Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.5 Cr+₹19.6 L (15.2%)Admitted-Finance PLOT NO M 22 23 CHANDAKA INDUSTRIAL ESTATE PATIA VISIONTEK BUILDING POSTMASTER POST OFFICE K I I T SUB OFFICE KHORDA ORISSA OR INDIA IN PIN CODE 751024 PATIA BHUBANESWAR DIST KHURDA ODISHA | KHORDHA | ODISHA | 751024 | L2 | Admitted-Finance | ||
| 3 | L3₹1.5 Cr+₹24.0 L (18.6%)Admitted-Finance E 11 BHUBANESWAR INFOCITY PATIA VILLAGE TOWN CHANDAKA INDUSTRIAL ESTATE CITY BHUBANESWAR KHURDA KHORDHA ODISHA 751024 INDIA | KHORDHA | ODISHA | 751024 | L3 | Admitted-Finance | ||
| 4 | L4₹1.8 Cr+₹50.3 L (39.0%)Admitted-Finance 147 A BASEMENT SANT NAGAR EAST OF KAILASH NEW DELHI 110 065 | SOUTH | DELHI | 110065 | L4 | Admitted-Finance | ||
| 5 | L5₹1.9 Cr+₹56.8 L (44.1%)Admitted-Finance PLOT 522 3458 NEAR UTKAL HYUNDAI PAHAL BHUBANESWAR DISTRICT KHORDHA ODISHA PINCODE 752101 | BHUBANESWAR | KHORDHA | ODISHA | 752101 | L5 | Admitted-Finance |
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
5 Sept 2026, 5:00 pmClosed
Additional Chief Engineer
O/O ACE,SIC,BERHAMPUR
Forest Diversion Proposal and Obtaining Stage-I and Stage-II clearance from MoEF and CC, GoI for forest land proposed for Diverson for Upper Vansadhara Irrigation Project in Rayagada District of Odisha.
2026_CESI_138224_2
ACESICB-02/2026-27
Open Tender
Consultancy Services
Percentage
610 days
DISTRICT-RAYAGADA
refer DTCN
3 documents required · 3 mandatory
₹10,000
₹2.2 L
19 Sept 2026
10 Aug 2026
7 Sept 2026
10 Aug 2026
5 Sept 2026
10 Aug 2026
10 Aug 2026 - 5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Data Collection providing all Effort and Resource (Manpower, infrastructure, transport) deployment based on Lumpsum variable estimate depending on no. of Revenue Map Sheets, No. Of RoRs as available with DoWR etc. all complete. | 1 | L.S. | 2,50,000 | ₹2,50,000 |
| 2 | Secondary Data Collection providing Effort and Resource (Manpower, infrastructure, transport) deployment based on Lumpsum variable estimate depending on no. of. Patches and extent of notified forest area, No. of Toposheets required. Procurement of HRSI. etc. all complete. | 1 | L.S. | 2,50,000 | ₹2,50,000 |
| 3 | Data Compilation providing Effort and Resource (Manpower, infrastructure) deployment based on Lumpsum variable estimate depending on verification of land schedule with RoR including Sabik Comparison, No. of village revenue cadastral map (digitisation, mosaicing) etc. all complete. | 1 | L.S. | 2,50,000 | ₹2,50,000 |
| 4 | Providing Effort and resource such as manpower, infrastructure, equipment, logistics and transport for DGPS Survey of forest land and ORSAC certification basing on No. of village cadastral maps involved, requirement of provisional geo-referencing. No. of PCPs involved, Demarcation of forest area as per divisional requirement. Computation of forest land area through digitization and comparison with area indicated in forest land schedule. etc. all complete. | 100 | Per Cadastral Sheet | 2,750 | ₹2,75,000 |
| 4.01 | DGPS Survey & Geo-referencing of Forest Land | - | - | - | - |
| 5 | Identification of Primary Control Points (PCP) for DGPS observations for Geo-referencing of Reservoir Area. etc. all complete. | 100 | Nos | 8,900 | ₹8,90,000 |
| 6 | Identification of secondary Control Points (SCP) for DGPS observation for Geo-referencing of Reservoir Area . etc. all complete. | 800 | Nos | 2,420 | ₹19,36,000 |
| 7 | Identification of Secondary Control Points (SCP) in cadastral map for Geo-referencing of Reservoir Area etc. all complete. | 800 | Nos | 3,630 | ₹29,04,000 |
| 8 | Geo-referencing as per SCPS and identification of forest land patches for Geo-referencing of Reservoir Area etc. all complete. | 100 | Per Cadastral Sheet | 440 | ₹44,000 |
| 9 | Providing Primary Control Points (PCP) Pillar (0.1x0.1x0.9) mtr including cost, carriage, colouring and fixing in position for Geo-referencing of Reservoir Area etc. all complete. | 100 | Nos | 570 | ₹57,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Dtcn2.pdf
Tender Documents • 1.28 MB
BOQ_605227.xls
BOQ • 0.26 MB
1corrigendum.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .