| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC | L1 | Accepted-AOC Agreement Executed wide order No. 44/EEP/2022-2023 dated 13/02/2023 | |
| 2 | L2₹16.7 L+₹23,729 (1.44%)Rejected-AOC | L2 | Rejected-AOC Second lowest bidder .Hence rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical Third lowest bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Sixth lowest bidder | |
| 5 | Rejected-Technical VAIKOM RANNI P O 689 672 KERALA | PATHANAMTHITTA | KERALA | 689672 | - | Rejected-Technical Fifth lowest bidder |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
30 Dec 2022, 5:00 pmClosed
Executive Engineer,PWD Roads Divison,Pathanamthita
Executive Engineer,PWD Roads Divison,Pathanamthita
Reconstruction of retaining wall at ch 1100 pancharamanal of PlapallyThulapally road
2022_PWD_543204_1
PWD/RB/TR/16716/2022_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
60 days
pathanamthitta
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
11 May 2023
24 Dec 2022
3 Jan 2023
24 Dec 2022
30 Dec 2022
24 Dec 2022
Amount
Estimate
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
OD148226/2022-2023:Dry rubble Masonry using departmental rubble
OD120988/2022-2023:Dry Rubble masonry for foundation and super structure of retaining wall including all cost as per design and drawings.
OD120989/2022-2023:Engaging JCB for removal of wastage , eviction purpose etc.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>
12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20<br>
8.16:Reinforced cement concrete M-15 grade boundary pillars of standard design as per IRC:25-19767, fixed in position including finishing and lettering but excluding painting .
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
13.8:Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce.Complete as per drawing and Technical Specifications
OD195334/2022-2023:Back filling behind abutment wing wall and return wall complete as per drawing and technical specification Earth
OD195338/2022-2023:Compacting the Back filling departmental cut earth behind abutment wing wall and return wall in layers of 20 cm each, complete as per drawing and technical specification
valayanattu construction
ANISHZACHARIAH
Shishone Rajan
Ranny Taluk Labour Contract Co-operative SocityLtd
PRESIDENT PERUNAD LABOUR CONTRACT CO- OPERATIVE SOCIETY LTD NO PT.174
Bidder Name
valayanattu construction
Shishone Rajan
ANISHZACHARIAH
Ranny Taluk Labour Contract Co-operative SocityLtd
SALIM.H
PRESIDENT PERUNAD LABOUR CONTRACT CO- OPERATIVE SOCIETY LTD NO PT.174
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .