Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹37,526.72−₹3.3 L (89.8%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MOHAMMED SANOOB VP L1 | ABDUL RAZZACK E L2 |
|---|---|---|---|---|---|
| 1.00Retaining Wall | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 25.8 | cum | 199.08 ₹5,136.26 Lowest | 204.02 ₹5,263.72 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 9.36 | cum | 277.97 ₹2,601.8 Lowest | 284.88 ₹2,666.48 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.34 | cum | 6,130.14 ₹14,344.53 Lowest | 6,282.43 ₹14,700.89 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.02 | cum | 6,621.8 ₹46,485.04 Lowest | 6,786.3 ₹47,639.83 |
| 1.00 | 4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 27.3 | cum | 9,084.9 ₹2,48,017.77 Lowest | 9,310.6 ₹2,54,179.38 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 36.4 | sqm | 648.8 ₹23,616.32 Lowest | 664.92 ₹24,203.09 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 273.81 | kilogram | 86.87 ₹23,786.22 Lowest | 89.03 ₹24,377.66 |
| 1.01 | OD153523/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 31.5 | metre | 94.95 ₹2,990.93 Lowest | 97.31 ₹3,065.27 |
| 1.01 | OD153854/2025-2026:Providing and fixing Granite of any colour and shade for Name board of required size laid over base of cement mortar 1:4 including all charges etc complete at all levels including lettering and fixing | 1 | each | 2,371.48 ₹2,371.48 Lowest | 2,430.4 ₹2,430.4 |
Tender Value
₹4.4 L
EMD Value
₹10,976
Closing Date
27 Sept 2025, 6:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER
Annual Plan-Kalikavu BP .Pro. No 025/25-26 vazhakkili ST colony-samagra vikasanam. Tuvvur GP
2025_LSGD_800232_3
AE/LID EW/KKV/BP/04/25 26
Open Tender
Civil Works - Others
Item Rate
90 days
KALIKAVU BLOCK
Please refer Tender documents.
4 documents required · 4 mandatory
₹970
Yes
₹10,976
Yes
16 Jun 2026
20 Sept 2025
29 Sept 2025
20 Sept 2025
27 Sept 2025
20 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1327538.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .