Loading…
Loading…
Tender Value
₹18.9 L
EMD Value
₹20,000
Closing Date
6 Jul 2026, 2:00 pmClosed
Administrator,Administrator Office
Construction of RCC compound wall at Koteshwar Farm
314767
KoteRCC Wall
Open
Civil Works
Works
Banaskantha
8 documents required · 8 mandatory
₹1,062
Ambaji
₹20,000
17 Jun 2026
17 Jun 2026
17 Jun 2026
6 Jul 2026
17 Jun 2026
NAME OF WORK:- CONSTRUCTION OF REMAINING COMPOUND WALL AT
IT NO DETAILS OF ITEMS T.QUTY UNIT Rate AMOUNT
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
1 materials and disposing off the excavated stuff 115.20 Cmt 273.50
upto 50 Meter lead.(D) Soft rock not
requiring Blasting
Providing and laying cement concrete 1:3:6 (1-
Cement : 3- Coarse sand : 6- graded stone
2 aggregates 20 mm nominal size) and curing 21.60 Cmt 2949.48
complete excluding cost of formwork in (A)
Foundation and Plinth
Providing and laying controlled cement concrete
M.250 and curing complete excluding the cost of
3 formwork and reinforcement for reinforced 121.00 Cmt 4498.00
concrete work in (B) Walls, from top of
foundation level upto floor two level
Providing TMT Bar FE 500D reinforcement for
4 R.C.C. work including bending, binding and 9680.00 Kg 76.52
placing in position complete upto floor two level
Filling available excavated earth(excluding rock)
in trenches. plinth,sides of foundations etc. in
5 layers not exceeding 20 cm. in depth 144.00 Cmt 135.56
consolidating each disposited layer by ramming
Labour charges for fixing of MS pipe as per site
6 requirement and as per instruction of engineer in 40.00 Nos 50.00
Providing formwork of ordinary timber planking
so as to give a rough finish including centering
shuttering strutting and propping etc. height of
propping and centering below
supporting floor to ceiling not exceeding 4 M.
and removal of the same for in situ reinforced
concrete and plain concrete work in. (C) Vertical
surface such as walls (any
thickness) partitions and the like including
attached buttresses & string course & the like
Add 1 % Labour Cess =
I/We am/are willing to carry out the work at… ...................... % above/below percent (Should be written in
figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
I/We hereby declare that, I/We have carefully studied conditions of contract, Specifications & Other
documents of this work and agree to execute that same accordingly.
The Price bid shall include all taxes, duties, livies, fee and other charges as per applicable taxes excluding GST .
All the Rate are taken without considering GST (Goods & Service tax). TOTAL AMOUNT OF CIVIL WORK
All the Rate are taken without considering GST (Goods & Service tax). TOTAL AMOUNT OF CIVIL WORK
Sign of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical Bid RCC Compound wall koteshwar.pdf
Price Bid RCC Compound wall.pdf
Site visit certificate.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .