| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | 1 | Accepted-AOC Lowest bidder | |
| 2 | 2₹3.3 L+₹34,080.39 (11.6%)Rejected-AOC | 2 | Rejected-AOC hishest bidder | |
| 3 | 3₹3.3 L+₹36,177.20 (12.4%)Rejected-AOC NULL | 3 | Rejected-AOC Highest bidder | |
| 4 | 4₹3.9 L+₹95,580 (32.6%)Rejected-AOC | 4 | Rejected-AOC highest bidder |
Tender Value
Refer Docs
EMD Value
₹8,300
Closing Date
11 Jan 2021, 6:55 pmClosed
Assistant Executive Engineer
Irrigation Sub Division Alappuzha
MLA-SDS -Investigation estimate of construction of foot bridge across Kakkathuruth kayal from Kakkathuruthu ferry to Kakkathuruthu Island in Ezhupunna Panchayath of Aroor LAC.
2020_Irrig_403428_1
05/AEE/ISDA/2020-21
Open Tender
Civil Works - Others
Item Rate
180 days
Ezhupunna
Please refer Tender documents.
6 documents required · 6 mandatory
₹730
Yes
₹8,300
Yes
29 Jan 2021
31 Dec 2020
15 Jan 2021
31 Dec 2020
11 Jan 2021
31 Dec 2020
Amount
INVESTIGATION ESTIMATE
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
60.11.1 : FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
60.11.2 : Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day )
60.11.5 : Providing BOUNDARY STONE .- 30*30*75 cm of hard stone 15cm chiseled dressed on all four sides including top including earthwork excavation and levelling course.
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.a.2 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.
56.3.b.1 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.3.b.2 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.
56.3.c.1 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.3.c.2 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For under water.
56.3.d.1 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.3.d.2 : Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For under water.
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
od20149/2020_2021/IA : CORE BOXES-of size 150*27*5.3 cm(4 slots for each box) including packing of sampleswith proper cushioning to avoid further damage during transportation.
56.9.1 : Erecting platform over 2 nos of 2nd Class Boat USING Mango wood planks of of not less than 30 mm thick, Mango wood joists of 100mm x 70mm at 60cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete excluding hire of boats (A Platform of Minimum size 6.00m x 5.00m will be required)
56.10 : Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
56.14.b : Cross section details:- Thodu.
56.15.b : Hydraulic Velocity Calculation:- Thodu
Devasia Sebastian
G S Infrastructure
THOMAS ANTONY
Bidder Name
Devasia Sebastian
G S Infrastructure
THOMAS ANTONY
AA AND S CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_573656.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .