Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC FIRST LOWEST |
| 2 | L2₹1.1 CrRejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹1.1 Cr | L2 | Rejected-Finance SECOND LOWEST |
| 3 | L3₹1.1 CrRejected-Finance 7 8 WEST PRATAP NAGAR MAHOLI ROAD MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹1.1 Cr | L3 | Rejected-Finance THIRD LOWEST |
| 4 | L4₹1.2 CrRejected-Finance | ₹1.2 Cr | L4 | Rejected-Finance FOURTH LOWEST |
| Sl No | Description | Qty | Unit | M/S SHIVA ENGG AND CONTRACTOR L3 | JAI LAXMI CONTRACTOR L1 | S F INFRA PROJECTS L2 | VIJAY ASSOCIATES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in embankment by power transported earth with a lead beyond 200m and upto 1.00 km. i/c excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty. | 218 | Cum | 155 ₹33,790 | 180 ₹39,240 | 50 ₹10,900 | 100 ₹21,800 |
| 2.00 | Removal of Bund and diversion after complition of Work | 26 | Cum | 60 ₹1,560 | 63 ₹1,638 | 50 ₹1,300 | 50 ₹1,300 |
| 3.00 | Earth work in foundation in dry ordinary soil i/c lift upto 1.50m & lead upto 30m and including back filling with removal and disposal of surplus earth as directed by Engineer-in Charge upto a distance of 30M from the foundation trenches | 122 | Cum | 82 ₹10,004 | 100 ₹12,200 | 50 ₹6,100 | 50 ₹6,100 |
| 4.00 | Cement Concrete 1:3:6 (Cement, coarse sand and stone grit 20-40mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction | 19 | Cum | 5,000 ₹95,000 | 5,000 ₹95,000 | 4,000 ₹76,000 | 5,000 ₹95,000 |
| 5.00 | Reinforced Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete but excluding cost of steel and its binding with mechanical mixing and compaction. | 71 | Cum | 6,700 ₹4,75,700 | 6,000 ₹4,26,000 | 6,000 ₹4,26,000 | 6,000 ₹4,26,000 |
| 6.00 | Cement Concrete 1:2:4 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction. | 54 | Cum | 5,500 ₹2,97,000 | 6,000 ₹3,24,000 | 5,500 ₹2,97,000 | 6,000 ₹3,24,000 |
| 7.00 | Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing. | 2 | Cum | 5,994 ₹11,988 | 6,500 ₹13,000 | 6,000 ₹12,000 | 7,348 ₹14,696 |
| 8.00 | Providing and placing steel shuttering for C.C. Work including cost of centering and shuttering upto 3.0m hight. | 55 | Sqm. | 500 ₹27,500 | 575 ₹31,625 | 300 ₹16,500 | 575 ₹31,625 |
| 9.00 | Providing and placing steel shuttering for R.C.C. Work including cost of centering and shuttering upto 3.0m hight. | 200 | Sqm. | 650 ₹1,30,000 | 650 ₹1,30,000 | 300 ₹60,000 | 575 ₹1,15,000 |
| 10.00 | Providing and laying Reinforcement for R.C.C. Work i/c cutting, binding and placing in position i/c cost of all material such as steel, binding wire etc., labour T&P etc. complete as per drawing. | 3.86 | MT. | 60,900 ₹2,35,074 | 66,000 ₹2,54,760 | 70,000 ₹2,70,200 | 70,000 ₹2,70,200 |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
11 Jun 2025, 1:00 pmClosed
SE IWC MATHURA
SE IWC MATHURA
Construction of Box Culvert at Km 5.798 of Jattari Minor and Construction work of Khandja from Km 7.500 to Km 14.540
2025_UPIDC_1045821_3
01/SE/2025-26
Open Tender
Civil Works
60 days
KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,654
₹2.6 L
MATHURA
28 Jan 2026
5 Jun 2025
11 Jun 2025
5 Jun 2025
11 Jun 2025
5 Jun 2025
5 Jun 2025
Amount
Earth work in embankment by power transported earth with a lead beyond 200m and upto 1.00 km. i/c excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty.
Removal of Bund and diversion after complition of Work
Earth work in foundation in dry ordinary soil i/c lift upto 1.50m & lead upto 30m and including back filling with removal and disposal of surplus earth as directed by Engineer-in Charge upto a distance of 30M from the foundation trenches
Cement Concrete 1:3:6 (Cement, coarse sand and stone grit 20-40mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction
Reinforced Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete but excluding cost of steel and its binding with mechanical mixing and compaction.
Cement Concrete 1:2:4 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction.
Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing.
Providing and placing steel shuttering for C.C. Work including cost of centering and shuttering upto 3.0m hight.
Providing and placing steel shuttering for R.C.C. Work including cost of centering and shuttering upto 3.0m hight.
Providing and laying Reinforcement for R.C.C. Work i/c cutting, binding and placing in position i/c cost of all material such as steel, binding wire etc., labour T&P etc. complete as per drawing.
Supply and fixing joint filler board in joint between expansion Joints.
Supplying and fixing 75mm dia PVC Pipe (Kisan/Supreme) i/c cost of all material, labour, and T&P etc. complete.
Supply and fixing Sign Board and writing on it i/c cost of all material, labour T&P etc. complete.
Finishing wall two or more coat with Acrylic smooth exterior paint (Apex) of required shade i/c priming coat of exterior primer.
Earth work in cutting or in embankment in ordinary soil, excavation to be in regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers i/c ramming, dressing the surface to required levels and slopes and also i/c 1.50m lift and 60m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m.
Dry brick on edge pitching in sand including prepairing of sub grade and filling joints with local sand i/c cost of all material, labour T&P etc complete.
S F INFRA PROJECTS (BID ID -5244451)
M/S SHIVA ENGG AND CONTRACTOR (BID ID -5245238)
VIJAY ASSOCIATES (BID ID -5243489)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid