Loading…
Loading…
Tender Value
₹47.4 L
EMD Value
₹47,446
Closing Date
13 May 2026, 4:00 pmClosed
SE PRED PR KAKINADA
Kakinada
Construction of Burial ground shelter building in Kapileswarapuram village of Kapileswaram mandal in Dr B.R.Ambedkar konaseema district Est cost Rs60.00 lakhs
928455
1/DB/MPLADS/MP(18th LS)2025-26 dt 04.04.2026 of the Superintending Engineer, PR circle,kakinada
OPEN - NCB
Buildings
KONASEEMA
10 documents required · 9 mandatory · 1 optional
₹1,680
₹47,446
29 Apr 2026
29 Apr 2026
29 Apr 2026
Name of the work : Construction of Burial Ground Shelter Building in Kapileswarapuram (V) in Kapileswarapuram (M) Est cost : 60.00 lakhs : Earthwork in excavation for foundation structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH including overhead charges & Contractors profit but excluding GST and seigniorage
Filling with sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including overhead charges & Contractors profit but excluding GST and seignorage charges.
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level. complete including overhead charges & Contractors profit but excluding GST and seignorage charges
Plain Cement Concrete (1:5:10) prop nominal mix (cement: fine aggregate: coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including Cost and Conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) including overhead charges & Contractors profit but excluding GST and seignorage charges
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For 300mm Dia 4.50m depth DUR Piles
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For Pile Caps & Plinth beam
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For Columns (Ground Floor)
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For Columns (First Floor)
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For Columns (Second Floor)
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For Tie Beams (Ground Floor)
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For Roof Beams (First Floor)
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For Roof Beams (Second Floor)
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For Roof Slab (First Floor)
Vibrated Reinforced Cement Concrete (1:1.5:3) M20 grade using Cement Content 330kgs using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. including overhead charges & Contractors profit but excluding GST and seignorage charges For Roof Slab (Second Floor)
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & Contractors profit but excluding GST Ground Floor
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & Contractors profit but excluding GST First Floor
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & Contractors profit but excluding GST Second Floor
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick mixed with water proofing compound at 1Kg/bag of cement, laid over roof slab when it is green, including Cost and Conveyance of all materials and labour charges curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903). including overhead charges & Contractors profit but excluding GST and seignorage charges
Brick Masonry in superstructure with CM (1:8) prop: using 2nd class bricks from approved quarry including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site, including materials, all operational, incidental and labour charges,curing, etc., complete for finished item of work. (APSS No. 501 & 504). including overhead charges & Contractors profit but excluding GST and seignorage charges For First Floor
Brick Masonry in superstructure with CM (1:8) prop: using 2nd class bricks from approved quarry including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site, including materials, all operational, incidental and labour charges,curing, etc., complete for finished item of work. (APSS No. 501 & 504). including overhead charges & Contractors profit but excluding GST and seignorage charges For Second Floor
Plastering for ceiling in CM (1:3) 8mm thick including c/c of all materials like cement, sand,water etc., to site, other taxes on all material and labour charges,curing, etc., complete for finished item of work. (APSS 901,903 & 904) including overhead charges & Contractors profit but excluding GST and seignorage charges ( For Second floor Ceilings)
Plastering for walls in CM (1:5) 12 mm thick including c/c of all materials and labour charges , curing, etc., completed including overhead charges & Contractors profit but excluding GST and seignorage charges (Groound Floor)
Plastering for walls in CM (1:5) 12 mm thick including c/c of all materials and labour charges , curing, etc., completed including overhead charges & Contractors profit but excluding GST and seignorage charges (First Floor)
Plastering for walls in CM (1:5) 12 mm thick including c/c of all materials and labour charges , curing, etc., completed including overhead charges & Contractors profit but excluding GST and seignorage charges (Second Floor)
Painting to new walls with 2 coats of plastic emulsion paint over a priamry coat of white cement of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 including overhead charges & Contractors profit but excluding GST for External walls (Ground Floor)
Painting to new walls with 2 coats of plastic emulsion paint over a priamry coat of white cement of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 including overhead charges & Contractors profit but excluding GST for External walls (First Floor)
Painting to new walls with 2 coats of plastic emulsion paint over a priamry coat of white cement of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 including overhead charges & Contractors profit but excluding GST for External walls (Second Floor)
Painting to new walls with 2 coats of plastic emulsion paint over a priamry coat of white cement of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 including overhead charges & Contractors profit but excluding GST for Internal walls
Supplying, fitting and placing Cast Iron Structure as per drawings and technical specifications for various dia,sections including over laps and wastage, where they are not welded,cutting,bending to required size and shapes placing in position approved size forming grills as per approved designs and drawings including cost and conveyance of Iron from approved sources to site of work with all taxes ,spaces dowles wastage etc., and all operational charges and all labour charges etc, complete for finished item of work. including overhead charges & Contractors profit but excluding GST
Flooring with Vitrified polished floor tiles of size not less than 600mmx600mm and 8-10mm thickness regular finish and normal colours, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete.. including overhead charges & Contractors profit but excluding GST and seignorage charges (First Floor)
Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work. including overhead charges & Contractors profit but excluding GST and seignorage charges (First Floor)
Flooring with Non-skid red or white full body Ceramic floor tiles of Size 600 mm x 600mm and thickness between 8-10 mm and 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work including overhead charges & Contractors profit but excluding GST and seignorage charges
Dadooring to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work including overhead charges & Contractors profit but excluding GST and seignorage charges
Supply and fixing of Sal wood fully Panelled Door of size 1.20 x 2.10 met. with double shutters including cost and conveyance of all materials and labour charges and fixing all necessary fittings like Z-Hold fasts, Hinges, tower bolts, Aldrops etc. complete as per specifications including overhead charges & Contractors profit but excluding GST
Supplying and fixing of R.C.C Precasted Jalis 50mm thick for ventilators including cost and conveyance of all materials and labour charges etc., completed including overhead charges & Contractors profit but excluding GST
Providing and fixing factory made uPVC white colour sliding glazed window upto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge. Two track two panels sliding window made of (big series) frame 67 x 50 mm & sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension . (Area of window above 1.75 sqmupto 2.50 sqm). including overhead charges & Contractors profit but excluding GST
Painting to New wood work with two coats of ready mixed first quality synthetic enamel paint of approved brand over primary coat of white lead after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials,cost of brushes, water to site, etc, and labour charges,curing etc., complete for finished item of work. including overhead charges & Contractors profit but excluding GST
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBDKapileswaram.doc
TENDER_DOCUMENT • 0.55 MB
BOQBurialGround.xlsx
TENDER_DOCUMENT • 0.74 MB
Download all tender documents and submit your bid