Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Fee/PreQual/Technical/Finance | -40.97% | ₹5.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.6 L+₹26,720.18 (5.03%)Admitted-Fee/PreQual/Technical/Finance | -38.00% | ₹5.6 L+₹26,720.18 (5.03%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.7 L+₹35,716.88 (6.73%)Admitted-Fee/PreQual/Technical/Finance | -37.00% | ₹5.7 L+₹35,716.88 (6.73%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.0 L+₹1.7 L (31.9%)Admitted-Fee/PreQual/Technical/Finance | -22.16% | ₹7.0 L+₹1.7 L (31.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Not Submitted all legal Documents and Stamp paper |
Tender Value
₹9 L
EMD Value
₹18,000
Closing Date
4 Aug 2026, 6:00 pmClosed
EE PHED LAKHERI
EE PHED LAKHERI
Maintenance and Repairing work of CENTRIFUGAL and MONOBLOCK Motor Pumps in Pump house and Tube well (Paibalapura Dame) at UWSS Dei
2026_PHCJA_577367_1
NIT NO 22/2026-27 ITEM NO 04
Open Tender
Miscellaneous Works
Percentage
330 days
EE PHED LAKHERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE PHED DIV LAKHERI
₹18,000
Yes
7 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of tube wells which includes round the clock monitoring of tube wells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pump sets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pump sets complete in all respect, maintenance of log-books & History sheet as directed by Engineer-in-charge for tube well per month. (For Urban water Supply Scheme) Complete O&M Rate in Exclusive of GST | - | - | - | - |
| 2 | 11.0 HP to 12.5 HP | 66 | Each | 5,040.68 | ₹3,32,684.88 |
| 3 | 13.0 HP to 15.0 HP | 33 | Each | 5,249.15 | ₹1,73,221.95 |
| 4 | Running expenditure of pump houses which includes complete operation of pump motor , maintenance of log-books as directed by Engineer-in-charge, general up keeping of premises, security arrangements, Regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the Campus of pump house and all other works as mentioned in scope of work in tender document for per pump house per month. (power supply minimum 16 hrs) (excluding repairing of pumping machinery etc.) Rate in Exclusive of GST | - | - | - | - |
| 5 | Up to 100 HP ( for operating load) | 11 | P. Month | 35,796.61 | ₹3,93,762.71 |
stage.html
html • 0.02 MB
finance_1026168.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
2204202627TDofTWPumphouseDeiPaibalapura.pdf
Tender Documents • 0.51 MB
BOQ_1026168.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .