Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹35.4 LAccepted-AOC VADINAR | BANAS KANTHA | GUJARAT | 385001 | ₹35.4 L | 1 | Accepted-AOC Overall Lowest |
| 2 | 2₹41.5 LRejected-Finance | ₹41.5 L | 2 | Rejected-Finance Not Lowest |
| 3 | 3₹45.1 LRejected-Finance NEAR FOREST OFFICE H NO 91 GALI NUMBER 1 BASANT NAGAR PANIPA PANIPAT 132103 INDIA | PANIPAT | HARYANA | 132103 | ₹45.1 L | 3 | Rejected-Finance Not Lowest |
Tender Value
₹42.0 L
EMD Value
₹11,000
Closing Date
6 Jan 2026, 5:00 pmClosed
Deputy General Manager
Indian Oil Corporation Limited, Western Region Pipelines, P.O. Bedipara, Morbi Road, Gauridad, Distt. Rajkot-360 003 (Gujarat)
Installation of J-18 Blending Unit at WRPL Vadinar
2025_WRRAJ_188029_1
PWRJT25230
Open Tender
Mechanical Works
61 days
WRPL Vadinar
Please refer Tender Documents
16 documents required · 16 mandatory
₹11,000
Yes
19 Feb 2026
23 Dec 2025
7 Jan 2026
23 Dec 2025
6 Jan 2026
30 Dec 2025
23 Dec 2025 - 27 Dec 2025
Earth work in surface excavation (not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan) in all kinds of soil including getting out and disposal of excavated earth up to all lead and lift, as directed by the Engineer-in-Charge.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas including trimming of sides of the trenches, dressing, ramming and levelling the bottom of the trenches correct to level, grade etc. including filling in sides of foundation trenches, plinth etc. with the excavated earth available and/or depositing the excess earth within station area limits, in layers not exceeding 20 cms. thick, consolidating each deposited layer by ramming, watering, dressing to level and grade , complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Enginee
In all kinds of soil
In Ordinary rock
In Hard rock (blasting prohibited)
Providing and laying in position cement concrete of specified grade at all depths including ramming & shuttering etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer: 1:3:6 (1 cement : 3 coarse sand (Zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying structural reinforced cement concrete work (1:1.5:3) conforming to IS:456 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) at all heights and depth for construction of foundations, beams, columns, staircases, chajja,lintels, balconies, shelves, plain window sills, roof slabs, facia, canopies, fins, porch, water tank etc. including providing centering, shuttering, staging, scaffolding, form work etc compacting with mechanical vibrator, curing etc. complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer. (Payment for Reinforcement shall be made as per relevant item of SOR). All work up to plinth level
Steel reinforcement for R.C.C. workincluding initial straightening of coiled/uncoiled bars, removal of loose rust, cutting, bending to correct size & shape, binding with 18 gauge G.I. wire at each intersection and placing at any position, at any height and depth complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of Site Engineer. : Thermo-Mechanically Treated bars of grade Fe-500 D or more
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, the cost of centering, shuttering, finishing, curing, carriage for all leads, as per direction of the engineer-in-charge, for the following grades of concrete.: Note: 1. Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. 2.Payment for Reinforcement shall be made as per relevant item of SOR.
Concrete of M25 grade with minimum cement content of 330 kg /cum
Add for using extra cement in the items of design mix over and above the specified cement content therein. [Note: Unit "QN" shall mean "QUINTAL"]
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per the directions of Engineer-in-Charge. Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations Nominal concrete 1:3:6 or richer mix (including equivalent design mix)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per the directions of Engineer-in-Charge. Notes: 1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. 2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations. (3) Cutting of all reinforcement shall be done using hack saw or chiesel or any other method as approved by the Engineer-in-Charge]
10 NPS (10.75" OD x 0.250"/ 0.280"/ 0.365"/ 0.438" WT) APL 5L Pipe: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD.
12 NPS (12.75" OD x 0.250"/ 0.281"/ 0.375"/ 0.438" WT) APL 5L Pipe: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD.
18" OD x 0.375"/ 0.438"/ 0.500" WT APL 5L Pipe: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD.
24" OD x 0.375"/ 0.438"/ 0.500" WT APL 5L Pipe: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD.
4 NPS 4.5" OD x 0.237"/0.337" WT ASTM A106/ A333/ A53 Pipe: Taking delivery & transporting of pipes from designated stock pile location /Designated godown both from outside & inside station premises. Taking delivery of pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises, transporting the same to site, fabrication and erection of above ground piping including cutting, edge preparation, bending, threading, lining up, welding and installing pipes and pipe fittings, flanges, elbows, equal and reducing outlet tees,concentric/eccentric reducers, y-type strainers, drain funnels, vent pipes and tapping for instruments such as pressure gauges, thermal relief valves, thermowells etc., installing above ground at all elevations connecting with equipment nozzles, valves, vessels, in line instruments etc., welded and threaded pipe line of different pressure ratings, flushing pipes by water after cleaning by compressed air, hydrostatic testing of each section to the specified pressure, draining the water, tie-in, final cleaning-up and dispoal of wastes and surpluses including providing all inputs such as labour, material, equipments and consumables necessary to perform the work (other than those specifically under taken by the owner in this contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of Site Engineer / EIC. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD.
4 NPS 4.5" OD x 0.237"/0.337" WT ASTM A106/ A333/ A53 Pipe:Taking delivery of bare Pipes, pipe fittings, steel flanges, spiral wound metallic gaskets & fasteners from designated location within station premises transporting the same to site, fabrication and erection of underground piping including cutting, edge preparation, bending, threading, lining up and welding, excavating, trenching in all kind of soil to specific depths as indicated in drawings and installing pipes and all types of pipe fittings like flanges, elbows, equal and reducing outlet tees, concentric/eccentric reducers, drain funnels, vent pipe and tapping for instrument such as pessure gauges, thermal relief valves, thermowells etc., underground at elevations indicated in the drawing connecting with equipment nozzles, valves, vessels, in-line instruments etc.,Cleaning exposed steel surfaces of Bare Pipes, Pipe Joints, Fittings, Flanges,equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials,Equipment etc, holiday detection of the coating, cleaning of coated pipes by water flushing after cleaning by compresed air,hydrostatic testing of each section to the specified pressure, draining the water, tie-in, back filling, restoration of site final cleaning up and disposal of water and surpluses, providing all inputs such as labour, materials equipment and consumable necessary to perform the work (other than those specifically undertaken to be supplied by the owner under the contract) and completing the work in all respects in accordance with the drawings, specifications and instructions of the Site Engineer / EIC. In case of 3LPE coated pipes, weld joints shall be PU coated. Note: 1. Thickness and Grade mentioned in the item are for reference only and may vary. Payment shall be based on OD. 2. Payment for external PU/ epoxy coating shall be done separately as per relevant SOR item.
10" SWMG ANSI 150#
12" SWMG ANSI 150#
18" SWMG ANSI 150#
1" x 1" 150# x150# F/F TRV
4" x 150# 90° LR Bends
4" x 150# 45° LR Bends
1" F/F ANSI 600# A/G, BALL VALVE- BS 5351/ ISO 17292
1" x 150# 90° LR Bends
1" 3000 Class St. NIPPLE (1" coupling)
Taking delivery of 3 stream blending unit system with all field and control equipment such as flow meter and control valve and other auxiliaries, accessories from designated storage location within the Pump Station,shifting and placing the equipments in the pre-constructed foundation, carrying out levelling equipment, assembling together of all sub-assemblies, auxiliaries, mountings, fittings, Installation of interconnecting piping recieved along with the equipment etc., providing assistance for carrying out trial run of equipment completing the work in all respects in accordance with the drawings, manufacturer's installation instructions, technical specifications and as per the instruction of the Site Engineer / EIC. Note:1. The auxiliaries and mountings shall include but not limited to pipe works etc.2. if additional piping is required to be done then it shall be paid seperately under piping SOR. 3. Weight of equipment is indicative only, Payment shall be done based on actual weight of equipment."
24" NB Pipe Joints RT: Inspection of welding by Digital Radiography (CR) or by conventional film radiographic method on all types of piping including processing of images/ films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost. v) In case where radiography is not possible, verification by utrasonic testing shall be done at contractors cost., vi) Magenetic particle inspection as and where required shall be done at Contractors cost. vii) In case of conventional film radiography, all films shall be digitised and submitted to EIC/ Site Engineer in USB drives. viii) In case of Digital/ Computed Radiography, native files along with image/ pdf files shall be submitted to EIC/ Site Engineer in USB drives.
18" NB Pipe Joints RT: Inspection of welding by Digital Radiography (CR) or by conventional film radiographic method on all types of piping including processing of images/ films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost. v) In case where radiography is not possible, verification by utrasonic testing shall be done at contractors cost., vi) Magenetic particle inspection as and where required shall be done at Contractors cost. vii) In case of conventional film radiography, all films shall be digitised and submitted to EIC/ Site Engineer in USB drives. viii) In case of Digital/ Computed Radiography, native files along with image/ pdf files shall be submitted to EIC/ Site Engineer in USB drives.
12" NB Pipe Joints RT: Inspection of welding by Digital Radiography (CR) or by conventional film radiographic method on all types of piping including processing of images/ films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost. v) In case where radiography is not possible, verification by utrasonic testing shall be done at contractors cost., vi) Magenetic particle inspection as and where required shall be done at Contractors cost. vii) In case of conventional film radiography, all films shall be digitised and submitted to EIC/ Site Engineer in USB drives. viii) In case of Digital/ Computed Radiography, native files along with image/ pdf files shall be submitted to EIC/ Site Engineer in USB drives.
10" NB Pipe Joints RT: Inspection of welding by Digital Radiography (CR) or by conventional film radiographic method on all types of piping including processing of images/ films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost. v) In case where radiography is not possible, verification by utrasonic testing shall be done at contractors cost., vi) Magenetic particle inspection as and where required shall be done at Contractors cost. vii) In case of conventional film radiography, all films shall be digitised and submitted to EIC/ Site Engineer in USB drives. viii) In case of Digital/ Computed Radiography, native files along with image/ pdf files shall be submitted to EIC/ Site Engineer in USB drives.
Surface preparation of piping, equipment and valves etc. by abrasive blast cleaning or with power wire brush (wherever blast cleaning is not possible) confirming to SA 2.5, making the surface free of dust, grease, mill scales etc., application of 1 coat x 50-75 microns DFT of Inorganic Zinc Ethyl Slicate Primer, followed by application of sealer coat of 30 micron DFT and intermediate coat of 150 micron DFT with surface tolerant epoxy mastic paint and 2 coats x 50 micron each DFT of Isocynate Aliphatic Poly Urethene (PU) by airless spray, with approved materials, paints, tools, tackles, consulambles, non-consumables, labour, equipment etc. to complete the job in all respects as per specification and instructions of the Site Engineer / EIC. The total DFT shall be minimum 330 microns.
Cleaning exposed steel surfaces of piping, equipment and valves etc. by abrasive blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane/ liquid epoxy, with approved materials, labour, equipment etc. and completing the job in all respects as per specification and instructions of the Site Engineer / EIC.- PU /liquid epoxy Coating of under ground piping
1" NB Pipe Joints RT: Inspection of welding by Digital Radiography (CR) or by conventional film radiographic method on all types of piping including processing of images/ films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost. v) In case where radiography is not possible, verification by utrasonic testing shall be done at contractors cost., vi) Magenetic particle inspection as and where required shall be done at Contractors cost. vii) In case of conventional film radiography, all films shall be digitised and submitted to EIC/ Site Engineer in USB drives. viii) In case of Digital/ Computed Radiography, native files along with image/ pdf files shall be submitted to EIC/ Site Engineer in USB drives.
4" NB Pipe Joints RT: Inspection of welding by Digital Radiography (CR) or by conventional film radiographic method on all types of piping including processing of images/ films and interpreting the results of weld quality and reporting the same to the Site Engineer together with recommendations as to the acceptability or otherwise of the welds, submitting the finished radiographic films as may be approved or directed by Engineer-in-Charge inclusive of supply of all pesonnel, labour, materials, equipment, consumable, inputs, etc. and providing all services complete in all respects as envisaged in the contract documents. Note: i) Payment will be on the basis of number of welds of the respective size radiographed and shall be all inclusive for the complete job of radiographic inspection as envisaged in the contract document. ii) Radiography not involving full girth weld will be paid at 50% of the rate for full girth weld for the respective size. iii) For set-on type branch welding, the rate for radiography will be as applicable to the branch pipe size. iv) Repeat radiography of individual welds due to defective films or repair of welds shall be done at contractor's cost. v) In case where radiography is not possible, verification by utrasonic testing shall be done at contractors cost., vi) Magenetic particle inspection as and where required shall be done at Contractors cost. vii) In case of conventional film radiography, all films shall be digitised and submitted to EIC/ Site Engineer in USB drives. viii) In case of Digital/ Computed Radiography, native files along with image/ pdf files shall be submitted to EIC/ Site Engineer in USB drives.
7/8 X 0.13m. STUD BOLT WITH 2 NUT AND WASH. (ANSI A-193/194) 133.35 MM LENGTH
7/8 X 0.14m. STUD BOLT WITH 2 NUT AND WASH. (ANSI A-193/194) 133.35 MM LENGTH
1+1/8X 0.17 m STUD BOLT WITH 2 NUT AND WASH. (ANSI A-193/194) 133.35 MM LENGTH
12"x10" x Concentric Reducer x 150#
24"x12" x Concentric Reducer x 150#
Providing and erecting 2.0 metre high temporary barricading at site; each panel of size 2.5m x 2.0m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube posts/ horizontal members/ bracings covered with 1.63mm thick MS Sheet. The steel shall be fixed with 30x5mm MS flat by suitable welding/ riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5m. MS channel ISLC75 @ 5.70 kg/m, 50cm long shall be provided at the bottom having oval shaped holes of size 50x25mm at both ends with 50cm long MS angle 40x40x6mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250mm long expansion fasteners at both ends. The work shall be executed as per drawing/ direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously including shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of the Engineer-in-Charge. [Note: One time payment shall be made for providing barricading from start of work till completion of work including shifting. The barricading provided shall remain to be the property of the contractor on completion of the work].
Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per the directions of Engineer-in-Charge. [Notes: (1) Dismantling shall be allowed during day shift only & prior permission for the same shall be obtained. (2) Providing of necessary covers/ barricades around the work area shall be done prior to dismantling operations.(3) Adequate safety precautions shall also be taken care before commencement of any activity] :
Water Bound Macadam Road
Bituminous Road
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.82 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Additional Documents • 0.82 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
Annexure_Commercial_PWRJT25230.xls
Additional Documents • 0.49 MB
BOQ_198336.xls
BOQ • 0.36 MB
PWRJT25230.pdf
Tender Documents • 27.76 MB
Download all tender documents and submit your bid