Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹27.2 L+₹2.7 L (10.8%)Rejected-Finance | L2 | Rejected-Finance Being Not L1 | |
| 3 | L3₹30.2 L+₹5.7 L (23.0%)Rejected-Finance DOOR NO 14 6 21 5 OPP MARVAL SCHOOL BC ROAD NEW GAJUWAKA VISAKHAPATNAM 530026 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530026 | L3 | Rejected-Finance Being Not L1 |
Tender Value
₹39.4 L
EMD Value
₹78,700
Closing Date
19 May 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE(I)DM Visakhapatnam
GE(I)DM Visakhapatnam
SERVICING/MAINTENANCE/MINOR REPAIR OF 60 TR TO 120 TR CENTRAL TYPE AC PLANTS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAPATNAM
2023_MES_590705_1
8831/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Naval Dockyard, Visakhapatnam
As per tender documents
9 documents required · 9 mandatory
₹500
GE(I)DM Visakhapatnam
₹78,700
Yes
7 Jul 2023
21 Apr 2023
26 May 2023
21 Apr 2023
19 May 2023
5 May 2023
Amount
Repairs, overhauling and servicing of JS84 of make 'YORK' (semi sealed) 100 TR AC Plant compressor by stripping out both end covers, cylinder head, cylinders, connecting rod, crank shaft, oil pump, side covers, bush bearings etc. and refrigerant taking the cylinder for reuse (if available) of unserviceable worn out parts in the compressor, cleaning the system with CO2 / Nitrogen gas for leak detection for minimum 24 HRs, after flushing out the system, vacummization and charging with refrigerant gas & compressor oil and testing the unit on no load and full load conditions complete all as specified and directed. Note : - Refrigerant gas, compressor oil and spare parts shall be measured and paid seperately.
Supply only following spare parts suitable for JS84 complete all as specified and directed. Make - York
Seal 'O' ring
Bearing crank shaft
Washer Thrust
Pin piston
Sleeve cylinder
Gasket Head top Hhc
Gasket bearing head to Hsg
Gasket manifold
Gasket term block
Gasket term bolt
Plate valve suction
Valve, suction reed
Valve, discharge reed
Cage, Valve discharge
Piston
Gasket 3 1/2 cap val
Gasket cap 3
Gasket motor cover
Gasket oil pump
Rod connecting long
Spring retainer circlip
Spring helical discharge
Spring helical pin lift
Spring helical suction
Ring piston
Crankcase heater
Screen suction
Crank shaft
Oil pump
Repairs, overhauling and servicing of JS64 of make 'YORK' (semi sealed) 75 TR AC Plant compressor by stripping out both end covers, cylinder head, cylinders, connecting rod, crank shaft, oil pump, side covers, bush bearings etc. and refrigerant taking the cylinder for reuse (if available) of unserviceable worn out parts in the compressor, cleaning the system with CO2 / Nitrogen gas for leak detection for minimum 24 HRs, after flushing out the system, vacummization and charging with refrigerant gas & compressor oil and testing the unit on no load and full load conditions complete all as specified and directed. Note : - Refrigerant gas, compressor oil and spare parts shall be measured and paid seperately.
Supply only following spare parts suitable for JS64 complete all as specified and directed. Make - York
Seal 'O' ring
Bearing crank shaft
Washer Thrust
Pin piston
Sleeve cylinder
Gasket Head top Hhc
Gasket bearing head to Hsg
Gasket manifold
Gasket term block
Gasket term bolt
Plate valve suction
Valve, suction reed
Valve, discharge reed
Cage, valve dishcharge
Piston
Gasket 3 1/2 cap val
Gasket cap 3
Gasket motor cover
Gasket oil pump
Rod connecting long
Spring retainer circlip
Spring helical discharge
Spring helical pin lift
Spring helical suction
Ring piston
Crankcase heater
Screen suction
Crank shaft
Oil pump
All as per item No. 5 above, but for 75 TR York compressor.
Supply only R-22 gas. Make:-Refron 22/Floron 22/Mafron 22
Supply only R-134 A gas. Make:-Refron/Floron/Mafron
Supply only compressor oil. Make:-Servo/N-68
Supply only compressor oil. Make :- BSE -170
Material and labour for descaling the following condensers by using HCL acid with continuous circulation method using circulation pump, finally neutralizing with fresh water, opening both end covers of shell and tube condensers, cleaning of copper tubes manually by using nylon brushes, re-fixing the end covers with new neoprene rubber gaskets, commissioning after complete performance test of the system all as specified and directed.
120 TR capacity
100 TR capacity
60 - 80 TR capacity
Material and labour for checking the complete refrigeration system of the AC plant, leak testing with CO2 gas under constant pressure of 250 PSI after complete transfer of refrigerant gas from the entire system, rectification of leakages including cutting and brazing the refrigeration pipes wherever required, replacement of "O" rings, teflon washers of valves, copper tubing, flare nuts etc., neutralizing after the pressure hold good for at least 24 hours vacuumization of system, testing and commissioning of following air conditioning plants:
60 - 80 TR capacity
100 / 120 TR capacity
Supply and fix shaft seal for 120 TR AC plant, taking out refrigerant resue (if available) and taking out old unserviceable shaft seal in the compressor, cleaning the system with CO2/Nitrogen as for leak detection for minimum 24 hrs, after flushing out the system, vacuumization and charging with refrigerant gas complete all as specified and directed. Make - Kirloskar Note : Refrigerant gas shall be measured and paid separately
Supply and fix shaft seal for 60 TR AC plant, taking out refrigerant resue (if available) and taking out old unserviceable shaft seal in the compressor, cleaning the system with CO2/Nitrogen as for leak detection for minimum 24 hrs, after flushing out the system, vacuumization and charging with refrigerant gas complete all as specified and directed. Make - Carrier, Model - 5H 60 Note : Refrigerant gas shall be measured and paid separately
Material and labour for preparation of surfaces by scrapping and removing rusted portion with wire brush and applying one coat of synthetic enamel paint for complete refrigeration system, in-let/out-let pipe lines, compressor unit, condenser pump set, control LT panel board duct covers, cooling tower stand including lettering & numbering and applying one coat of white/colour wash to chiller pipe line all as specified and directed
Material and labour for complete checking, servicing/ rectification of electrical circuits for all units and control wiring showing phase sequence with proper lugging of AC plant control panel including replacement of fused indication lamps with new ones, cleaning of all power contacts, rectification of minor defects in Ammeters and Voltmeters, testing and commissioning all as specified and directed. Note :- Material such as indication lamp, ammeter, voltmeter shall be measured and paid separately.
Supply and fix in repairs pilot solenoid valve to the refrigerant system, reconnecting the refrigeration piping including ,leak testing, brazing to the pipe line, necessary copper tubing etc., wherever required all as directed Make :- Sporlon/Donfos
All as per item No. 17 above, but 110V
Supply and fix followign pressure gauge for suction/discharge refrigerant lines and water lines of square/round type 2"/4" dial for the following ranges for Package/Central type AC plants including taking down old unserviceable pressure gauge complete all as specified directed Make -Air Master/Febig/Scientific
0-150 PSI for refrigerant line
0-300 PSI for refrigerant line
0-12 Kg./cm2 for water line
Material and labour for taking out the defective pressure cut-outs of any range and model and supply & fix followng new pressure cut-outs, connecting the pressure lines/control wiring, leak testing and commissioning all as specified and directed Make:-Indofoss/Danfoss/Ranco
HP/LP pressure cut-out MP-15
Water pressure cut-out IPS-70
Oil pressure cut-out MP-55
S&F for VVE-70 model expansion valve of Sporlon make with necessary modification, brazing, lead testing and commissioning including taking out old unsv expansion valve complete all as specified and directed.
All as per item No.21.00 above but for VVE- 52
Material and labour for monthly cleaning of entire indoor substation buildings inside wall, ceiling, floor and outside wall, plinth protection with suitable brush/broom/wiper, removing wild vegitation around substation building complete all as sjpecified and directed.
Repairs, overhauling and servicing of 5H120 of make 'Carrier' 120 TR AC Plant compressor by stripping out both end covers, cylinder head, cylinders, connecting rod, crank shaft, oil pump, side covers, bush bearings etc. and refrigerant taking the cylinder for reuse (if available) of unserviceable worn out parts in the compressor, cleaning the system with CO2 / Nitrogen gas for leak detection for minimum 24 HRs, after flushing out the system, vacummization and charging with refrigerant gas & compressor oil and testing the unit on no load and full load conditions complete all as specified and directed. Note : - Refrigerant gas, compressor oil and spare parts will be measured and paid seperately.
Supply only following spare parts suitable for 5H120 complete all as specified and directed. Make - Carrier
Set of neopron 'O' ring
Connecting rod bearing
Main bearing
Seal end bearing
Piston pin
Piston
Valve plate
Suction reed
Discharge reed
Unloader sleeve
Suction valve springs
Discharge valve springs
Thrust washer
Shaft seal assembly
Oil pressure regulating valve
Piston ring set
Oil ring set
Connecting rod
Discharge valve assembly
Valve lifter pin
Gasket set
Cylinder liner
Valve lifter spring
Piston pin bushing
Crank shaft
Oil filter
Oil pump
Centre bearing
Connecting rod bolt and nuts
Safety valve
Material and labour for replacement of Teflon/Nylon seatings in suction, discharge and service valves including pumping down and recharging the refrigerant gas after completion of replacement of seatings and neutralizing after the pressure hold, good for at least 24 hours vacuumization of system, testing and commissioning of air conditioning plants complete all as specified and directed. Note : - (i) Refrigerant gas shall be measured and paid for separately as supply only (ii) Pressure testing and transportaion of valves to the workshop outside Dockyard is inclusive in the job.
Repairs, overhauling and servicing of CSH7593-90Y-40P of make 'Voltas' 80 TR AC Plant compressor (Make-Betzer) by stripping out screws, bush bearings, 'O' Ring sets, gasket sets and oil filters etc. and refrigerant taking out in the cylinder for reuse (if available) of unserviceable worn out parts in the compressor, cleaning the system with CO2 / Nitrogen gas for leak detection for minimum 24 HRs, after flushing out the system, vacummization and charging with refrigerant gas & compressor oil and testing the unit on no load and full load conditions complete all as specified and directed. Note : - Refrigerant gas, compressor oil and spare parts will be measured and paid seperately.
Supply only following spare parts suitable for CSH7593-90Y-40P of make 'Voltas' all as specified and directed.
Electronic expansion valve
Leaving water temperature censor
Leaving water temperature censor
Chiller Temperature coil
Pilot solenoid valve
Safety valve
Ball bearings
O' ring set
Gasket set
Oil filters
SRI SIDDHI VINAYAKA ENTERPRISES
REAL ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .