Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.3 LAccepted-Finance GRAM KANGRI POST SHYAMUR DISTRICT HARIDWAR UTTARAKHAND | ₹63.3 L | L1 | Accepted-Finance Accepted for LAO |
| 2 | L2₹65.0 LRejected-Finance | ₹65.0 L | L2 | Rejected-Finance Quoted rates are higher than L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Original Documents not Submitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Name of Work is Not mentioned in Affidavit for Bid Validity ,Name of Work is Not mentioned in Demand Draft,Invoice of Key Equipment not submitted as per SBD. |
| 5 | Rejected-Technical NA | NA | NA | 121004 | - | - | Rejected-Technical Original Documents not Submitted |
| Sl No | Description | Qty | Unit | M/S.N.Z.CONSTRUCTION CO. L7 | DERAJ SINGH RAWAT L1 | RAMESH SINGH TOMAR L3 | Mahesh Singh Chauhan L6 | Santram Sharma L8 | RAJRAJESHWARI CONSTRUCTION L4 | M/s Sanjay Singh L5 | HARVEER SINGH L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00PROTECTION WORK : | |||||||||||
| 2.00 | Excavation for Structures:- Excavation in foundation for cross drainage structures, Retaining walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer - in - Charge also including supply of all materials, labour, T&P etc required for proper completion of work. | 38.49 | Cum | 441 ₹20,029.43 | 300 ₹13,625.46 | 401.23 ₹18,223.14 | 400 ₹18,167.28 | 441.4 ₹20,047.60 | 419.37 ₹19,047.03 | 300 ₹13,625.46 | 300 ₹13,625.46 |
| 3.00 | Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604. | 40.48 | Cum | 4,787 ₹2.3 L | 3,500 ₹1.7 L | 4,352.11 ₹2.1 L | 4,700 ₹2.2 L | 4,787.8 ₹2.3 L | 4,548.88 ₹2.2 L | 4,500 ₹2.1 L | 4,000 ₹1.9 L |
| 4.00Random rubble stone masonry for structures laid dry by locally available approved stone ncluding supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for , retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge. | |||||||||||
| 5.00 | For R/W and B/W | 158.01 | Cum | 2,215 ₹4.1 L | 1,800 ₹3.4 L | 2,013.71 ₹3.8 L | 2,200 ₹4.1 L | 2,215.3 ₹4.1 L | 2,104.75 ₹3.9 L | 2,100 ₹3.9 L | 1,800 ₹3.4 L |
| 6.00HP stone filling in back of walls including supply of all material, labour, T&P etc. required for proper completion of the work. | |||||||||||
| 7.00 | For R/W and B/W | 32 | Cum | 1,024 ₹38,666.24 | 900 ₹33,984 | 931.27 ₹35,164.76 | 1,024 ₹38,666.24 | 1,024.5 ₹38,685.12 | 973.37 ₹36,754.45 | 900 ₹33,984 | 950 ₹35,872 |
| 8.00 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 | 135 | Cum | 2,423 ₹3.9 L | 2,200 ₹3.5 L | 2,202.6 ₹3.5 L | 2,423 ₹3.9 L | 2,423.1 ₹3.9 L | 2,302.18 ₹3.7 L | 2,200 ₹3.5 L | 2,200 ₹3.5 L |
| 9.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction. | 2.16 | Cum | 4,050 ₹10,322.64 | 3,500 ₹8,920.80 | 3,682.09 ₹9,384.91 | 4,050 ₹10,322.64 | 4,050.7 ₹10,324.42 | 3,848.57 ₹9,809.23 | 3,900 ₹9,940.32 | 3,500 ₹8,920.80 |
| 10.00 | Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications) | 34.2 | Cum. | 1,468 ₹59,242.61 | 1,200 ₹48,427.20 | 1,335.14 ₹53,880.91 | 1,468 ₹59,242.61 | 1,468.8 ₹59,274.89 | 1,395.5 ₹56,316.80 | 1,300 ₹52,462.80 | 1,200 ₹48,427.20 |
Tender Value
₹65 L
EMD Value
₹1.3 L
Closing Date
15 May 2026, 3:00 pmClosed
EE PIU DEHRADUN
6 INDRA NAGAR NEAR ANURAG NURSERY VASANT VIHAR DEHRADUN
UT0510 D1 Reconstruction and repair works of disaster-damaged reaches from Km 0.00 to Km 16.00 in Maldevta Serki Silla to Bheswadgaon MR under SRMD, 2025-26
2026_URRDA_94859_1
551/PMGSY/27042026
Open Tender
Civil Works - Roads
180 days
DEHRADUN
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
EE PMGSY ID DEHRADUN
₹1.3 L
PMGSY PIU DEHRADUN
6 Jun 2026
29 Apr 2026
18 May 2026
30 Apr 2026
15 May 2026
2 May 2026
2 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | PROTECTION WORK : | - | - | - | - | itemH1 |
| 2 | Excavation for Structures:- Excavation in foundation for cross drainage structures, Retaining walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer - in - Charge also including supply of all materials, labour, T&P etc required for proper completion of work. | - | Cum | 441.4 | - | itemH1Code1 |
| 3 | Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 700 &1604. | 1 | Cum | 4,787.8 | ₹4,783.01 | itemH1Code2 |
| 4 | Random rubble stone masonry for structures laid dry by locally available approved stone ncluding supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for , retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge. | - | - | - | - | itemH1Code3 |
| 5 | For R/W and B/W | 1 | Cum | 2,215.3 | ₹2,213.08 | itemH1Code4 |
| 6 | HP stone filling in back of walls including supply of all material, labour, T&P etc. required for proper completion of the work. | - | - | - | - | itemH1Code5 |
| 7 | For R/W and B/W | - | Cum | 1,024.5 | - | itemH1Code6 |
| 8 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 | - | Cum | 2,423.1 | - | itemH1Code7 |
| 9 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction. | - | Cum | 4,050.7 | - | itemH1Code8 |
| 10 | Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications) | - | Cum. | 1,468.8 | - | itemH1Code9 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_112212.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_112212.xls
BOQ • 0.33 MB
SBD.pdf
Tender Documents • 2.70 MB
Download all tender documents and submit your bid