Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | ₹13.1 L | L1 | Accepted-AOC Accept |
| 2 | L2₹13.4 LRejected-Finance | ₹13.4 L | L2 | Rejected-Finance Reject |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SKP CONSTRUCTIONS L2 | SMS CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Upgradation of the Road from Km.12/6 of Vairamadai Kuppam Road to Semmankarai-Ellai Kaatu Valasu Road(R-324) Km.0/0 to 0/390 H/.Thukkachi Panchayat | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc… | 408 | m2 | 8 ₹3,264 | 6.29 ₹2,566.32 |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc. complete, as | 137.7 | m3 | 150 ₹20,655 | 140.38 ₹19,330.33 |
| 4.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum. moisture content and hire & fuel charges for power roller. water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, | 85 | m3 | 360 ₹30,600 | 340.94 ₹28,979.90 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant camage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges. rentals for machinery, fuel and all other incidental charges etc., complete. | 190.62 | m3 | 2,420 ₹4.6 L | 2,382.74 ₹4.5 L |
| 6.00 | Providing and laying of Prime coat over the BT Surface using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,525 | m2 | 95 ₹1.4 L | 85.79 ₹1.3 L |
| 7.00 | Providing and laying of Tack coat over the BT Surface using Emulsion at the rate of 2.5Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,525 | m2 | 22 ₹33,550 | 19.91 ₹30,362.75 |
| 8.00 | Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity. carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc... including labour for attending to paver to site etc.including hire charges and fuel charges loe 20-301 CMP with bitumen boiler, tipper trucks paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental | 38.13 | m3 | 11,600 ₹4.4 L | 11,554.43 ₹4.4 L |
| 9.00 | HM Stone (650X150X100mm) | 1 | Nos | 600 ₹600 | 574.58 ₹574.58 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,04,687 ₹2.0 L | 1,99,334 ₹2.0 L |
Tender Value
Refer Docs
EMD Value
₹13,250
Closing Date
27 Nov 2025, 3:00 pmClosed
BDO(V.Pt), K.Paramathi, Thukkachi Panchayat
BDO(V.Pt), K.Paramathi, Thukkachi Panchayat
Upgradation of the Road from Vairamadai Kuppam Road to Semmankarai Ellai Kaatu Valasu Road at Thukkachi Panchayat
2025_RDTN_625176_1
Upgradation of the Road from Km12/6 of Vairamadai Kuppam Road to Semmankarai Ellai Kaatu Valasu Road
Open Tender
Civil Works - Others
90 days
K.Paramathi Union Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹13,250
Yes
30 Dec 2025
21 Nov 2025
27 Nov 2025
21 Nov 2025
27 Nov 2025
21 Nov 2025
Amount
Name of the Work : Upgradation of the Road from Km.12/6 of Vairamadai Kuppam Road to Semmankarai-Ellai Kaatu Valasu Road(R-324) Km.0/0 to 0/390 H/.Thukkachi Panchayat
Clearing the Scrub jungle including all labour charges for burrying and burning etc…
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc. complete, as
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum. moisture content and hire & fuel charges for power roller. water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant camage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges. rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of Prime coat over the BT Surface using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat over the BT Surface using Emulsion at the rate of 2.5Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity. carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc... including labour for attending to paver to site etc.including hire charges and fuel charges loe 20-301 CMP with bitumen boiler, tipper trucks paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental
HM Stone (650X150X100mm)
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SKP CONSTRUCTIONS (BID ID -1522367)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_747572.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid