Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹18.5 L
EMD Value
₹19,000
Closing Date
2 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Rajkot Irrigation Division, Rajkot.
CHHAPARWADI-II IRRIGATION SCHEME. Repairing of Bucket work in Chhaparwadi-II Irrigation Scheme
356661
SBD-21 of 2026-27
Open
Civil - All
Works
Rajkot
12 documents required · 12 mandatory
₹900
Executive Engineer, Rajkot Irrigation Division Rajkot
₹19,000
18 Oct 2026
18 Oct 2026
18 Oct 2026
2 Nov 2026
18 Oct 2026
120 days
NAME OF WORK :-
Repairing of Bucket work in Chhaparwadi-II Irrigation Scheme
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Dewatering of earthen dam and allied works, foundation areas, pits, trenches 14370.00 H.P.-Hrs. 27.00 Rupees: Twenty Seven
etc incl, cost of pumping machineries, pipe lines, labour, diesel/electricity/DG Only.
set etc. Complete
2 Earth work in embankment from borrow pits in all sort of soil and soft 1788.00 Cum 165.20 Rupees: One Hundred
murrum or other suitable strata as directed incl breaking clods and dressing Sixty Five & Ps. Twenty
to the design section with lead as under and all lift incl.site clearance etc Only.
comp. For all canal capacity & Without rolling and watering.
3 Desilting of dam bucket including depositing the same as directed with all lift 850.00 Cum 296.00 Rupees: Two Hundred
and lead etc. complete. Ninety Six Only.
4 Dismantling of C.C. foundation or flooring sorting &stacking useful and 16.00 Cum 828.00 Rupees: Eight Hundred
unuseful materials in lead upto 200mt as directed etc. complete. Twenty Eight Only.
5 Preparation of spillway, piers and allied work incl. removal of loose 46.00 Sqm. 8.90 Rupees: Eight & Ps.
weathered material incl. hard rock by wedging, chiseling with all labours, Ninty Only.
tools and materials for cleaning the Existing reinforcement of surfaces with
sand blasting, compressed air and water jetting as required etc complete.
6 Epoxy bonding of new concrete Or mortar to old surface in structure with 46.00 Sqm. 260.00 Rupees: Two Hundred
proper application of coat of resin and hardener in proportion of 2:1 by Sixty Only.
weight confirming to IS-9197 to give proper bond between old surface new
concrete Or mortar etc. complete.
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
7 Prov. & Laying in position cement concrete using cement, steel fibre (0.3 to 31.00 Cum 20395.00 Rupees: Twenty
0.5 mm thick and 25 mm long), sand & crushed metal aggregate by machine Thousand Three
mix incl. necessary formworks compaction by mechanical vibrator curing as Hundred Ninety Five
directed with all lead & lift etc complete. (Excluding the cost of reinforced Only.
steel) For Bucket and end sill etc.
Concrete grade M-30 and MSA-20mm Fibre Reinforced Concrete.
8 Excavation in all sort of strata and formations incl. depositing the unuseful 2070.00 Cum 83.00 Rupees: Eighty Three
excavated stuff as and where directed incl sorting and stacking useful Only.
materials as directed upto 30 mt lead etc. complete incl. dewatering. (Depth
(For all type canal & foundation trenches of C.D. works)
(A) IN OVERBURDEN INCL. HARD MURRUM.
9 Providing dry rubble masonry as per requirement including hand packing 65.00 Cum 1263.00 Rupees: One Thousand
filling with chips etc. completed Two Hundred Sixty Three
Rupees: Eighteen Lac Forty Six Thousand Seven Hundred Thirty Five Only
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the estimated
rates mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate
of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of contractor. Rajkot Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender P I to XV.pdf
2- SBD Rep. Bucket - Chap-2 P 1 to 201.pdf
3 Sch B - Repairing Bucket - Chhap-2 P 202 to 203.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .