Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹48.8 LAccepted-AOC | ₹48.8 L Quoted ₹49.3 L | I | Accepted-AOC L1 Bidder |
| 2 | I₹67.1 LRejected-AOC | ₹67.1 L | I | Rejected-AOC L2 Bidder |
| 3 | III₹69.0 LRejected-AOC | ₹69.0 L | III | Rejected-AOC L3 Bidder |
| 4 | IV₹70.1 LRejected-AOC | ₹70.1 L | IV | Rejected-AOC L4 Bidder |
| 5 | Rejected-Technical WEAR MODI BUILDING MATERIAL KANGANPUR ROAD SIRSA | - | - | Rejected-Technical EMD or HEWP EMD Exemption Certificate not submitted. NSIC submitted for EMD exemption indicate MSE unit eligible in the Central Govt Store Purchase Program not for State Govt. Deptt and does not indicate for Rate Contract-Oriented works. |
| Sl No | Description | Qty | Unit | shri krishna associate L2 | JAYTECH ENGINEERS AND CONTRACTORS L4 | GURU ENTERPRISES L3 | RITIK CONYTACTOR L1 |
|---|---|---|---|---|---|---|---|
| 1.00Description | |||||||
| 1.01 | ARC for Hygienic Cleaning of Main Plant Building and its Common Auxiliary Buildings of Unit-I&II, 2x300 MW, DCRTPP, HPGCL, Yamuna Nagar
(For FY 2026-27):
Cleaning, Sweeping and removal of garbage from main plant building in floors at all levels and control rooms, engineers rooms equipment rooms, C&I lab, battery rooms, environmental lab, documentation rooms and cabins in the above area and detail as per drawing/scope specified in the specification. The scope of work also includes cleaning, sweeping & removal of garbage from the various other common auxiliary buildings i.e. Compressor House, CW Pump House, Chlorination Building, Clarified Water Pump House, Chemical House, DG set Building, Day Oil Tank Area Pump house, DM Plant Building, ESP Control Room Unit-I&II, Fuel Oil Unloading Pump house, CW Treatment Building, Air Transport Compressor House & collection tank, Ash Water Pump House, Ash slurry Pump House, Ash Water recovery pump house at Ash, Raw water Pump House, Intake water pump house at WYC, Switchyard control Room, Workshop Building, Roof of Control Room Unit-I&II, Roof at 18m, Roof at 25m, TG Floor Roof at 33m and Roof of all auxiliary buildings inclusive of minimum Consumables (strictly as per Annexure-VII) | 12 | Month | 56,87,988 ₹67,11,825.84 | 59,40,000 ₹70,09,200 | 58,44,000 ₹68,95,920 | 41,76,000 ₹49,27,680 Lowest |
Tender Value
Refer Docs
EMD Value
₹89,000
Closing Date
27 Apr 2026, 6:00 pmClosed
Virender Gupta
CE DCRTPP Yamuna Nagar
ARC for Hygienic Cleaning of Main Plant Building and its Common Auxiliary Buildings of Unit-I and II, 2x300 MW, DCRTPP, HPGCL, Yamuna Nagar
2026_HBC_513842_1
202687BF620F 1122 42A9 863D EF53A945E354711PGC
Open Tender
Power/Energy Projects/Products
Works
365 days
RATTANPURA
As Per NIT
2 documents required · 2 mandatory
₹1,180
₹89,000
Yes
8 Jul 2026
9 Apr 2026
29 Apr 2026
9 Apr 2026
27 Apr 2026
9 Apr 2026
9 Apr 2026 - 11 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description | |||||
| 1.01 | ARC for Hygienic Cleaning of Main Plant Building and its Common Auxiliary Buildings of Unit-I&II, 2x300 MW, DCRTPP, HPGCL, Yamuna Nagar
(For FY 2026-27):
Cleaning, Sweeping and removal of garbage from main plant building in floors at all levels and control rooms, engineers rooms equipment rooms, C&I lab, battery rooms, environmental lab, documentation rooms and cabins in the above area and detail as per drawing/scope specified in the specification. The scope of work also includes cleaning, sweeping & removal of garbage from the various other common auxiliary buildings i.e. Compressor House, CW Pump House, Chlorination Building, Clarified Water Pump House, Chemical House, DG set Building, Day Oil Tank Area Pump house, DM Plant Building, ESP Control Room Unit-I&II, Fuel Oil Unloading Pump house, CW Treatment Building, Air Transport Compressor House & collection tank, Ash Water Pump House, Ash slurry Pump House, Ash Water recovery pump house at Ash, Raw water Pump House, Intake water pump house at WYC, Switchyard control Room, Workshop Building, Roof of Control Room Unit-I&II, Roof at 18m, Roof at 25m, TG Floor Roof at 33m and Roof of all auxiliary buildings inclusive of minimum Consumables (strictly as per Annexure-VII) | - | Month | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_592664.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .