Construction of pedestrian path behind SAC (Student Activity Centre) Building at North Campus of IIT Mandi
2026_IITMD_923814_1
IIT Mandi (CW)/SE-2056/2026 -27/1725-27 dated 25-08-2026
Open Tender
Civil Works
Item Rate
45 days
North Campus of IIT Mandi
Please refer to NIT
2 documents required · 2 mandatory
₹1,180
The Registrar IIT Mandi
₹13,952
27 Aug 2026
27 Aug 2026
21 Sept 2026
27 Aug 2026
19 Sept 2026
27 Aug 2026
27 Aug 2026 - 19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within all lead as per direction of Engineer - in - charge.
a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 1 | Cum | - | - |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within all lead as per direction of Engineer-in-charge.
a) In cement mortar as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 2 | Cum | - | - |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth within all lead and lift as directed by Engineer-in-Charge:
a) All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 32 | Sqm | - | - |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth within all lead lift as directed by Engineer-in-Charge.
a) All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 24 | Cum | - | - |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all lead.
a) All kinds of soil as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 27 | Cum | - | - |
| 6 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | 24 | Sqm | - | - |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a)1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 5 | Cum | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 14 | Cum | - | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 9 | Cum | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for :
a) Foundations, footings, bases for columns as per entire satisfaction and direction of Engineer-in-charge including carriage of material in all leads and lifts. | 20 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_970784.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .