Loading…
Loading…
Tender Value
₹5.6 L
EMD Value
₹14,000
Closing Date
29 Aug 2026, 6:00 pm2d left
Deputy Conservator of Forests and Wildlife Warden
Wayanad Wildlife Division Sulthan Bathery P O Wayanad Dist. Kerala Pin 673592
IMPROVEMENT OF ECO TOURISM BUS PARKING AREA UNDER MUTHANGA FOREST STATION IN MUTHANGA RANGE
2026_FD_866383_1
W6-44564/2026
Open Tender
Civil Works - Others
Item Rate
Sulthan Bathery
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,120
Yes
₹14,000
Yes
21 Aug 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
29 Aug 2026
21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.2 | m3 | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | m3 | - | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | m3 | - | - |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | m3 | - | - |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs, having slope up
to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, | 1 | m3 | - | - |
| 6 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 10,671.57 | kg | - | - |
| 7 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | m2 | - | - |
| 8 | Centering and shuttering including strutting, etc. and removal of form for:Walls (any
thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1 | m2 | - | - |
| 9 | Centering and shuttering including strutting, etc. and removal of form for:Suspended
floors, roofs, landings, balconies and access platform | - | m2 | - | - |
| 10 | Centering and shuttering including strutting, etc. and removal of form for:Columns,
Pillars, Piers, Abutments, Posts and Struts | 1 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_1466352.xls
BOQ • 0.25 MB
DOC.pdf
Tender Documents • 1.13 MB
ep.pdf
Other Document • 0.11 MB
preagreement_2026.pdf
Other Document • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].