Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAccepted-AOC VILL NANGABAG P O BANDROL TEHSIL DISTRICT KULLU H P | SHIMLA | HIMACHAL PRADESH | 172001 | ₹6.0 Cr | L1 | Accepted-AOC awarded |
| 2 | L2₹6.0 CrRejected-Finance NOT AVAILABLE | ₹6.0 Cr | L2 | Rejected-Finance due to high rates |
| 3 | L3₹6.1 CrRejected-Finance | ₹6.1 Cr | L3 | Rejected-Finance due to high rates |
| 4 | Rejected-Technical HIMACHAL PRADESH HP | CHAMBA | HIMACHAL PRADESH | 176315 | - | - | Rejected-Technical bid withdrawn |
| 5 | Rejected-Technical AT GROUND FLOOR MAIN BAZAAR MEHRE TEHSIL BARSAR DISTT HAMIRPUR H P PIN CODE 174305 | HAMIRPUR | HIMACHAL PRADESH | 174305 | - | - | Rejected-Technical Non responsive |
Tender Value
₹5.8 Cr
EMD Value
₹5 L
Closing Date
1 Apr 2026, 6:00 pmClosed
EE HPSAMB
EE HPSAMB
C/o new Market Yard at Mohal, Tanda Khali (Kangra) Distt. Kangra, H.P. SH C/o civil work, WS and SI, electrical installation work thereof.
2026_HPAMB_132476_1
HMB-EC-11/92-Vol-XI
Open Tender
Civil Works
300 days
Kangra
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹5 L
8 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
1 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth upto all leads and lifts as directed by Engineer-incharge and disposing of all excavated earth at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | |||||
| 2Filling in plinth with sand under floors including watering, ramming consolidating and dressing complete as per HPPWD specification or as directed by Engineer-in-Charge, including carriage of materials with in all leads, lifts and other incidental. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | |||||
| 3Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights. below supporting floor to ceiling and removal of the same for in – situ reinforced concrete and plain concrete work in foundation footings, basis of columns etcetera and mass concrete, including carriage of materials. Within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | |||||
| 4Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights. below supporting floor to ceiling and removal of the same for in – situ reinforced concrete and plain concrete work walls ( any thickness) including attached pilasteres,buttresses, plinth and string cources fillets, kerbs and steps etc.within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | |||||
| 5Providing form work with steel plates 3.15mm (Three decimal one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, heights of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits of suspended floors, roofs, landings, shelves, and the like floor, etc. up to any thickness, up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | |||||
| 6Providing form work with steel plates 3.15mm (Three point one five millimeters)thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in beams cantilevers, girders and lintels, sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels upto any depth/heights, up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | |||||
| 7Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering, strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in Columns, pillars, posts and struts, (circular or curved in plan), up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | |||||
| 8Providing from work with steel plates 3.15mm (Three decimal one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering, strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in stairs cases with slopping or stepped soffits, excluding, landing, up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, GST, Octroi, Toll Tax Sales tax or any other taxes imposed by the Government. | |||||
| 9Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) and curing complete, in or under water, including pumping or bailing out water/dewatering, removal of slush which may arise at the time of laying under water complete excluding the cost of form work in foundation and plinth in all depths/heights as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | |||||
| 10Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately) all works upto plinth level complete as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals.The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | |||||
stage.html
html • 0.05 MB
technical_195896.pdf
techsummary_195896.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_195896.xls
BOQ • 0.56 MB
SBD_1_Mohal.pdf
Tender Documents • 7.08 MB
Download all tender documents and submit your bid