Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74,737.12Accepted-AOC 11 | KANNUR | KERALA | 670511 | ₹74,737.12 | L1 | Accepted-AOC Accepted Vide Resolution No. 4 dtd.02/02/2026 of Muvattupuzha municipality |
| Sl No | Description | Qty | Unit | MUHAMMED RIYAS L1 |
|---|---|---|---|---|
| 1.00MAINTENANCE | ||||
| 1.00 | 12.26.1:Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately).6 mm thick cement fiber board as per IS: 14862 | 44.62 | sqm | 969.84 ₹43,279.11 |
| 1.00 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 105 | kg | 230.93 ₹24,247.65 |
| 1.00 | 13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm | 23.62 | sqm | 199.31 ₹4,708.70 |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 7 | sqm | 357.38 ₹2,501.66 |
Tender Value
₹74,737
EMD Value
₹1,868
Closing Date
21 Jan 2026, 10:00 amClosed
Assistant Engineer
Office of the Assistant Executive Engineer LIDEW Muvattupuzha Municipality
162/2025-2026 IN WARD 18-MAINTENANCE OF SHE LODJE IN WARS-18 AT MOOVATTUPUZHA MUNICIPALITY RETENDER
2026_LSGD_827172_10
09/2025-26/AE/LSGD/MVPZA
Open Tender
Civil Works - Others
Muvattupuzha Municipality
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹1,868
23 Apr 2026
14 Jan 2026
22 Jan 2026
14 Jan 2026
21 Jan 2026
14 Jan 2026
MAINTENANCE
12.26.1:Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately).6 mm thick cement fiber board as per IS: 14862
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1388160.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.08 MB
viewsbd.pdf
Other Document • 1.87 MB
viewnit.pdf
Tender Documents • 0.07 MB
BOQ_1388160.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid