Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LRejected-Finance VILLAGE SYOHLI P O RATTI TEHSIL BALH DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | L1 | Rejected-Finance Bidder has quoted his rate thirty five percent above of tender cost | |
| 2 | L2₹28.0 L+₹2.8 L (10.9%)Rejected-Finance | L2 | Rejected-Finance Higher Amount Quoted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹18.7 L
EMD Value
₹35,500
Closing Date
3 Mar 2022, 6:00 pmClosed
DFO Sundernagar
Suket Forest Division, Sundernagar, District Mandi, HP
Construction of Foot Bridge over Pingla Khad Jangal Khad near Village Moue Gram Panchayat Pingla in Pingla Beat, Durgapur Block of Sarkaghat Forest Range under Suket Forest Division, Sundernagar during 2021-2022.
2022_FD_57246_1
Constt./Foot Bridge/Pingla/2021-2022a
Open Tender
Civil Works - Bridges
Item Rate
90 days
Pingla Beat, Durgapur Block of Sarkaghat Forest Ra
As per tender documents
9 documents required · 9 mandatory
₹500
Payable To DFO Suket, Sunderngar
₹35,500
4 Mar 2022
26 Feb 2022
4 Mar 2022
26 Feb 2022
3 Mar 2022
26 Feb 2022
26 Feb 2022 - 3 Mar 2022
Amount
Earth work in Excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches are drain (not exceeding 1.5m in width or 10 sqm. On plan) including dressing of sides and ramming of bottoms, lift upto 1.50 meters including getting out the excavated soil and disposal of surplus stacking the excavated soil as directed within a lead of 50 m. in All kind of soil 55% Ordinary rock.25% & Chiseling/wedging out of rock/ Hard rock (blasting):- i) Soil 20% of 40.33
Earth work in Excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches are drain (not exceeding 1.5m in width or 10 sqm. On plan) including dressing of sides and ramming of bottoms, lift upto 1.50 meters including getting out the excavated soil and disposal of surplus stacking the excavated soil as directed within a lead of 50 m. in All kind of soil 55% Ordinary rock.25% & Chiseling/wedging out of rock/ Hard rock (blasting):- ii) Soft rock 55% of 40.33
Earth work in Excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches are drain (not exceeding 1.5m in width or 10 sqm. On plan) including dressing of sides and ramming of bottoms, lift upto 1.50 meters including getting out the excavated soil and disposal of surplus stacking the excavated soil as directed within a lead of 50 m. in All kind of soil 55% Ordinary rock.25% & Chiseling/wedging out of rock/ Hard rock (blasting):-iii) Hard rock 25% of 40.33
Providing and laying cement concrete 1:4:8(1: cement, :4sand, :8 graded stones aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth
Square rubble masonry coursed with hard stones of approved quality in foundation and plinth i/c racking out joints in CM 1:6 (1 cement :6 Sand)
Random rubble masonry/polygonal rubble masonry (un coursed/ brought to courses) with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement :6 sand :12 graded stone aggregate 20 mm nominal size at plinth level .)
Providing from work of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 mtrs & removal of the same for insitu reinforced concrete and plain concrete work in :- a) Floors etc. upto 200 mm in thickness.
Providing and laying cement concrete work 1:2:4 (1 cement: 2 sand : 4 graded stone aggregate 20 mm. nominal size) and curing complete excluding cost of from work and reinforcement for reinforced concrete work In :- Suspended floor roofs, landing and elves and their support balconies , beams, girders, Bessemer’s and cantilever upto floor two level
Providing tor steel reinforcement for R.C.C. work i/c bending, binding and placing in position complete upto floor two level 10mm. dia steel in Bed block middle portion left & Right side
Boulder filling dry hand packed tightly as in wire crate apron bund (wire crates to be measured separately).
Fixing and providing 1:2:4 ( 1 Cement :2 Sand:4 graded stones aggregate 20 mm nominal size) leid in one layer i) 50 mm Thick
20 mm cement plaster in single coat on rough side of brick/ stone masonry for interior plastering upto floor two level including arises, internal rounded angles chambers and/ or rounded angles not exceeding 80 mm in girth and finished even and smooth. In C.M. 1:6(1 cement: 6 Sand) Parapets on both side of Bridge
Steel work bolted in built up sections, including cutting sections, including cutting hoisting , fixing in position and applying a priming coat of red led paint (A) In trussed steel bridges(Beyond 15 Mtr. But upto 30 Mtr. span) Steel work bolted in built up sections i/c cutting hoisting and fixing position (i)In trussed steel bridge Beyond 15 mtrs bent upto 30 mtrs 8 P/Cm.
In greetings, framed guards , bars ladders railings brackets and similar works In pipe railings of M.S. pipe 40mm of 3 No’s in each side For Approach
Painting two coats (excluding priming cost on new steel and other metal surfaces either enamel paint brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matters Enamel paint other than white)
Tej Singh Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .