Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical 1759 SECOND FLOOR SECTOR 28 FARIDABAD 121008 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121008 | Accepted-Technical Qualified |
| 3 | Rejected-Technical | Rejected-Technical DIsqualified |
Tender Value
Refer Docs
EMD Value
₹84,315
Closing Date
21 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE EM SHP Dharchula
Office of the EE EM SHP, UJVNL, near 33 kV S/S Hat, Dharchula Pithorgarh
REPAIR AND MAINTENANCE OF UNIT 1 OF SURINGAD II SHP 5MW, LOCATED IN TEHSIL MUNSIYARI, DISTRICT PITHORAGARH, UTTARAKHAND
2026_UJVN_101591_1
04/EE (EM-SHP)/DHARCHULA/26-27
Open Tender
Repair and Maintenance Works
Item Rate
105 days
Suringad SHP village Talla Dummer, Munsiyari
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Deputy General Manager (EM-SHP), UJVN Ltd
₹84,315
27 Nov 2026
27 Oct 2026
25 Nov 2026
27 Oct 2026
21 Nov 2026
27 Oct 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Spherical Valve:-Dismantling of complete Spherical valve make Fouress Engineering India limited, fixing of dummy plates on penstock.
a) Shifting of Spherical valve to service bay for all repairing & testing works.
b) Inspection, Cleaning , Replacement of damaged main seal, repairing of SS seal locking ring, drilling and tapping, replacement of damaged SS hardwares & bolts Carbon steel 8.8 grade make TVS/Unbrako, adjustment of seal, dry testing Spherical Valve complete in all respect including all men, material & all T&P required for proper completion of work.
c) Spherical valve housing inside seal seating area (stainless steel) complete inspection & repair to be done if required.
d) Dismantling, inspection & servicing of bypass valve, repair of damaged portion if necessary. | 1 | Job | - | - |
| 2 | Spherical Valve Servo motor:- Complete Dismantling of Spherical Valve Servomotor, inspection, replacements of piston seals, dry testing complete in all respect including all man & Material required for proper completion of work . | 1 | Job | - | - |
| 3 | RUNNER ASSEMBLY:- A) Dismantling & Inspection-Dismantling of the Pelton runner assembly and thorough inspection of the runner, buckets, hub and associated components. Existing bucket profile dimensions shall be measured and recorded before commencement of repair work.
B) Heat Treatment & Welding / Build-up- Welding shall be carried out using a proper approved welding procedure, including required pre-heating, inter-pass temperature control and post-welding heat treatment/stress-relieving process, as applicable to the runner material and Carrying out welding/build-up work on the damaged/worn portions of the Pelton runner buckets using 3.15 mm dia. E-309 Mo electrodes of reputed makes such as D&H, L&T or ESAB, as approved by the Engineer-in-Charge.
C) Grinding & Profile Restoration- After welding, the repaired areas shall be properly ground and finished. The original bucket profile shall be accurately restored, maintaining the required geometry, dimensions and surface finish as per the approved drawing/profile template.
D) Machining-Necessary machining of the runner/bucket assembly shall be carried out wherever required to achieve the specified dimensions, tolerances and surface finish. Final dimensions shall be maintained strictly as per the approved drawing.
E) Dynamic Balancing-After completion of welding, grinding and machining, the complete Pelton runner assembly shall be subjected to dynamic balancing at the required operating speed/conditions. Balancing shall be carried out within the permissible limits specified in the approved drawing/technical specification.
F) Completion of Work-The scope shall include all necessary manpower, skilled technicians, welding consumables, electrodes, machinery, tools, tackles, measuring instruments, machining facilities, balancing facilities and other materials/accessories required for proper and complete execution of the work. | 1 | Job | - | - |
| 4 | Top & Bottom Nozzle and Nozzle plate Assembly:- Dismantling complete Nozzle assembly and Nozzle plate, Repairing of all damaged parts, Complete welding of Nozzle plates, replacement of damaged seal and hardwards, complete machining of welded portion , Blue matching of nozzle and plates, testing-complete in all respect including all man & material required for proper completion of work | 1 | Job | - | - |
| 5 | Top & Bottom Nozzle Servo Motor:- Complete Dismantling of Top & Bottom Nozzle Servomotor, inspection, replacements of piston seals, dry testing complete in all respect including all man & Material required for proper completion of work | 1 | Job | - | - |
| 6 | Deflector Assembly: Dismantling of Deflector , Repairing of damaged parts, Replacement of seal and Hardwares , complete machining of welded portion , Testing complete in all respect including all man & Material required for proper completion of work | 1 | Job | - | - |
| 7 | Deflector Servomotor:- Complete Dismantling of deflector Servomotor, inspection, replacements of piston seals, dry testing complete in all respect including all man & Material required for proper completion of work | 1 | Job | - | - |
| 8 | OPU:-General servicing, repairing, calibration, timing testing of Yuken make OPU through qualified person. Replacement of bearings, bush of hydraulic pump. Supply& replacement of damaged heater & thermostat (RTD), complete including manpower, material & T&P. | 1 | Job | - | - |
| 9 | Synchronous Generator DE & NDE Bearing & Brake pads: Complete Top Cover , side terminal boxes, cleaning side covers, inlet & Outlet fan, overhauling & repairing of WEG make 3125kVA,3.3KV Generator along with DE & NDE bearing during annual maintenance.
(i) Complete cleaning (removal of oil, moisture, dirt & carbon)by opening side covers. Measurement of IR & PI value before and after cleaning.
(ii) Inspection of DE & NDE bearing thrust pads, counter thrust pads, cleaning, scrapping, adjustment and blue matching of pads. Supply & replacement of seal of DE & NDE bearing.
(iii) Complete repair & maintenance of Synchronous Generator braking system. Supply & replacement of damaged brake pads.
(iv)Inspection & Checking of DE & NDE side RTD, if necessary supply & replacement of RTD’s.
(iv) Complete leveling & alignment of Generator rotor with turbine at the time of box-up. Measurement Report shall be provided in detail.
Work complete in all respect including manpower, materials & T&P. | 1 | Job | - | - |
| 10 | Lubrication Oil System (LOS): Complete servicing/overhauling of Yuken make hydraulic pump, replacement of bearings, bush, cleaning of tank, recalibration of all pressure switches. Supply & replacement of damaged heater & thermostat (RTD).Servicing of pressure relief valve, testing of LOS, complete including manpower & material. | 1 | Job | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tender_Documents_RM_unit1.pdf
Tender Documents • 1.52 MB
BOQ_119703.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .