of strata and
formations incl. depositing the unuseful
excavated stuff as and where directed
2 incl sorting and stacking useful materials 2500.00 Cum 176.00
as directed upto 200 mt lead and all lift
etc. complete incl. dewatering. (B) IN
SOFT ROCK.
Excavation in all sort of strata and
formations incl. depositing the unuseful
excavated stuff as and where directed
3 incl sorting and stacking useful materials 1780.00 Cum 590.00
as directed upto 200 mt lead and all lift
etc. complete incl. dewatering. (C) IN
Cleaning the bed of C.O.T for foundation
mapping,with air and water jet incl
removal of all loose materials/debris etc
Drilling 25 mm. dia.holes at distance as
specified and depth up to 3.00 mt.for
checkdam foundation and fixing anchor
bars of specified diameter with cement
grout includingcleaning holes as
directed etc.(Excluding cost of bars)
Providing,cutting,bending,binding and
fixing in position as per drawing .TMT
BAR , reinforcement for R.C.C. works and
6 anchor bars incl cost of blackannealed 16 26.88 M.T. 76574.00
to 18 BWG M.S.. Wire etc.complete with
all lead and lift Fe-500.
Prov. & Laying in position cement
concrete using cement, sand and
crushed metal coarse aggregate by mass
and machine mix for PCC/RCC including
necessary formworks compaction by
vibrator,curing as directed with all lead
& lift etc complete. (Excluding cost of
steel ) FOR .BODY WALL, APRON,
TRAINING WALL, SIDE WALL, SPLAY
WALL, KEY WALL, CUT OF WALL ETC.
(4/C) Controlled Concrete grade M-15
and MSA-40mm
Providing and fixing in position 100/110
8 mm dia PVC Pipe weep holes in the 180.00 Rmt 358.00
retaining walls/sidewall/abt etc.
Backfilling with appropriate excavated
material behind the structure or refilling
the trenches with excavated useful
9 material including watering ramming 1120.00 Cum 84.00
consolidation etc. complete with all lead
Providing and laying graded filters of
sand,gravel/metal and over size metal (
100 to 150 mm) behind the retaining wall
& wing walls as directed as per approved
drawing with all lead and lifts etc
Providing and Laying dry rubble
pitching with 20 cms gravel/metal and
20cms sand layer as base of inverted
11 graded filter and without header stone 490.00 Sqmt 723.00
but incl.hand packing trimming &
dressing of slope etc complete. (b)
cms thick stone pitching
Providing and fixing in position White
marble plate of Size 45 x 45 x 1.8 cms inc
ingraving The letters as per drawing/ as
directed etc. complete.
Care & diversion of river/creek including
required dewatering during 1%
13 construction of spillway and allied works 1.00 of 129021.66
as prescribed and directed etc. Estimate
I/We am/are willing to carry out the work at….......................% above/below percent
(Should be written in figures and words) of the estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Description of Item (with brief
Item Rate In
specification and reference to Quantity Unit Amount
No. figures
book of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… By
(in words) ………………………………………………….………………………………………………...
(C)Net Tendered Amount (A-B) (in figure) ………………………………
(in words) ………………………………………………….………………………………………………...
# The Contractor shall exhibit a board with detailed specification and details of
1 work as directed by the Engineer-In-Charge for which no extra payment shall
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work
3 GST and Income tax TDS will be deducted at a source while making payments
4 In all R.C.C. Items in Rate Analys`is Standard Cement Consumption has been
taken as per Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design
the cost of difference of cement consumption have been deducted from the
rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Gir Somnath Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Men-2 CD.pdf
BOQ.pdf
Men-2 CD Drawing.pdf
Tender Notice No 30 of 2025-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .