| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC MOHANAVILASAM PUTHUMALA P O ADOOR | ADOOR | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.7 L+₹53,064.91 (8.55%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | G.SUDHAKARAN PILLAI L1 | JAIMES MATHEW L2 |
|---|---|---|---|---|---|
| 1.00Annual Maintenance- Kodumon Distributary | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 24,750 | sqm | 18.09 ₹4,47,727.5 Lowest | 20 ₹4,95,000 |
| 1.00 | OD3482/2025-2026:Engaging Man mazdoor for removing floating materials and other vegetation from cnals and removing deposited earth silt from canal bed tho avoid overflow of water, construction of temporory bund across canals for control and regulate flow of water to minors and field boothies and for greesing oiling and operation of various shutters etc complete during water distribution period as per the direction of departmental officers at site | 74 | each | 1,076.76 ₹79,680.24 Lowest | 1,096 ₹81,104 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 25 | each | 375.76 ₹9,394 Lowest | 395 ₹9,875 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 10.31 | cum | 256.34 ₹2,643.63 Lowest | 286 ₹2,949.52 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.69 | cum | 7,893.22 ₹13,323.76 Lowest | 7,993 ₹13,492.18 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 30 | sqm | 384.22 ₹11,526.6 Lowest | 394 ₹11,820 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.5 | cum | 8,526.29 ₹38,368.31 Lowest | 8,626 ₹38,817 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 53.5 | sqm | 342.07 ₹18,300.75 Lowest | 392 ₹20,972 |
Tender Value
₹6.2 L
EMD Value
₹15,608
Closing Date
25 Sept 2025, 5:00 pmClosed
Assistant Executive Engineer
KIP Sub Division No.1 Adoor
GENERA KIP O and M Annual Maintenance 2025 26 KIPO and M Annual maintenance of Kodumon distributary from Ch5315 to Ch16315m Kodumon West minor distributary from Ch 0 to Ch3280m Kodumon east minor distributary from Ch 0 to Ch1990m Murinjakal minor d
2025_Irrig_799158_1
IRR/PII/TR/2608/2025_5_2_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Kodumon
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,380
Yes
₹15,608
Yes
5 Dec 2025
18 Sept 2025
27 Sept 2025
18 Sept 2025
25 Sept 2025
18 Sept 2025
Amount
Annual Maintenance- Kodumon Distributary
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD3482/2025-2026:Engaging Man mazdoor for removing floating materials and other vegetation from cnals and removing deposited earth silt from canal bed tho avoid overflow of water, construction of temporory bund across canals for control and regulate flow of water to minors and field boothies and for greesing oiling and operation of various shutters etc complete during water distribution period as per the direction of departmental officers at site
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
JAIMES MATHEW (BID ID -2355491)
Bidder Name
G.SUDHAKARAN PILLAI
JAIMES MATHEW
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1324886.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .