Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance VILLAGE P O JASSAI TEHSIL BAROH DISTRICT KANGRA H P | L1 | Accepted-Finance L1 | |
| 2 | L2₹3.7 L+₹17,126.87 (4.89%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.7 L+₹19,462.35 (5.56%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹3.9 L
EMD Value
₹7,800
Closing Date
22 Apr 2026, 6:00 pmClosed
Executive Engineer
HPPWD Division Kotla Behar
C/o PCC Retaining wall RD 18/180 to 18/200 LHS
2026_PWD_134324_14
EE Letter No. 129-40 dtd. 10.04.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Kotla Behar
refer to tender document
12 documents required · 12 mandatory
₹350
₹7,800
22 Jun 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
22 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches etc. in earth work in all classification of soil such as pick work, jumper work, pick jumper work, blasting work, jumper blasting work, soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting work is prohibited, chiseling or any other mixed variety of soil, including shoring, shuttering and pumping out water upto any depth or any quontam of water including slush which may be arise during de-watering removal of slush and stacking the serviceable and un-serviceable material clear from the edge of excavation as direction of Engineer-In-Charge and retuning the stacked soil in 15cm (Fifteen centimeter) layers, when required into plinths, sides of foundation etc; consolidating each deposited layer by ramming, watering and then disposing of all excavated earth as directed by the Engineer-in-Charge, within all leads, lifts of materials and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge. The rates inclusive of octori, royality, Malkhana, toll taxes, GST and any other taxes imposed by the Government. | - | Per Cubic metre | - | - |
| 2 | Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate) 40 mm (forty millimetre) nominal size.in retaining wall including the cost of centering, shuttering and finishing complete as per approved drawing, design, specifications and as per directions and entire satisfaction of the Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes, GST and any other taxes imposed by the Government. | - | Per Cubic metre | - | - |
| 3 | Providing weep holes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimetres) diameters P.V.C. pipe extending through the full width of the structure with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specifications Clause 614, 709, 1204.3.7 , as per direction of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidental. The rate is including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.. | - | Each | - | - |
| 4 | Back filling behind abutment, wing wall and return wall complete as per drawing & Technical Specification Clause-1204.3.8 Granular material and as per the entire satisfaction and direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental. The rate is including octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government. | - | Per Cubic metre | - | - |
| 5 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete nominal mix 1:3:6 (One cement isto three sand isto six graded crushed stone aggregate 20mm (twenty millimeter) nominal size), on ground or under water for all type of structure, in drain,edge wall and the like etcetera complete including pumping or bailing out water, dewatering (surface/sub soil water)including removal of slush which may arise at time of laying concrete for all heights/depths including cost of form work and curing complete for 14 (fourteen) days as per drawing and MORD Technical specification section 800, 900, 1200 and 1600 as per entire satisfaction and directions of Engineer-in-charge, including carriage of materials within all leads, lifts and other incidentals. The rate is including Octroi, Royality, Malkana, toll tax,GST or any other taxes imposed by the Government. | - | Per Cubic metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
SBD.rar
Tender Documents • 2.23 MB
BOQ_198684.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .