Tender Value
₹29.8 L
EMD Value
₹50,000
Closing Date
6 Oct 2026, 3:00 pm
ASSISTANT EXECUTIVE ENGINEER
CIVIL SUB DIVISION TRANSMISSION CIRCLE ALAPPUZHA KSEB VYDYUTHIBHAVNAM 688007
220kV Substation Punnapra Extension of 220Kv Control room to accommodate sub Division Office
2026_KSEB_866602_1
CSD/ALP-01/26-27
Open Tender
Civil Works - Buildings
Percentage
270 days
PUNNAPRA ALAPPUZHA
AS PER BID DOCS
6 documents required · 6 mandatory
₹5,900
₹50,000
6 Oct 2026
31 Aug 2026
9 Oct 2026
31 Aug 2026
6 Oct 2026
31 Aug 2026
31 Aug 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil(cost index(c) : 1.4445 included in Rate) | 15 | cub.m | 0.12 | ₹1.8 |
| 2 | 2.16.1 : Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m(cost index(c) : 1.4445 included in Rate) | 12 | sq.m | 0.8 | ₹9.6 |
| 3 | Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 10 | hr | 1 | ₹10 |
| 4 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete(cost index(c) : 1.4445 included in Rate) | 5 | sq.m | 0.48 | ₹2.4 |
| 5 | 5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts(cost index(c) : 1.4445 included in Rate) | 77 | sq.m | 0.36 | ₹27.71 |
| 6 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers(cost index(c) : 1.4445 included in Rate) | 104 | sq.m | 0.52 | ₹54.07 |
| 7 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform(cost index(c) : 1.4445 included in Rate) | 141 | sq.m | 1 | ₹140.99 |
| 8 | 5.9.7 : Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)(cost index(c) : 1.4445 included in Rate) | 15 | sq.m | 0.64 | ₹9.6 |
| 9 | 5.9.18 : Centering and shuttering including strutting, etc. and removal of form for:Small surfaces such as cantilever ends, brackets and ends of steps, caps and bases to pilasters and columns and the like(cost index(c) : 1.4445 included in Rate) | 2 | sq.m | 0.28 | ₹0.56 |
| 10 | 5.9.19 : Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges(cost index(c) : 1.4445 included in Rate) | 33 | sq.m | 0.56 | ₹18.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.60 MB
FORMOFTENDER.pdf
Tender Documents • 2.31 MB
DRAWING.pdf
Tender Documents • 0.15 MB
BOQ_1467691.xls
BOQ • 0.50 MB
NITPNPRASDn.pdf
Tender Documents • 0.59 MB
TENDEREXTN.pdf
PDF • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .