Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹55,000
Closing Date
7 Oct 2026, 6:30 pmClosed
N A MAKARANI
BUILDING / STRUCTURAL ADEQUACY ASSESSMENT AND RETROFITTING / STRENGTHENING OF EXISTING AMMONIA CONTROL ROOM
349352
GNFC-AMUGL/PROJECT/CIVIL/002
Open
Civil Works
Works
Bharuch
25 documents required · 1 mandatory · 24 optional
₹55,000
7 Oct 2026
28 Sept 2026
8 Oct 2026
28 Sept 2026
5 Oct 2026
28 Sept 2026
Providing and laying of special repair material micro-concrete for
reinstatement of members using Single component, high strength,
high flow cementitious micro-concrete having compressive strength
minimum of 50 N/mm2 at 28 days of approved make such as if
required using pumping device for uniform flow of Microconcrete.
All as per instruction of EIC. For work upto all levels.
Earth work in excavation in all kinds of soils by mechanical means /
manual means in foundation trenches, pits, pipe trenches, drains etc.
including dressing of sides and ramming of bottoms, with required
R-20 scaffolding, shoring and shuttering as required, for depth of M3 285.00 -
excavation from 1.5 m to 3 m from Ground Level, including getting
out the excavated soil and disposal of surplus excavated soil as
directed, within a lead of 50 m.
Removal/ transportation of all type of earth/soil, debris, ash etc.
R-30 including loading, carting up to 4 kms, unloading, levelling & M3 285.00 -
dressing as directed by the EIC.
Filling with available earth in layers of 200-300 mm in trenches, pits,
foundation, floor, embankment etc. in layers including compacting by
ramming and watering, all complete as directed by Engineer-in-
Chipping of corroded concrete surface upto thickness of 50 mm &
opening of corroded reinforcement, Cleaning of exposed surface of
RCC with wire brush, water jet, cleaning of exposed rebars, removal
of all loose materials, Thorough cleaning of the total surface, removal
of carbonated top layer of concrete by wire brushing for work upto all
level including required tools, machineries, disposal of waste
materials within lead of 4 km. Work should be carried out carefully
without disturbing/ damaging the RCC members.
Demolishing of concrete (RCC/ PCC) of any grade, manually and/or
by mechanical means for work upto all levels with all labour, tools,
scaffolding, safety arrangement including separating and cutting
R-60 reinforced steel, straightening, stacking for re use or returning to M3 55.00 -
GNFC scrap yard with loading, unloading and transportation,
disposal of debris upto lead of 4 kms by loading, transporting,
unloading and levelling etc complete as directed by EIC.
Demolishing of brick work masonry (plastered/ unpastered)
manually/ mechanical means at all levels with all labour, tools,
scaffolding, safety arrangement etc including stacking of serviceable
material and disposal of unserviceable material within lead of 4 km,
including loading, transpiration, loading, levelling etc. as per direction
of Engineer-in-charge.
Dismantling tile/ stone work in floors, dado, skirting of all thickness,
at all levels, with required scaffolding including stacking of
serviceable materials, disposal of waste materials within 4 km lead
with loading, transportation, unloading, levelling etc. complete.
Labour charges for removal of existing false ceiling of metallic/
gypsum board/ PVC/ wooden/ pop / e-board etc. including
depositing the removed materials in GNFC Stores or any location
Labour charges for removing of false floor including steel support,
R-100 stringer steel members & boards and depositing at stores as directed M2 45.00 -
by EIC with all required labor tools and tackles etc complete.
Providing and laying Plain Cement Concrete (PCC) of mix 1:3:6 (1
cement : 3 fine aggregate : 6 graded stone aggregate, 40 mm nominal
size) in foundations, substructures, floors and other locations as
R-110 specified, including batching, mixing, transporting, placing, M3 15.00 -
compacting, vibrating, finishing, curing and all incidental works,
complete with all materials, labour, tools, tackles, equipment and
machinery, as directed by the Engineer-in-Charge (EIC).
Providing and laying Reinforcement Concrete (RCC) of mix 1:1.5:3 (1
cement : 1.5 fine aggregate : 3 graded stone aggregate, 40 mm nominal
size) in foundations, substructures, floors and other locations as
R-120 specified, including batching, mixing, transporting, placing, M3 55.00 -
compacting, vibrating, finishing, curing and all incidental works,
complete with all materials, labour, tools, tackles, equipment and
machinery, as directed by the Engineer-in-Charge (EIC).
Providing & flxing pre-coated Gl 'Gyptech i Armstrong' false ceiling of
600 x 600 mm grid:- Pre-Coated G.l. angle are leveled at the required
position above the finished ceiling line and fixed to the wall at 600mm
centers. Pre-coated main 'T' is suspended from the fastener at
mm centers apart with the help of fastener, rawl plug & ceiling angle.
Pre-coated cross 'T' section snap fixed at the main 'T' at 600/1200mm
R-130 to form 600mm x 600mm and 600mm x 1200mm grid respectively. M2 45.00 -
Panels size 595 x 595mm /595 x 1190mm'Main Tee
38x24x3600x0.3mm/ Main Tee - 32x24x3000x0.3mm' Cross Tee -
24x24x1200x0.3mm/ Cross Tee - 24v24x600x0.3mm',Wall Angle
24x24x3090x0.4mm,lncluding providing & fixing of 4 mm thick
cement-board blocks cut to required size & shape, finish & texture
with all tools, tackles, labour & material etc. complete as directed.
Providing and fixing vitrified floor tiles in different sizes (thickness to
be specified by the manufacturer) with water absorption less than
0.08% and conforming to IS: 15622, in colours/ design, laid on around
R-140 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with M2 145.00 -
grey cement slurry including grouting the joints with white cement
and matching pigments etc., complete for work at all levels. Basic Rate
of vitrified tiles : Rs. 400/Sq.M.
Providing and laying brick masonry with well burnt good quality
locally available red bricks / fly ash bricks in CM 1:6 using screened
sand in super structure for walls etc. upto 5 m height from G.L.
including scaffolding, watering, proper bonding, racking out the
joints, cleaning, curing, etc. complete with all labour and materials and
as directed by the EIC
Repairs & renovation of false flooring comprising of following :
Carefully removal of existing false floor panel boards from position.
Providing and fixing 2 mm thick laminate of high pressure, antistatic
and scratch proof, on one side of the boards. Removal of existing
laminates of the boards, if required. Laminate sheets are to be fixed
with suitable adhesive.· Providing and fixing hard PVC tapered
beading covering side thickness of the boards.· Adjusting and
making the sizes of the boards to requirement.
Providing and applying 12 to 15 mm thick smooth cement plaster in
CM 1:4 mix using screened sand of approved quality on brick
masonry and RCC work as required including racking of joints of
R-170 masonry and roughening of concrete surface to receive plaster, M2 100.00 -
required scaffolding, finishing smooth with cement slurry-mixing,
applying, watering, curing with all labours and materials for work
upto 10 m level above GL etc., complete.
Providing and laying anticorrosive treatment of reinforcement by any
approved make rebar corrosion protection system to existing
reinforcement (The application shall be by brush). Process is to be
R-180 complete as per the recommendation of manufacturer and direction of RMT 2,000.00 -
Engineer-in-charge. For payment exposed length of reinforcement will
be measured. Rates are inclusive for work at all heights including all
labours, tools and machineries, plants, scaffolding.
Erection and removal of steel scaffolding in all the areas of GNFC
R-190 (with scaffolding materials of contractor) etc. complete as directed by M3 50.00 -
Total Cost of Work (Incl. GST 18.00%) : -
Note: GNFC shall not issue/provide any material as Free Issue Material
(FIM). All scope of work and item rates are strictly on a "with material"
basis, including but not limited to Cement, Reinforcement Steel, and all
other required construction/raw materials, which must be arranged and
supplied entirely by the Bidder/Contractor.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GES for Civil Works.pdf
Scope of Work.pdf
Existing Drawings.pdf
APPROVED VENDOR LIST CIVIL.pdf
Schedule of Quantity.pdf
Proposed Drawing.pdf
Commercial Quetionary.pdf
GST-SPECIAL TERMS CONDITIONS.pdf
STANDARD SPECIFICATION OF CIVIL AND STRUCTURAL WORK.pdf
Civil Standard Operating Procedure.pdf
GENERAL CONDITIONS OF CONTRACT.pdf
GNFC Safety rules.pdf
Guide line to contractor as per ISO-14001 and OHSAS-18001-1999.pdf
Labor laws.pdf
OHS GUIDELINES.pdf
RESOLUTION OF DISPUTES CLAUSE.pdf
EXCEPTION AND DEVIATION FORM.pdf
Tender Undertaking.pdf
TENDER NOTICE.pdf
Schedule of Quantity.AMD1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .