| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.2 L+₹17,826.63 (1.48%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹13.1 L+₹1.0 L (8.53%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹13.6 L+₹1.6 L (13.1%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹13.1 L
EMD Value
₹32,800
Closing Date
3 Jan 2020, 4:00 pmClosed
Executive Engineer Kozhikode
Office of The Executive Engineer Harbour Engineering Division Kozhikode,Puthiyanirathu, Elathur PO, Kozhikode 673 303
Special Development Fund for MLA s work for 2019 20 Construction of side protection wall to thodu at Shanthi Nagar colony in Kozhikode North Constituency
2019_HED_331022_1
HED/EE/41/2019-20e-T/s
Open Tender
Civil Works - Others
Item Rate
Westhill beach
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,975
Yes
online
₹32,800
Yes
6 Mar 2020
20 Dec 2019
8 Jan 2020
20 Dec 2019
3 Jan 2020
20 Dec 2019
20 Dec 2019 - 24 Dec 2019
Amount
Side protection wall
od4095/2019_2020 : Excavating the unhygenic deposits from the existing drain, conveying the rubbish up to average distance of 200m and depositing the rubbishing as per the direction of the Deptl. Officers and cleaning the the thodu including all labour and hygienic safety measures for keeping good health
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
ASHRAF P M
biju p v
BALAKRISHNAN P V
Bidder Name
ASHRAF P M
Abdulnazir K P
biju p v
BALAKRISHNAN P V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_460329.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .