Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹96.0 CrAdmitted-Finance 1 13 16 G KHAPARADEEH KOTHI CAMPUS CIVIL LINES AYODHYA UTTAR PRADESH 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | L1 | Admitted-Finance | ||
| 2 | L2₹96.5 Cr+₹56.1 L (0.58%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹96.8 Cr+₹80.8 L (0.84%)Admitted-Finance A 20 HIG DUPIEX SANJAY NAGAR SEC 23 GHAZIABAD 201002 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201002 | L3 | Admitted-Finance |
Tender Value
₹95.1 Cr
EMD Value
₹1.9 Cr
Closing Date
17 Apr 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
C.E. KANPUR DEVELOPMENT AUTHORITY
KANPUR DEVELOPMENT AUTHORITY
Construction of 1536 (G Plus 3) Houses at Jawaharpuram Sector-1 under Pradhanmantri Avas Yojna(Part-4).
2021_UPKDA_578236_1
46/AA2/KDA/20-21
Open Tender
Civil Works - Buildings
Fixed-rate
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
FC
₹1.9 Cr
26 Apr 2021
31 Mar 2021
19 Apr 2021
31 Mar 2021
17 Apr 2021
31 Mar 2021
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) lift up to 1.50M and lead up to 30M and cluding filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer in charge up to a distance of 30M from the foundation trenches including all T&P phowarah and basket etc. complete.SOR S.I. NO-251 | - | Cum | - | - |
| 2 | Filling of available excavated earth in trenches, plinth, sides of foundation, etc in layers not exceeding 20 cms in depth, consolidation each deposited layer by ramming and watering including lead upto 50 m. and lift upto 1.5 m.(S.I. No-255) | - | Cum | - | - |
| 3 | Cartage of earth up 10.0 km including all rate as per SOR S.I. NO-231(A)/v | - | Cum | 1 | - |
| 4 | Providing and laying cement concrete in 1:4:8 (1cement :4 coarse sand :8 graded stone ballast 40 mm nominal size) including supply of all materials labour and T&P etc. required for proper completion of the work and curing complete also including curing complete, Including cost of form work. In Foundation and floors. (S.I. NO-281) | - | - | - | - |
| 5 | G.F & F.F. | - | Cum | - | - |
| 6 | S.F. | - | Cum | - | - |
| 7 | T.F. | - | Cum | - | - |
| 8 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge(Note :- Cement content considered in this item is @ 330 kg/cum.Excess cement used as per design mix is not extra payable(DSR 5.33.1) | - | Cum | - | - |
| 9 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using fly ash and cement content as per approved design mix, and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge.(Note :- Cement content considered in this item is @ 330 kg/cum.Excess cement used as per design mix is not extra payable(DSR 5.33.2) | - | Cum | 1 | - |
| 10 | Providing and laying in position ready mixed M-20 grade concrete for reinforced cement concrete work, using fly ash and cement content as per approved design mix, and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge.(Note :- Cement content considered in this item is @ 303 kg/cum.Excess cement used as per design mix is not extra payable(DSR 5.33.2)-DSR 16.76 | - | Cum | 1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
TenderDocument4.pdf
Tender Documents • 0.84 MB
BOQ_888987.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .