| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 in order | |
| 2 | L2₹5.0 L+₹7,250 (1.48%)Rejected-Finance | L2 | Rejected-Finance Other then L1 | |
| 3 | L3₹5 L+₹8,500 (1.73%)Rejected-Finance | L3 | Rejected-Finance Other then L1 | |
| 4 | L4₹5.1 L+₹18,500 (3.76%)Rejected-Finance | L4 | Rejected-Finance Other then L1 |
| Sl No | Description | Qty | Unit | M/S V K TRADERS L2 | Ashoka Engineers L4 | Surya & Gautam Builders L3 | paswanenterprises L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | 1 Disconnection the HT & LT connection of 800 KVA & 250 KVA existing indoor / outdoor type transformer from plinth mounted and transportation to factory from site and the same back at site and mounting and connection on load properly 2 Each Job
2 Labour only for strip opening of transformer of 800 KVA and taking out coil and core assemble including testing of present electric strength of transformer oil and reassemble the same complete after necessary repair. 1 Each Job
3 Labour only for strip opening of transformer of 250KVA and taking out coil and core assembly including testing of present electric strength of transformer oil and reassemble the same complete after necessary repair. 1 Each Job
4 Material for rewinding of HT side defective coil of transformer 800 KVA with copper winding wire as per actule gauge required data including insulating materials such as cotton tape packing material and sleeves etc varnishing by vacuum impregnation and baking of coil core assemble for copper wound transformer complete. 60 KG
5 Material for rewinding of HT side defective coils of transformers 250 KVA with copper winding wire as per actual gauge required data including insulating materials such as cotton tape packing material and sleeves etc varnishing by vaccum impregnating and baking of coil core assembly for copper wound transformer complete. 25 KG
6 Material for rewinding of LT side defective coils of transformer 250 KVA with copper winding wire as per actule gauge required date including insulating materials such as cotton tape packing material and sleeves etc varnishing by vaccum impregnation and baking of coil core assembly for copper wound transformer complete. 85 KG
7 Material for rewinding LT side defective coils of transformer 250 KVA with copper winding wire as per actule gauge required data including insulating materials such as cotton tape packing material and sleeves etc varnishing by vaccum impregnation and baking of coil core assemble for copper wound transformer complete. 52 KG
8 Supply and pouring transformers oil for transformer topping up after dehydration to achive the die electric strength of 45 KV complete. 170 Ltrs
9 M&L for top gasket as per required size of 800 & 250 KVA transformer. 2 Each
10 M&L for bushing gasket as per required size of 800 & 250 KVA transformer. 8 Each | 1 | One Job | 4,98,750 ₹4,98,750 | 5,10,000 ₹5,10,000 | 5,00,000 ₹5,00,000 | 4,91,500 ₹4,91,500 Lowest |
Tender Value
₹4.9 L
Closing Date
7 Oct 2025, 6:00 pmClosed
GE (AF) Pathankot
GE (AF) Pathankot 145001
REPAIR OF TRANSFORMER OF CAPACITY 800KVA SRL NO DK701 02 SRL NO JK 10 730 AT GE AIR FORCE STATION PATHANKOT
2025_MES_733327_1
3014/Q/22/E3
Limited
Miscellaneous Services
Lump-sum
30 days
GE (AF) Pathankot
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
21 Nov 2025
30 Sept 2025
9 Oct 2025
30 Sept 2025
7 Oct 2025
1 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .