Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.0 LAccepted-AOC | 1 | Accepted-AOC The negotiated rate of the L1 Bidder was approved by Thuravoor GP | |
| 2 | 2₹6.0 L+₹216.52 (0.04%)Rejected-Finance | 2 | Rejected-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | SABU SEBASTIAN L1 | Jojo Louis L2 |
|---|---|---|---|---|---|
| 1.00Pond construction | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 1,152 | cum | 235.33 ₹2,71,100.16 Lowest | 235.41 ₹2,71,192.32 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 576 | cum | 116.96 ₹67,368.96 Lowest | 117.01 ₹67,397.76 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 60 | hour | 312.94 ₹18,776.4 Lowest | 313.05 ₹18,783 |
| 1.00 | OD426142/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 48.24 | cum | 3,838.87 ₹1,85,187.09 Lowest | 3,840.27 ₹1,85,254.62 |
| 1.00 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.7 | cum | 9,331.97 ₹25,196.32 Lowest | 9,335.37 ₹25,205.5 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 7.2 | sqm | 788.56 ₹5,677.63 Lowest | 788.85 ₹5,679.72 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 253.8 | kilogram | 108.08 ₹27,430.7 Lowest | 108.12 ₹27,440.86 |
Tender Value
₹5.5 L
EMD Value
₹13,659
Closing Date
6 Mar 2025, 1:00 pmClosed
Herry Thomas
Office of the Assitant Engineer LID and EW Section Thuravoor GP Angamaly
Pr. No. S0052/25 in Thuravoor GP Ernakulam-Vattakulam Maintenance in Ward 2
2025_LSGD_743486_1
Tender 6 /Thuravoor GP /Angamaly /2024 - 25
Open Tender
Civil Works - Water Works
Item Rate
180 days
Thuravoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,205
₹13,659
Yes
12 May 2026
27 Feb 2025
7 Mar 2025
27 Feb 2025
6 Mar 2025
27 Feb 2025
27 Feb 2025 - 6 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1197947.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
52nitt.pdf
Tender Documents • 0.04 MB
52sbdd.pdf
Other Document • 4.50 MB
BOQ_1197947.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .