Tender Value
₹5 Cr
EMD Value
₹5 L
Closing Date
29 May 2025, 3:00 pmClosed
Commissioner
113 Thamilzh Salai(Palai Road) Thoothukudi Corporation
CONSTRUCTION OF RCC LINED CANAL WITH RETAINING WALL AND RCC SOLID BRIDGE FOR BUKCLE CANEL CHANINAGE FROM 7140 M TO 7490 M FCI GODOWN
2025_MAWS_556242_1
E1/00049/2025
Open Tender
Civil Works
Works
180 days
Thoothukudi Corporation
Refer Technical Bid
2 documents required · 2 mandatory
₹0
₹5 L
Thoothukudi Corporation
25 Jun 2025
9 May 2025
29 May 2025
9 May 2025
29 May 2025
22 May 2025
15 May 2025
Amount
Clearing the light jungle in the bed with uprooting (40%).including all cost and conveyence of materials and labour charges etc., complete
Clearing the Juliflora jungle with uprooting (60%) for 20m wide sections including all cost and conveyence of materials and labour charges etc., complete
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and M-Sand, silt or other loose soil, wet Sand,or silt not under water, light black cotton soil, Sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete
For Canal
For Retaining wall Footing
Supplying and filling in foundation and basement with filling Crushed Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed -
Vertical Centering Below 1m
Vertical Centering above 1m
For Deck Slab
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Providing and laying in position Standardised Concrete Mix M-25 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 3500 Kg/ 10cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of M-M-Sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials)
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plain Cement Concrete 1:1.5:3 (one cement, one and half fine aggregates and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Refilling with excavated earth in layers of 30 cm watered well rammed and consolidatred conforming to standard specification including labour charges as directed by Engineer in Charge
Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification.
Providing Weep Holes in the RCC Retaining wall by fixing uPVC pipes of 110mm 6KG OD at regular intervals as specified by the Engineer in-charge and as per the standards including the cost of material lead & lifts, cutting charges etc., complete
Expansion Joint filling with Polysulphide sealant upto 30mm width - Vertical Providing and laying 20mm Width with two-part elastomeric UV resistant, non-toxic gun grade liquid polysulphide sealant to fill the expansion joint, sealing joints in water retaining structure. The sealant shall have Elongation min. 500% confirms to ASTM D 412, movement accommodation for butt joint 25% & for lap joints 50%. The sealant should meets the requirement of BS 4254 & ISO:12118. Ensure that apply a coat of polysulphide sealant primer @0.5L/m2 to get better adhesion on prepared surface before placing the sealant. The finished cost including surface preparation, filling foam backer rod, applying masking tape on both sides of the joint & polysulphide sealant filling on gap completely as per specification.
For Retaining wall
Providing expansion joint Bitumen Felt 15mm thick Pad including all cost and materials labour charges etc, complete as per standard specification.
For Flooring
Dewatering using 7.5 HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
Painting Two Coat with Ready Mixed Enamel Paint over the new Iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Win Sudharsan Constructions (BID ID -1353813)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
170140257.xls
BOQ Document • 0.36 MB
170140258.pdf
Tender Document • 3.44 MB
5.00bid.pdf
Tender Document • 0.99 MB
170140260.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .