| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹3.8 L (2.36%)Admitted-Finance | ₹1.7 Cr+₹3.8 L (2.36%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹7.1 L (4.41%)Admitted-Finance | ₹1.7 Cr+₹7.1 L (4.41%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 Cr+₹11.3 L (7.00%)Admitted-Finance | ₹1.7 Cr+₹11.3 L (7.00%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ASHUTOSH ENTERPRISES L2 | SHIVAM ENTERPRISES L1 | JAGAT ELECTRICAL & FABRICATORS L3 | KUMAR TRADING COMPANY L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | (A) Survey including preparation of profile & schedule of materials, marking of location (Route Length) | 13 | Per KM | 20,910 ₹2,71,830 | 15,000 ₹1,95,000 Lowest | 21,328 ₹2,77,264 | 21,861 ₹2,84,193 |
| 2.00 | (B) Check survey & final peg marking (Route length) | 13 | Per KM | 10,455 ₹1,35,915 | 8,000 ₹1,04,000 Lowest | 10,664 ₹1,38,632 | 10,930 ₹1,42,090 |
| 3.00 | Cost of excavation of 132 KV Tower/Gantry foundation pits including all earth work, back filling watering and leveling. | 1,400 | Cub Mtr | 209 ₹2,92,600 | 190 ₹2,66,000 Lowest | 213 ₹2,98,200 | 218 ₹3,05,200 |
| 4.00 | Setting of stubs including all foundation work but excluding cost of concreting and excavation (Rate per location) for following 132 KV D/C Towers : DA, DB, DC Towers/Gantry. | 10 | JOB | 3,136 ₹31,360 | 3,000 ₹30,000 Lowest | 3,198 ₹31,980 | 3,277 ₹32,770 |
| 5.00 | Cost of concreting for all types of 132 KV D/C tower gantry foundation including cost of cement coarse sand, stone grid, dewatering, shoring and shuttering, forming, caring but excluding cost of reinforcement bars with 1:2:4 mix concreter (RCC). | 252 | Cub Mtr | 9,200 ₹23,18,400 | 8,100 ₹20,41,200 Lowest | 9,384 ₹23,64,768 | 9,618 ₹24,23,736 |
| 6.00 | Erection of super structure of 132 KV DA, DB, DC towers/Gantry and their extensions including all works above ground level and fitting of danger, number & Phase plate, bird guard ext but excluding hoisting of insulator, hardware & accessories. | 50 | MT | 7,318 ₹3,65,900 | 6,500 ₹3,25,000 Lowest | 7,464 ₹3,73,200 | 7,650 ₹3,82,500 |
| 7.00 | Tack welding of all the bolts up to the height of one section or 05 Mtr from ground level whichever is higher with three tacks of 10 mm/12 mm elctrode & applciation of Zinc rick point on the affected surface inclduign cost materials. | 9,800 | Nos. | 7.15 ₹70,070 | 6 ₹58,800 Lowest | 7.5 ₹73,500 | 7.5 ₹73,500 |
| 8.00 | Laying stringing tensioning and clamping and jointing & jumpering etc of ACSR Panther conductor inclduign hoisting of insulators fitting of all necessary hardware and accessories on of 132 KV S/C line (All three conductors) | 10 | Per KM | 1,02,450 ₹10,24,500 | 65,000 ₹6,50,000 Lowest | 1,04,499 ₹10,44,990 | 1,07,111 ₹10,71,110 |
| 9.00 | Grounding work including all earth work etc for pipe type earthign including cost of all material except earthing pipe. | 40 | JOB | 5,227 ₹2,09,080 | 4,000 ₹1,60,000 Lowest | 5,331 ₹2,13,240 | 5,464 ₹2,18,560 |
| 10.00 | Instlation of steel reinforcement bars in RCC foundation including cost of cutting, welding, binding and placing them in foundation pits. | 2 | MT | 62,730 ₹1,25,460 | 59,000 ₹1,18,000 Lowest | 63,984 ₹1,27,968 | 65,583 ₹1,31,166 |
Tender Value
₹1.4 Cr
EMD Value
₹1.5 L
Closing Date
3 Nov 2020, 12:00 pmClosed
SE ETC UPPTCL GREATER NOIDA
400 KV SUB STATION PALI GAUTAM BUDH NAGAR GREATER NOIDA
FOR BALANCE WORK OF CONSTRUCTION OF 132 KV S/C SIKANDRABAD (220) - JAHANGIRPUR LINE ON TURNKEY BASIS UNDER ETD KHURJA
2020_UPTCL_520682_1
T-86/2020-21ETC/GN
Open Tender
Electrical Works
Fixed-rate
90 days
KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
EE ELECTRICITY 400 KV SUB STATION GREATER NOIDA
₹1.5 L
7 Nov 2020
14 Oct 2020
3 Nov 2020
14 Oct 2020
3 Nov 2020
14 Oct 2020
Amount
(A) Survey including preparation of profile & schedule of materials, marking of location (Route Length)
(B) Check survey & final peg marking (Route length)
Cost of excavation of 132 KV Tower/Gantry foundation pits including all earth work, back filling watering and leveling.
Setting of stubs including all foundation work but excluding cost of concreting and excavation (Rate per location) for following 132 KV D/C Towers : DA, DB, DC Towers/Gantry.
Cost of concreting for all types of 132 KV D/C tower gantry foundation including cost of cement coarse sand, stone grid, dewatering, shoring and shuttering, forming, caring but excluding cost of reinforcement bars with 1:2:4 mix concreter (RCC).
Erection of super structure of 132 KV DA, DB, DC towers/Gantry and their extensions including all works above ground level and fitting of danger, number & Phase plate, bird guard ext but excluding hoisting of insulator, hardware & accessories.
Tack welding of all the bolts up to the height of one section or 05 Mtr from ground level whichever is higher with three tacks of 10 mm/12 mm elctrode & applciation of Zinc rick point on the affected surface inclduign cost materials.
Laying stringing tensioning and clamping and jointing & jumpering etc of ACSR Panther conductor inclduign hoisting of insulators fitting of all necessary hardware and accessories on of 132 KV S/C line (All three conductors)
Grounding work including all earth work etc for pipe type earthign including cost of all material except earthing pipe.
Instlation of steel reinforcement bars in RCC foundation including cost of cutting, welding, binding and placing them in foundation pits.
Dismantalling of A type tower.
Dismantalling of foundation with stub.
Towers (A) Fabrication, Galvanising, Inspection & supply of 132 KV DC Tower including stubs, extensions & stub setting template as per drawing & BOM.
(B) Hot dip galvanized, Hexagon, Round Hexagon head transmission towers bolts, nuts & washers for above structure as per BOM.
Towers Accessories (A) Pipe type earthing mateiral for towers.
120 KN Polymer Insulators for Tension Towers.
70 KN Polymer Insulators for Suspension Towers.
Hardware suitbael for ACSR Panther (A) Double Tension fitting.
(B) Single Tension fitting.
(C) Single Suspension Fitting
(D) P.A Rod
(E) MS Hanger
(F) Vibration Damper
(G) M.S Joint
Earthwire Accessories suitable for 7/10 SWG Earthwire. (A) Tension clamp.
(B) Vibration Damper
(C) Suspension Clamp
(D) Copper Bond
(E) Mis Span Joint
ASHUTOSH ENTERPRISES
JAGAT ELECTRICAL & FABRICATORS
KUMAR TRADING COMPANY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
T86.pdf
Tender Documents • 1.31 MB
BOQ_781991.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .