Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹1.4 L−₹14,964.80 (9.59%)Accepted-AOC HPSEBL THALOUT | H3 | Accepted-AOC Lowest One | |
| 2 | H1₹1.6 LRejected-AOC VILL FAGOG P O BALOH TEHSIL JHANDUTTA DISTT BILASPUR HP | H1 | Rejected-AOC Not Lowest One | |
| 3 | H2₹1.5 L−₹2,470.70 (1.58%)Rejected-AOC VILLAGE GUHAR MAJHWAR P O UPPER BHAMBLA TEHSIL BALDWARA DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | H2 | Rejected-AOC Not Lowest One |
| Sl No | Description | Qty | Unit | Naresh Kumar H3 | Jai Singh Contractor and Suppliers H2 | Kashmir Singh H1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfaction of Engineer-in-Charge upto all lead and lifts. | 5.01 | Cum | 350 ₹1,753.5 Lowest | 410 ₹2,054.1 | 430 ₹2,154.3 |
| 2.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling upto all height and removal of the same for insitu-reinforced concrete and plain concrete work in :- | ||||||
| 2.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 32.05 | Sqm | 380 ₹12,179 Lowest | 440 ₹14,102 | 450 ₹14,422.5 |
| 3.00 | Providing and laying cement concrete work 1:5:10( 1 cement :5 sand :10 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 20.5 | Cum | 6,199 ₹1,27,079.5 Lowest | 6,700 ₹1,37,350 | 6,800 ₹1,39,400 |
Tender Value
Refer Docs
EMD Value
₹2,860
Closing Date
10 Jul 2025, 5:00 pmClosed
Executive Engineer JS Division Sarkaghat
Executive Engineer JS Division Sarkaghat
C O Breast Retaining wall to protect the Near Pump House Batail
2025_HPIPH_109105_1
2550-2600 dt. 01.07.2025
Open Tender
Civil Works
Item Rate
90 days
Sarkaghat
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Engineer JS Division Sarkaghat
₹2,860
11 Nov 2025
1 Jul 2025
11 Jul 2025
1 Jul 2025
10 Jul 2025
1 Jul 2025
Amount
Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfaction of Engineer-in-Charge upto all lead and lifts.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling upto all height and removal of the same for insitu-reinforced concrete and plain concrete work in :-
Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Providing and laying cement concrete work 1:5:10( 1 cement :5 sand :10 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth.
Jai Singh Contractor and Suppliers (BID ID -532896)
Naresh Kumar (BID ID -532882)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .