| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹94.8 L+₹10.6 L (12.5%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹99.5 L+₹15.3 L (18.1%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.1 Cr+₹28.2 L (33.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹1.2 Cr+₹36.6 L (43.4%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Translink Infrastructure Consultants Pvt. Ltd. L3 | Shweta Technophile Consultants Pvt Ltd L1 | JAIMAN Construction and Consultants LLP L4 | Technical Consultancy Services L2 | M/s Specialized Engineering Services Pvt Ltd L5 | FEEDBACK INFRA PRIVATE LIMITED L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Remuneration of Key Professionals & Sub-Professional | |||||||||
| 1.01 | Team Leader cum road safety auditor | 13.5 | Man - Months | 1,50,000 ₹20,25,000 | 1,40,000 ₹18,90,000 | 1,00,000 ₹13,50,000 Lowest | 1,30,000 ₹17,55,000 | 1,80,000 ₹24,30,000 | 2,90,000 ₹39,15,000 |
| 1.02 | Traffic planner | 13.5 | Man - Months | 1,50,000 ₹20,25,000 | 72,000 ₹9,72,000 Lowest | 1,00,000 ₹13,50,000 | 1,10,000 ₹14,85,000 | 1,60,000 ₹21,60,000 | 1,82,000 ₹24,57,000 |
| 1.03 | Assistant road safety auditor | 13.5 | Man - Months | 1,50,000 ₹20,25,000 | 40,000 ₹5,40,000 Lowest | 50,000 ₹6,75,000 | 55,000 ₹7,42,500 | 80,000 ₹10,80,000 | 1,80,000 ₹24,30,000 |
| 1.04 | Accidnet analyst | 12.5 | Man - Months | 1,20,000 ₹15,00,000 | 40,000 ₹5,00,000 | 30,000 ₹3,75,000 Lowest | 40,000 ₹5,00,000 | 75,000 ₹9,37,500 | 1,00,000 ₹12,50,000 |
| 2.00Support Staff | |||||||||
| 2.01 | Office Manager cum computer | 13.5 | Man - Months | 20,000 ₹2,70,000 | 20,000 ₹2,70,000 | 25,000 ₹3,37,500 | 45,000 ₹6,07,500 | 30,000 ₹4,05,000 | 15,000 ₹2,02,500 Lowest |
| 2.02 | Office Boy | 13.5 | Man - Months | 12,000 ₹1,62,000 Lowest | 12,000 ₹1,62,000 Lowest | 15,000 ₹2,02,500 | 35,000 ₹4,72,500 | 15,000 ₹2,02,500 | 12,000 ₹1,62,000 Lowest |
| 3.00Transportation (Fixed Costs) | |||||||||
| 3.01 | The Vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurances etc.
A. For use of Consultants | 13.5 | Vehicle Month | 30,000 ₹4,05,000 Lowest | 65,000 ₹8,77,500 | 60,000 ₹8,10,000 | 70,000 ₹9,45,000 | 65,000 ₹8,77,500 | 45,000 ₹6,07,500 |
Tender Value
₹2.0 Cr
Closing Date
20 Jun 2022, 11:30 amClosed
Addl. Chief Engineer (PPP), PWD Raj.
Office of the Addl. Chief Engineer (PPP), PWD Raj.
Safety Consultant for HAM Projects under RSHDP II project for 5 roads of the HAM pkg 01 02 03 and 04 in the State of Rajasthan
2022_CEPWD_275729_1
NIT No. 07/2022-23
Open Tender
Consultancy
Item Rate
912 days
Jaipur
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
Project Director (PPP), PWD Jaipur and MD RISL
Exempted
Office of the Addl. Chief Engineer (PPP), PWD Raj.
22 Aug 2022
20 May 2022
20 Jun 2022
20 May 2022
20 Jun 2022
10 Jun 2022
20 May 2022 - 5 Jun 2022
6 Jun 2022
Amount
Remuneration of Key Professionals & Sub-Professional
Team Leader cum road safety auditor
Traffic planner
Assistant road safety auditor
Accidnet analyst
Support Staff
Office Manager cum computer
Office Boy
Transportation (Fixed Costs)
The Vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurances etc. A. For use of Consultants
Duty Travel to site (Fixed Costs)
Professional Staff
Sub - Professional Staff
Office Rent (Fixed Costs)
Office Rent cost includes maintenance, cleaning; repairs etc.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment (Fixed Rental Cost)
Office Furniture and Equipment
Reports and Documents
Inception Report covering all safety audit activities, improvement proposals methodology including finalization of methodology, implementing schedules, as per TOR.
Work shop report
Acciddnet analysis report during desig satge
Final safety gap report
Construction stage accident analysis report
Quarterly safety inspection report
Work shop report ( 2no work shop for each road )= =2*1*20
Preopening safety audit report
Final audit report after compliance of preopening audit report
Accidnet analysis report for OM period
Quarterly safety audit report in OM period
Final comprehensive report
B. Workshop (Fixed Cost)
Work shops for finding of road safety audit with PWD and other stake holders having minimum 20 n. persons
Technical Consultancy Services
Translink Infrastructure Consultants Pvt. Ltd.
JAIMAN Construction and Consultants LLP
M/s Specialized Engineering Services Pvt Ltd
FEEDBACK INFRA PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
RFPSafetyConsultant.pdf
Tender Documents • 2.19 MB
BOQ_490486.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .