Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹2.1 LRejected-AOC | ₹2.1 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | Kalamegam B L1 | EZHILMARAN V L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Repairs to Ceiling patchs at Unjini PUE School in Unjni Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete | 152.77 | Sqm | 43.2 ₹6,599.66 | 50 ₹7,638.50 |
| 2.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 152.77 | Sqm | 308.8 ₹47,175.38 | 315 ₹48,122.55 |
| 3.00 | White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete | 152.77 | Sqm | 39.3 ₹6,003.86 | 45 ₹6,874.65 |
| 4.00 | Provision for Name board | 1 | Nos | 1,000 ₹1,000 | 1,000 ₹1,000 |
| 5.00 | 2.Repairs to Ceiling patchs at Unjini Anganwadi building in Unjini Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete | 20.9 | Sqm | 43.2 ₹902.88 | 50 ₹1,045 |
| 6.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 20.9 | Sqm | 308.8 ₹6,453.92 | 315 ₹6,583.50 |
| 7.00 | White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete | 20.9 | Sqm | 39.3 ₹821.37 | 45 ₹940.50 |
| 8.00 | Provision for Name board | 1 | Nos | 1,000 ₹1,000 | 1,000 ₹1,000 |
| 9.00 | 3.Repairs to Ceiling patchs at South Paranam PUE School in Paranam Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete | 95.76 | Sqm | 43.2 ₹4,136.83 | 50 ₹4,788 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work | 95.76 | Sqm | 308.8 ₹29,570.69 | 315 ₹30,164.40 |
Updated dates
Tender Value
₹2.0 L
EMD Value
₹2,040
Closing Date
2 Dec 2025, 5:00 pmClosed
The Block Development Officer(BP)
Panchayat Union, Sendurai
Repairs of School and Anganwadi buildings 4 Nos in Package No.2 at Unjini and Paranam Panchayat in Sendurai Block of Ariyalur District Under PUGF 2025-26
2025_RDTN_627360_1
R.C.No.A3/3055/2025, Date.17.11.2025
Open Tender
Civil Works - Others
30 days
Sendurai
As per tender document
5 documents required · 5 mandatory
₹0
₹2,040
7 Jan 2026
28 Nov 2025
2 Dec 2025
28 Nov 2025
2 Dec 2025
28 Nov 2025
Amount
1.Repairs to Ceiling patchs at Unjini PUE School in Unjni Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete
Provision for Name board
2.Repairs to Ceiling patchs at Unjini Anganwadi building in Unjini Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete
Provision for Name board
3.Repairs to Ceiling patchs at South Paranam PUE School in Paranam Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete
Provision for Name board
4.Repairs to Ceiling patchs at North Paranam PUE School in Paranam Panchayat Chipping of concrete and roughening the surface including cost and conveyance of all materilas to site and all labour chargs etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work
White washing two coats using shell lime including cost and conveyance of all materilas to site and all labour chargs etc., complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
EZHILMARAN V (BID ID -1524296)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
PriceBid2.pdf
Tender Documents • 0.22 MB
TechnicalBid2.pdf
Tender Documents • 0.32 MB
BOQ_750063.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid