Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H4₹7.8 Cr−₹1.3 Cr (14.7%)Accepted-Finance | ₹7.8 Cr−₹1.3 Cr (14.7%) | H4 | Accepted-Finance ok |
| 2 | H1₹9.1 CrRejected-Finance II D 30 JAI NARYAN VYAS COLONY BIKANER BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹9.1 Cr | H1 | Rejected-Finance ok |
| 3 | H2₹8.9 Cr−₹24.0 L (2.64%)Rejected-Finance | ₹8.9 Cr−₹24.0 L (2.64%) | H2 | Rejected-Finance ok |
| 4 | H3₹8.8 Cr−₹28.9 L (3.17%)Rejected-Finance VILLAGE KITAHA POST KITAHA BIRSINGHPUR DISTRICT SATNA MADHYA PRADESH 485221 | SATNA | SATNA | MADHYA PRADESH | 485221 | ₹8.8 Cr−₹28.9 L (3.17%) | H3 | Rejected-Finance ok |
| Sl No | Description | Qty | Unit | MARUTI CONSTRUCTION COMPANY H1 | M/s Raghavay Corporation H2 | RAM CONSTRUCTION BHOPAL H4 | BHAIYA CONSTRUCTION H3 |
|---|---|---|---|---|---|---|---|
| 1.01 | 1. Design and build sewage treatment plants of installed capacity of 1.0 MLD With Pumping Station and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer survey, design, construction of Manholes and all appurtenant structures and allied works and pumping stations.
3. Survey, review the designs, redesign where necessary, and providing, laying of Sewer Line of length 3094m of DWC/ RCC NP-4 material with manholes and all appurtenant structures and allied works etc. complete.
4. Provision of Reuse of Treated Water
4. Providing, Laying and Insulating of Transformer and laying of H.T. Cable with poles HT feeder Line of 1.1 km | 1 | nos | 5,12,31,000 ₹5,12,31,000 | 5,10,77,600 ₹5,10,77,600 | 5,33,43,414 ₹5,33,43,414 | 5,01,04,093 ₹5,01,04,093 Lowest |
| 1.02 | Operation and Maintenance Cost next 10 Years | 1 | nos | - | - | - | - |
| 1.03 | 1st Year | 1 | nos | 15,34,300 ₹15,34,300 | 14,66,300 ₹14,66,300 | 9,00,000 ₹9,00,000 Lowest | 16,34,300 ₹16,34,300 |
| 1.04 | 2nd Year | 1 | nos | 16,32,358 ₹16,32,358 | 15,54,278 ₹15,54,278 | 9,54,000 ₹9,54,000 Lowest | 17,23,258 ₹17,23,258 |
| 1.05 | 3rd Year | 1 | nos | 17,36,299 ₹17,36,299 | 16,47,534 ₹16,47,534 | 10,11,240 ₹10,11,240 Lowest | 18,36,299 ₹18,36,299 |
| 1.06 | 4th Year | 1 | nos | 18,46,477 ₹18,46,477 | 17,46,387 ₹17,46,387 | 10,71,914.4 ₹10,71,914.4 Lowest | 19,46,477 ₹19,46,477 |
| 1.07 | 5th Year | 1 | nos | 19,63,266 ₹19,63,266 | 18,51,170 ₹18,51,170 | 11,36,229.26 ₹11,36,229.26 Lowest | 20,63,266 ₹20,63,266 |
| 1.08 | 6th Year | 1 | nos | 20,87,062 ₹20,87,062 | 19,62,239 ₹19,62,239 | 12,04,403.02 ₹12,04,403.02 Lowest | 21,87,062 ₹21,87,062 |
| 1.09 | 7th Year | 1 | nos | 22,18,286 ₹22,18,286 | 20,79,974 ₹20,79,974 | 12,76,667.2 ₹12,76,667.2 Lowest | 23,18,286 ₹23,18,286 |
| 1.10 | 8th Year | 1 | nos | 23,57,383 ₹23,57,383 | 22,04,772 ₹22,04,772 | 13,53,267.23 ₹13,53,267.23 Lowest | 24,57,383 ₹24,57,383 |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
26 Feb 2026, 5:30 pmClosed
Nagar Parishad Birsinghpur
Nagar Parishad Birsinghpur
Interception And Diversion of Nallahs with STP works Project of Birsinghpur town under SBM 2.0
2026_UAD_477830_1
NIT/1105/Birsinghpur date 23-01-2026
Open Tender
Miscellaneous Works
Lump-sum
180 days
Birsinghpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹2.8 L
1 Jun 2026
23 Jan 2026
28 Feb 2026
23 Jan 2026
26 Feb 2026
23 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1. Design and build sewage treatment plants of installed capacity of 1.0 MLD With Pumping Station and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer survey, design, construction of Manholes and all appurtenant structures and allied works and pumping stations.
3. Survey, review the designs, redesign where necessary, and providing, laying of Sewer Line of length 3094m of DWC/ RCC NP-4 material with manholes and all appurtenant structures and allied works etc. complete.
4. Provision of Reuse of Treated Water
4. Providing, Laying and Insulating of Transformer and laying of H.T. Cable with poles HT feeder Line of 1.1 km | 1 | nos | 56,93,000 | ₹56,93,000 |
| 1.02 | Operation and Maintenance Cost next 10 Years | 1 | nos | - | - |
| 1.03 | 1st Year | 1 | nos | 16,34,300 | ₹16,34,300 |
| 1.04 | 2nd Year | 1 | nos | 17,32,358 | ₹17,32,358 |
| 1.05 | 3rd Year | 1 | nos | 18,36,299.48 | ₹18,36,299.48 |
| 1.06 | 4th Year | 1 | nos | 19,46,477.45 | ₹19,46,477.45 |
| 1.07 | 5th Year | 1 | nos | 20,63,266.1 | ₹20,63,266.1 |
| 1.08 | 6th Year | 1 | nos | 21,87,062.06 | ₹21,87,062.06 |
| 1.09 | 7th Year | 1 | nos | 23,18,285.79 | ₹23,18,285.79 |
| 1.1 | 8th Year | 1 | nos | 24,57,382.93 | ₹24,57,382.93 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendaedocument.pdf
Tender Documents • 1.73 MB
AnnexureE.pdf
Other Document • 1.57 MB
BOQ_561597.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .