Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 00 MAA KALI ENTERPRISE NEW ROAD KULTI BARDHAMAN WEST BENGAL 713343 | PASCHIM BARDHAMAN | WEST BENGAL | 713343 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹6.8 L
EMD Value
₹13,567
Closing Date
22 Aug 2026, 10:00 amClosed
Executive Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Day to day Operation and Maintenance of Pump Motor Set along with electrical maintenance at 4th. Battalion PHE Campus, Kolkata Armed Police, Salt Lake City, PHE at HC Block, Sector III, Salt lake etc under Kolkata Police for FY 2026-2027. (1st Call)
2026_WBPHI_5018535_7
WBPHIDCL/EE-(HQ-I)/NIT- 27(e)/2026-2027
Open Tender
ELECTRICAL WORKS M/R
Percentage
Refer to NIT
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹13,567
Yes
24 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
22 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Electrical (maintenance works)
Note : All the items of SOR of PWD Electrical works w.e.f 01.11.2017 including upto date addenda and corrigenda and the approved non schedule item of works (Including 18% GST & 1% labour cess)
( The work shall continue of the entire contract period as per the requirement & as directed by the Engineer in charge . The payment of the executed work shall be made on the basis of - (A) PWD schedule of rates (B) As per the ANNEXURE - 2023/2 for non-schedule items (C) List of rates proposed by PWD (Sub Committee) on 27/02/2026 for different electrical works.) | - | LOT | 1,60,000 | - |
| 2 | Day to day Repairing and Maintenance of electrical fittings and accessories as and when required and Operation of pump- motor sets - Supply of manpower for Repairing and Maintenance of electrical fittings and accessories as and when required and operation of pump-motor sets and controlling valves in water supply line to provide uniterrupted water supply with minor maintenance,if required for 274 days as per direction of EIC.
Shift Duration:-
I) 06:00 AM to 02:00 PM ;02:00 PM to 10:00 PM (One Number of Skilled Electrician cum Pump Operator per shift for 4th. Battalion PHE) is to be provided by the agency (minimum tools and tackles should be provided by the agency)
Electrician cum Pump Operators (Skilled)
=(2x274x1 )** { Shift x Days x Man Power}
II) 09:00A.M to 05:00 P.M (One Number of Skilled Electrician cum Pump Operators per shift for other location) is to be provided by the agency (minimum tools and tackles should be provided by the agency)
Electrician cum Pump Operators (Skilled)
=(1x274x1 )** { Shift x Days x Man Power}
Total Quantity = 822.
(RATES ARE INCLUSIVE 10% AGENCY PROFIT, 18% GST & 1% LABOUR CESS)
N.B. :- Submission of "License to Electrical Contrators" By the Bidder is mandatory. | - | PerShiftperElectriciancumPumpOperator | 630.58 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.92 MB
BOQ_5089652.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .