Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹23.2 L
EMD Value
₹46,400
Closing Date
15 Dec 2026, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
XEN ED PULWAMA
OFFICE OF THE XEN ED PULWAMA
Augmentation of Sub-Stations for Sub Division Rajpora under SASCI 2026-27 (Site/Work wise details mentioned in Annexure)
2026_PDD_332041_2
KPDCL/OM/PUL/58 of 2026-27 Dated 23-11-2026.
Open Tender
Electrical Works
Turn-key
40 days
XEN ED PULWAMA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer ED Pulwama
₹46,400
26 Nov 2026
26 Nov 2026
15 Dec 2026
26 Nov 2026
15 Dec 2026
26 Nov 2026
300 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old installed Transformers at:
1. 63KVA at Astan Mohalla Uzrampathri
2. 63KVA at Wani Mohalla Gulshanabad
3. 63KVA at Kumar Mohalla Hanjan Payeen
4. 63KVA at Checki Bellow.
5. 100KVA at Wani Mohalla Bamnoo Keller.
6. 100KVA at Wani Mohalla Bamnoo Keller.
7. 100KVA at Wani Mohalla Zagigam
Including:
a. Loading, unloading and returning back of 04 No. 63KVA and 03 No. of 100KVA transformers to Divisional Stores.
b. Installation, and commissioning of old spared 03 Nos. of 100KVA Transformers at Astan Mohalla Uzrampathri, Checki Bellow and Kumar Mohalla Hanjan Payeen. | 1 | Job | - | - |
| 2 | Supply, Installation, Testing and Commissioning of 100 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-1 (corresponding to previous Energy efficiency level II) as per IS 1180 (part I of 2014), Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate | 1 | No. | - | - |
| 3 | Supply, Installation, Testing and Commissioning of 200 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-1 (corresponding to previous Energy efficiency level II) as per IS 1180 (part I of 2014), Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate | 3 | No. | - | - |
| 4 | Supply, Installation, Testing and Commissioning of 9 Mtr. Long Pole( ST-410 SP33) | 4 | No. | - | - |
| 5 | Supply, Installation, Testing and Commissioning of G I Channel/Angle/Flat iron for cross,braces of sizes including clamps and GI Nut Bolts | 580 | Kg | - | - |
| 6 | Supply, Installation, Testing and Commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 12 | No | - | - |
| 7 | Supply, Installation, Testing and Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 7 | Set | - | - |
| 8 | Supply, Installation, Testing and Commissioning of 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 7 | Set | - | - |
| 9 | Supply, Installation, Testing and Commissioning of 11KV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 7 | Set | - | - |
| 10 | Supply, Installation, Testing and Commissioning of LT Fuse Set | 7 | Set | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Annexure.pdf
Tender Documents • 0.05 MB
Worksdetails.pdf
Tender Documents • 0.26 MB
BOQ_1128052.xls
BOQ • 0.24 MB
SBD58.pdf
Tender Documents • 1.68 MB
StandardDrawings.pdf
Tender Documents • 36.45 MB
technicalspecifications.pdf
Tender Documents • 5.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .