| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | -0.55% | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 Cr+₹1.9 L (0.50%)Admitted-Finance RAMPUR UTTAR PRADESH | RAMPUR | UTTAR PRADESH | 244701 | -0.05% | ₹3.8 Cr+₹1.9 L (0.50%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 Cr+₹13.9 L (3.70%)Admitted-Finance | +3.13% | ₹3.9 Cr+₹13.9 L (3.70%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.8 Cr
EMD Value
₹8.9 L
Closing Date
29 Jun 2026, 5:00 pmClosed
GM(CIVIL)
MAIN ADMIN BUILDING SECTOR 6 NOIDA
Construction of RCC Drain Near Barat Ghar to Dharam kata in Village Badauli Sector-154 Noida
2026_NOIDA_1160803_1
43/GM/SMWC10/ET/26-27
Open Tender
Civil Works
Fixed-rate
180 days
NOIDA
REFER TO TENDER DOCUMENT
3 documents required · 3 mandatory
₹5,310
NOIDA
₹8.9 L
15 Jul 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
29 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 169 | Cum | 779.76 | ₹1,31,779.44 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | 641 | Cum | 144.93 | ₹92,900.13 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-III) : 8 graded stone
aggregate 20 mm nominal size) | 395 | Cum | 5,746.88 | ₹22,70,017.6 |
| 4 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level | 1,440 | Cum | 7,912.32 | ₹1,13,93,740.8 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 986 | Sqm | 181.64 | ₹1,79,097.04 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 7,883 | Sqm | 335.55 | ₹26,45,140.65 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically treated bars of Grade Fe-500D or More | 1,22,417 | Kg | 82.81 | ₹1,01,37,351.77 |
| 8 | Pumping out Water Caused by Springs , tidal or River Seepage , Briken water Mains or Drain and the Like. | 23,040 | K-Litre | 100.34 | ₹23,11,833.6 |
| 9 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 21 | Cum | 1,347.16 | ₹28,290.36 |
| 10 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 641 | Cum | 120.55 | ₹77,272.55 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
43TD.pdf
Tender Documents • 28.55 MB
BOQ_2175526.xls
BOQ • 0.26 MB
43C.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .