Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.0 L
EMD Value
₹14,033
Closing Date
15 May 2026, 1:00 pmClosed
O/O BLOCK DEVELOPMENT OFFICER, SADAR BLOCK
O/O BLOCK DEVELOPMENT OFFICER, SADAR BLOCK
Construction of Office Building at Bodapalasa LAMPCS, Bodapalasa GP
2026_PRKSB_129042_9
TCN 01-KJRSADAR/2026-27
Open Tender
Civil Works - Others
Percentage
180 days
KEONJHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹14,033
Yes
18 May 2026
9 May 2026
18 May 2026
9 May 2026
15 May 2026
9 May 2026
9 May 2026 - 12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or Gravelly soil within 50 m initial lead & 1.50 m initial lift including levelling & dressing the bed & lifting the excavated materials within initial lead as per direction of Er. in Charge clear from work site with laying in layers of 0.30 m in depth , breaking the clod to maximum 5 to 7 cm in size & rough dressing the bed including cost of all labour etc. all complete . | 48.33 | cum | 274.15 | ₹13,249.67 |
| 2 | Filling sand in foundation & plinth well watered & rammed including cost , conveyance to site , royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 31.86 | cum | 871.82 | ₹27,776.19 |
| 3 | C.C. ( 1 : 3: 6 ) using 40 mm size hgcb metal free from weathered skin & all foreign materials including cost , conveyance to site , watering and curing,royalty , cess DMF & EMF and additinol royalty etc all taxes of all materials & cost of all labour complete | 9.74 | cum | 6,167.1 | ₹60,067.55 |
| 4 | Fly ash brick masonry in cement mortar (1:6) including watering and curing etc. complete including cost conveyance, royalities, cess DMF & EMF and additinol royalty & taxes of all mateirals & cost of all labour with T & P required for the work etc all complete in all respect as per direction of the Engineer in charge in super structure.
In F/P (Ground Floor) | 20.94 | cum | 5,609.6 | ₹1,17,465.02 |
| 5 | In Superstructure (Ground Floor) | 23.91 | cum | 5,647.58 | ₹1,35,033.64 |
| 6 | R.C.C. work in C.C. M-20 Grade of concrete using 20 mm & down graded size hg chips including hoisting & laying the concrete, watering and curing etc. including cost of centering and shuttering for the work etc. all complete to required levels laid in layers including cost, conveyance to site , royalty , cess DMF & EMF and additinol royalty etc. all taxes of all materials & cost of all labour complete
Base of Column | 4.05 | cum | 6,625.89 | ₹26,834.85 |
| 7 | Plinth Band | 3.1 | cum | 6,257.14 | ₹19,397.13 |
| 8 | Lintel(Ground Floor) | 1.78 | cum | 14,200.74 | ₹25,277.32 |
| 9 | Column & Beam (Ground floor)) | 5.85 | cum | 15,788.9 | ₹92,365.06 |
| 10 | chhaja | 6.66 | cum | 1,219.71 | ₹8,123.27 |
stage.html
html • 0.02 MB
finance_590423.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
DTCN.pdf
Tender Documents • 0.61 MB
BOQ_590423.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .