Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC First Lowest |
| 2 | L2₹5.6 LRejected-AOC R K PUR LITTLE ANDAMAN | ₹5.6 L | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹5.9 LRejected-AOC HUT BAY LITTLE ANDAMAN | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | ₹5.9 L | L3 | Rejected-AOC Third Lowest |
| Sl No | Description | Qty | Unit | Bharat Construction Cooperative Society Limited L2 | Goutam Sarkar L3 | Mekail Khan Streetlight & Electrical Works L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of Streetlight fitting for repair and refitting after repair | 590 | Nos | 438 ₹2,58,420 | 480 ₹2,83,200 | 390 ₹2,30,100 Lowest |
| 2.00 | Installation of New / old repaired streetlight fittings on existing pole | 15 | Nos | 388 ₹5,820 | 400 ₹6,000 | 100 ₹1,500 Lowest |
| 3.00 | Minor repair work to be attended on the spot without dismantling the fitting from the pole | 381 | Nos | 208 ₹79,248 | 230 ₹87,630 | 190 ₹72,390 Lowest |
| 4.00 | Dismantling of existing streetlight fitting | 15 | Nos | 188 ₹2,820 | 200 ₹3,000 | 1 ₹15 Lowest |
| 5.00 | Dismantling of Streetlight timer switches for repair and refitting after repair | 4 | Nos | 18 ₹72 | 510 ₹2,040 | 1 ₹4 Lowest |
| 6.00 | Installation of New Streetlight timer switches | 4 | Nos | 18 ₹72 | 380 ₹1,520 | 1 ₹4 Lowest |
| 7.00 | New installation or Replacement of defective cutouts/MCB's/Circuit breakers | 8 | Nos | 118 ₹944 | 120 ₹960 | 1 ₹8 Lowest |
| 8.00 | Resetting of timing & MCB of streetlight timer & rewinding of cutout fuse | 8 | Nos | 18 ₹144 | 120 ₹960 | 1 ₹8 Lowest |
| 9.00 | Switching ON/OFF of streetlights circuits through cutout operation | 2,920 | Nos | 32 ₹93,440 | 30 ₹87,600 | 25 ₹73,000 Lowest |
| 10.00 | Charges for engaging staff for attending upto 20 complaints per month | 12 | Months | 9,683 ₹1,16,196 | 9,570 ₹1,14,840 | 8,500 ₹1,02,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹11,983
Closing Date
20 Apr 2026, 5:00 pmClosed
Pradhan GP VK Pur
Office of the GP Vivekananda Pur
AMC for Streetlight maintenance and repair under Gram Panchayat Vivekananda Pur
2026_RDPRI_22573_1
37-1/AMC/GPVKP/LA/2025-26/290
Open Tender
AMC/ Maintenance Contracts
Works
365 days
GP Vivekananda Pur
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹11,983
Yes
13 May 2026
31 Mar 2026
21 Apr 2026
31 Mar 2026
20 Apr 2026
31 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling of Streetlight fitting for repair and refitting after repair | |||||
| 2Installation of New / old repaired streetlight fittings on existing pole | |||||
| 3Minor repair work to be attended on the spot without dismantling the fitting from the pole | |||||
| 4Dismantling of existing streetlight fitting | |||||
| 5Dismantling of Streetlight timer switches for repair and refitting after repair | |||||
| 6Installation of New Streetlight timer switches | |||||
| 7New installation or Replacement of defective cutouts/MCB's/Circuit breakers | |||||
| 8Resetting of timing & MCB of streetlight timer & rewinding of cutout fuse | |||||
| 9Switching ON/OFF of streetlights circuits through cutout operation | |||||
| 10Charges for engaging staff for attending upto 20 complaints per month | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
TecnhnicalBidGPVKP.pdf
Tender Documents • 0.26 MB
BOQ_23915.xls
BOQ • 0.27 MB
AnnexPQ.pdf
Additional Documents • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].