Loading…
Loading…
Tender Value
₹7.7 L
EMD Value
₹15,367
Closing Date
29 Aug 2026, 4:00 pm5d left
Executive Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Day to day operation and maintenance of electrical sub-station no. 3 and other residential and non residential buildings and allied distribution network under sub-stations no. 3 at SAP Latbagan police complex for FY 2026-2027. (1st Call)
2026_WBPHI_5019224_1
WBPHIDCL/EE-(HQ-I)/NIT- 35(e)/2026-2027
Open Tender
ELECTRICAL WORKS M/R
Percentage
Refer to NIT
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹15,367
Yes
19 Aug 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
29 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Electrical (maintenance works)
Note:All the item of SOR of PWD Electrical works w.e.f 1.11.2017 including up to date addenda , corrigenda and the approved non schedule item of works (including 18% GST & 1% labour cess) ( The work shall continue of the entire contract period as per the requirement & as directed by the Engineer in charge .The payment of the executed work shall be made on the basis of - (A) PWD schedule of rates (B) As per the ANNEXURE - 2023/2 for non-schedule items (C) List of rates proposed by PWD (Sub Committee) on 27/02/2026 for different electrical works. | - | LOT | 2,50,000 | - |
| 2 | Day to day maintenance of electrical works
Electrical works under substation No. 3 Electrical Maintenance of 11 KV Substation No.3 consisting of 2 X 315 KVA Transformer, HT Switch Gear, LT Panel Board, Over Head Lines, UG Cables & all electrical installation of Office building, Residential Quarter etc. Under Substation No. 3 of SAP Latbagan, Barrackpore.
The Agency should have National Supervisory certificate ( 1 to 12) & will have to depute 2 (Two) Nos. skilled Electrician per shift, for the maintenance of EI Work and who will have posses the valid works man permit / licene from the Director of Electricity, West Bengal, accordingly in respect of their designation. All staff should be provided with self explanatory photo identity cards issued by the concerned agency. Electrician (Skilled) { 3 Shifts x 274 Day x 1 Man Power}= 822 Man days
Shift Duration:- Morning Shift : (06:00 a.m. to 02:00 p.m.) Day Shift : (02:00 p.m. to 10:00 p.m.) Night Shift : ( 10:00 p.m. to 6 a.m.) (Tools like Megger,Tong tester and tackles should be provided by the agency). ( RATES ARE INCLUDING 10 % AGENCY PROFIT ,18% GST & 1% LABOUR CESS )
N.B.:- Submission of " License to Electrical Contractors" By the Bidder in Mandatory. | - | PerShiftPerElectrician | 630.58 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_5091236.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].