Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.8 Cr
EMD Value
₹3.8 L
Closing Date
7 Dec 2026, 5:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
ACE,RRIC,Choudwar
Office of Rengali Right Irrigation Circle, Choudwar, Katak
Service Road
2026_CEBMD_146793_2
ACERRICC-02/2026-27
Open Tender
Civil Works - Roads
Percentage
Dhenkanal
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹3.8 L
Yes
23 Nov 2026
23 Nov 2026
8 Dec 2026
23 Nov 2026
7 Dec 2026
23 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungle and removal of rubbish up to a distance of 50 metres outside the periphery of the area including cost, carriage, labour & all other taxes of all materials with T & P etc. complete as per the direction of the Engineer-in-charge. | 1,20,848 | Sqm | 0.27 | ₹32,628.96 |
| 2 | Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. etc complete as directded by the Engineer-In-Charge. | 68,906 | Sqm | 35.9 | ₹24,73,725.4 |
| 3 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 1 Km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. cost, carriage, labour, royalty,DMF,EMF,Additional charges ,cess & all other charges complete as per the direction of Engineer-in-charge. (measurment of the fill to be taken on the finished compacted section under OMC condition.) | 15,412 | Cum | 193.9 | ₹29,88,386.8 |
| 4 | Watering earthwork upto OMC condition and compaction by vibrtory rollers and dozer in layers not exceeding 22.5cm to 95% dry density including hire and running charges of all the machineries complete as per direction of the Engineer-in-charge. (Measurement to be taken on the finished compacted section of the fill under OMC condition). | 3,302 | Sqm | 33.6 | ₹1,10,947.2 |
| 5 | Supplying & spreading of coarse sand & moorum admixture (1:2) on finished surface on slopes & bed of canal as filter material including labour chargees for admixing including cost, carriage, labour, royality ,DMF,EMF,Additional charges , cess and all other taxes of all materials with T & P etc complete as per direction of Engineer-in-Charge. | 772 | Cum | 1,364.7 | ₹10,53,548.4 |
| 6 | Providing, laying, spreading, compacting stone aggregate to water bound macadam of Grading-II ( 45mm to 63mm) including spreading in uniform thickness , hand packing , rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber , applying and broomiming moorum or gravel as binding material to fill up the interstices of coarse aggregate , watering and compacting to the required density as per Clause 404 of MoSRT&H Specifications for Road and Bridge works (4th Revision) including cost, carriage, labour, royalty,DMF,EMF,Additional charges , cess & all other taxes of all materials with T & P etc. complete as per the direction of the Engineer-in-charge. | 3,185 | Cum | 3,440.9 | ₹1,09,59,266.5 |
| 7 | Providing, laying, spreading, compacting stone aggregate to water bound macadam of Grading-III (53 mm to 22.40 mm) including spreading in uniform thickness , hand packing , rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber , applying and broomiming moorum or gravel as binding material to fill up the interstices of coarse aggregate , watering and compacting to the required density as per Clause 404 of MoSRT&H Specifications for Road and Bridge works (4th Revision) including cost, carriage, labour, royalty,DMF,EMF,Additional charges , cess & all other taxes of all materials with T & P etc. complete as per the direction of the Engineer-in-charge. | 3,185 | Cum | 3,528.4 | ₹1,12,37,954 |
| 8 | Collecting, supplying, and Laying moorum in sub-base in layers not exceeding 100 mm watering and compacting with PRR including cost, carriage, labour, royalty,DMF,EMF ,Additional charges , cess and other taxes with T & P etc. complete as per the direction of Engineer-in-charge. | 7,546 | Cum | 1,086.4 | ₹81,97,974.4 |
| 9 | Fine Dressing and turfing of slopes of canal bank with dub shods with a lead of 5Km. Inlcuding cost, carriage, labour, cess & all other taxes of all materials etc. complete as per the direction of Engineer-in-charge. | 36,123 | Cum | 33 | ₹11,92,059 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
cover-Iserviceroad.pdf
Tender Documents • 2.36 MB
BOQ_622365.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .