| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.3 LAccepted-Finance VILL KUNDANPUR NO 5 GADARPUR UDHAM SINGH NAGAR | L1 | Accepted-Finance ok | |
| 2 | L2₹74.6 L+₹7.3 L (10.9%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹80.0 L+₹12.7 L (18.9%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹80.2 L+₹12.9 L (19.2%)Accepted-Finance | L4 | Accepted-Finance ok | |
| 5 | L5₹86.6 L+₹19.3 L (28.7%)Accepted-Finance | L5 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | M/s Shree Ram Construction L7 | M/S ABHISHEK JAIN CONTRACTOR L6 | M/S AMIT NARANG CONTRACTOR L1 | RAJPAL SINGH CONTRACTOR L2 | KESHAV PANERU CONTRACTOR L4 | M/s PARVEJ KHAN L3 | M/s Kuldeep Singh Contractor, Gadarpur L8 | M/s Vikrant Singh Contractor Gadarpur L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation in ordinary soil including lift upto 1.50 and upto 30m and including refilling watering ramming excavated earth into trenches and removal and disposal of surplus earth as directed by Engineer-in- charge | 918.63 | Cum | 287 ₹2,63,646.81 | 273.51 ₹2,51,254.49 | 138 ₹1,26,770.94 | 100 ₹91,863 Lowest | 125 ₹1,14,828.75 | 200 ₹1,83,726 | 293 ₹2,69,158.59 | 265.22 ₹2,43,639.05 |
| 2.00 | Plain Cement Concrete M-10(1:3:6 normal mix) in levelling course below open foundation with cement, course sand and 4 cm gauge approved ballast in proportion of 1:3:6 including supply of all materials labour T&P etc required for proper completion of work. | 472.08 | Cum | 4,462 ₹21,06,420.96 | 4,251 ₹20,06,812.08 | 2,138 ₹10,09,307.04 Lowest | 3,500 ₹16,52,280 | 3,750 ₹17,70,300 | 4,000 ₹18,88,320 | 4,548 ₹21,47,019.84 | 4,120.76 ₹19,45,328.38 |
| 3.00 | Brick masonry in 1:4 cement sand mortar in foundation upto plinth including supply of all materials labour T&P etc required for proper completion of work. | 1,192.72 | Cum | 4,718 ₹56,27,252.96 | 4,495 ₹53,61,276.4 | 4,135 ₹49,31,897.2 | 4,100 ₹48,90,152 Lowest | 4,600 ₹54,86,512 | 4,200 ₹50,09,424 | 4,810 ₹57,36,983.2 | 4,357.3 ₹51,97,038.86 |
| 4.00 | Providing P.C.C. Grade M-20 Normal Mix(1:2:4) Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Cllause 802,803,1202&1203. | 8.17 | Cum | 4,949 ₹40,433.33 | 4,715 ₹38,521.55 | 2,371 ₹19,371.07 Lowest | 4,000 ₹32,680 | 5,500 ₹44,935 | 4,720 ₹38,562.4 | 5,045 ₹41,217.65 | 4,570.64 ₹37,342.13 |
| 5.00 | Plain/reinforced cement concrete RCC Grade M25 in substructure complete as per drawings and technical specification Clauses 802,804,805,806,807,1202 &1204. | 6.35 | Cum | 6,011 ₹38,169.85 | 5,725 ₹36,353.75 | 2,880 ₹18,288 Lowest | 4,000 ₹25,400 | 6,800 ₹43,180 | 5,759 ₹36,569.65 | 6,127 ₹38,906.45 | 5,550.81 ₹35,247.64 |
| 6.00 | Supplying fitting and placing TMT bar reinforcement (fe 415) in substructure complete as per drawings and technical specification Clauses 1002,1005,1010&1202 (The reinforcement steel sheel be procured from original(primary) steel producers as per clause no-2011.3.1 of MORD specifications (First revision 2014) and IS 1786:2008 clause no-1.6 | 0.75 | MT | 68,292 ₹51,219 | 65,040 ₹48,780 | 32,719 ₹24,539.25 Lowest | 65,000 ₹48,750 | 75,000 ₹56,250 | 65,436 ₹49,077 | 70,000 ₹52,500 | 63,064.71 ₹47,298.53 |
| 7.00 | Cement pointing in 1:3 Cement sand mortar in brick work including supply of all materials labour T&P etc required for proper completion of work. | 3,695.61 | Sqm | 58.69 ₹2,16,895.35 | 56 ₹2,06,954.16 | 28 ₹1,03,477.08 Lowest | 49 ₹1,81,084.89 | 45 ₹1,66,302.45 | 56 ₹2,06,954.16 | 60 ₹2,21,736.6 | 54.2 ₹2,00,302.06 |
| 8.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m,transporting to site, spreading,grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 2,647.41 | Cum | 380 ₹10,06,015.8 | 371 ₹9,82,189.11 | 186 ₹4,92,418.26 | 200 ₹5,29,482 | 125 ₹3,30,926.25 Lowest | 220 ₹5,82,430.2 | 397 ₹10,51,021.77 | 359.13 ₹9,50,764.35 |
| 9.00 | Cement Concrete Pipe NP3 (Buried Conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection work, backfilling, concrete and masonry work in head wall and parapets. | 7 | N0 | 1,150 ₹8,050 | 1,100 ₹7,700 | 551 ₹3,857 Lowest | 1,378.6 ₹9,650.2 | 1,300 ₹9,100 | 1,102 ₹7,714 | 1,173 ₹8,211 | 1,062.9 ₹7,440.3 |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
9 Mar 2026, 5:00 pmClosed
Executive Engineer, Irrigation Division Rudrapur
office of Executive Engineer, Irrigation Division Rudrapur
Under NABARD, lining of Sirsa Canal in Rudrapur Block, Udham Singh Nagar District. Reach - between 0.100 and 1.900 km.
2026_IRDCE_92309_1
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
365 days
Kichha
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer, Irrigation Division Rudrapur
₹2.7 L
12 Mar 2026
23 Feb 2026
10 Mar 2026
23 Feb 2026
9 Mar 2026
28 Feb 2026
Excavation in foundation in ordinary soil including lift upto 1.50 and upto 30m and including refilling watering ramming excavated earth into trenches and removal and disposal of surplus earth as directed by Engineer-in- charge
Plain Cement Concrete M-10(1:3:6 normal mix) in levelling course below open foundation with cement, course sand and 4 cm gauge approved ballast in proportion of 1:3:6 including supply of all materials labour T&P etc required for proper completion of work.
Brick masonry in 1:4 cement sand mortar in foundation upto plinth including supply of all materials labour T&P etc required for proper completion of work.
Providing P.C.C. Grade M-20 Normal Mix(1:2:4) Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Cllause 802,803,1202&1203.
Plain/reinforced cement concrete RCC Grade M25 in substructure complete as per drawings and technical specification Clauses 802,804,805,806,807,1202 &1204.
Supplying fitting and placing TMT bar reinforcement (fe 415) in substructure complete as per drawings and technical specification Clauses 1002,1005,1010&1202 (The reinforcement steel sheel be procured from original(primary) steel producers as per clause no-2011.3.1 of MORD specifications (First revision 2014) and IS 1786:2008 clause no-1.6
Cement pointing in 1:3 Cement sand mortar in brick work including supply of all materials labour T&P etc required for proper completion of work.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m,transporting to site, spreading,grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Cement Concrete Pipe NP3 (Buried Conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection work, backfilling, concrete and masonry work in head wall and parapets.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_109280.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.48 MB
BOQ_109280.xls
BOQ • 0.32 MB
corrigendum2.pdf
PDF • 0.33 MB
corrigendum.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .