Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹13.5 L
EMD Value
₹27,020
Closing Date
22 Oct 2026, 2:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE
EXECUTIVE ENGINEER, LUCKNOW DIVISION SHARDA NAHAR,
construction of side drain, rainchute u/s and d/s side of Baghamau barrel and basement related work of Baghamau barrel at km 1.300 Gomti left bund d/s of Amar Shaheed Path. (Lot-02)
2026_UPIDC_1196940_2
07/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Left gomti Bund D/S of Amar Shaheed Path
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹27,020
Yes
15 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in maintaince of side slope for relaying stone boulder including all lead, lift with mannual compaction but excluding mechanical compaction and dressing to profile for proper completion of work. | 457.51 | Cum. | - | - |
| 2 | Providing and laying 500 G.S.M. Non woven Geotextile made of 100% polipropylene staple fibre (continuous filament not allowed) bonded into stable network through needle punching meeting the technical specification and qualification criteria mentioned in tender document. The geotextiule should be tech-geo PR 15 or equivalent and have minimum 70% resistance against UV exposure and should be inert to biological degradation and resistant to naturally occuring acids and alikalies as filter below stone boulder pitching. | 381.26 | Sqm. | - | - |
| 3 | Dismantling existing boulder pitching & relaying manually as per direction of Engineer-in-Charge. | 30.5 | Cum. | - | - |
| 4 | Earth work in excavation of foundation for construction of rain chutes, drain, barrel basement wall etc. with all material, labour, T&P etc. to complete work in all respect as per direction of E-in Charge. | 162.24 | Cum. | - | - |
| 5 | Centering & shuttering for concrete work including rent of shuttering material, labour and T&P etc for proper completion of work. | 112.48 | sqm | - | - |
| 6 | Providing and Laying PCC in M10 grade concrete (1:3:6) in foundation including cost of material, labour, T&P etc for proper completion of work. | 40.79 | Cum. | - | - |
| 7 | Cutting, Bending, Binding and placing TMT steel bars for reinforcement in rainchute, top wall and sleepers with cost of binding wire required for proper completion of work including cost of all material, labour T&P etc. | 1.08 | MT | - | - |
| 8 | Providing and Laying RCC in M20 grade concrete (1:1.5:3) including cost of material, labour, T&P etc for proper completion of work. | 18.72 | Cum. | - | - |
| 9 | B/W 1:3 C.M. with class 150 brick with cement and coarse sand including cost of material, labour, T&P etc for proper completion of work. | 63.04 | Cum. | - | - |
| 10 | Pointing work in 1:2 with cement and coarse sand including cost of material, labour, T&P etc for proper completion of work. | 149.24 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.37 MB
BIDDOCUMENTNIT072026.pdf
Tender Documents • 1.92 MB
BOQ_2261280.xls
BOQ • 0.29 MB
TSEarthwork.pdf
Additional Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .