| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | L1 | Accepted-AOC WORK ORDER ISSUED | |
| 2 | L2₹4.5 L+₹16,072 (3.68%)Rejected-Finance 49 1 ISWAR GUPTA ROAD KOLKATA 700 028 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | L2 | Rejected-Finance NOT L1 BIDDER | |
| 3 | L3₹4.9 L+₹52,559 (12.0%)Rejected-Finance 2 NO SIDDHESWARI LANE KANCHRAPARA 24 PARGANAS N WEST BENGAL 743145 | KANCHRAPARA | NORTH 24 PARGANAS | WEST BENGAL | 743145 | L3 | Rejected-Finance NOT L1 BIDDER | |
| 4 | L4₹4.9 L+₹56,244 (12.9%)Rejected-Finance | L4 | Rejected-Finance NOT L1 BIDDER |
Tender Value
₹4.4 L
EMD Value
₹8,714
Closing Date
31 Jan 2024, 3:00 pmClosed
Assistant Engineer
O/o The Assistant Engineer Kalyani Electrical Sub-Division, P.W.D. P.O.-Kalyani, Dist- Nadia
Annual Maintenance of Electrical Installation of Haringhata Dairy, Nadia for the year 2023-24 -- Repairing and Servicing of 250 KVA 3 Nos. and 500 KVA 2 Nos. Oil type Transformer
2024_WBPWD_647369_1
WBPWD/AE/e-NIT- 39/KLY of 2023-24
Open Tender
ELECTRICAL WORKS ORG
Item Rate
10 days
Haringhata
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,714
Yes
O/o The Assistant Engineer Kalyani Electrical Sub-
25 Apr 2025
16 Jan 2024
2 Feb 2024
16 Jan 2024
31 Jan 2024
24 Jan 2024
22 Jan 2024
Amount
Charge for inspection of 250/500 kVA transformer to identify and rectify various defects within it to perform satisfactorily as per direction of EIC.
Dismantling of HT & LT Cable end termination by skilled workmen using special type tools & tackles as per direction of EIC.
Drain out the transformer oil for lifting the core and core assembly and pouring it in empty clean drams.
Dismantling the top cover of transformer after draining the damaged transformer oil and Supply & Fixing the 6 mm thick gasket for top cover with necessary quantity of hold rite dendrite etc. per direction of EIC.
250 KVA Transformer
500 KVA transformer
Charges for lifting the core and core winding assembly of the transformer from the transformer oil tank after dismantling the tap changing switches by special loader, steel tripod stands, chain pulley, steel ropes, steel clamps with sufficient trained technical persons including hire charges of above mentions tools & tackles and kept the core and core assembly on proper tray on the repair bench.
250 KVA Transformer
500 KVA transformer
Charge for servicing of transformer by hot jet wash after opening 4 sets of LT bushing and stud rods properly, cleaning the cores by soft brush and soft clothes after drying the cores & winding should be cleaned by Carbon tetrachloride solution properly for de-moisturize and raise the I.R. value & changing 4 Sets O-ring at radiator to stop leakage as per direction of EIC.
250 KVA Transformer
500 KVA transformer
S & Instn. of Bushing at HV & LV Side of Transformer in replacement of damaged one as per direction of EIC.
250 KVA Transformer
500 KVA transformer
S & Replacing Transformer oil seal as per direction of EIC.
250 KVA Transformer
500 KVA transformer
Charge for cleaning sulphur from Bus bar at both LV & HV Side of Transformer after dismantling from transformer & reinstalling the same after servicing as per direction of EIC.
250 KVA Transformer
500 KVA transformer
Reinstallation of transformer after washing & cleaning the tank by transformer oil and dried the total surface by cotton cloth and inserting the core in oil tank with proper care, by special loader , steel tripod stands , chain pulley , steel ropes , steel clamps with sufficient trained technical persons & tightening of all joints, megger testing of winding etc. as per direction of EIC.
250 KVA Transformer
500 KVA transformer
BDV Test of Transformer Oil before Filtration and Dehydration from reputed concern as per direction of EIC.
Silica Gel Replacement of Transformer Breather as per direction of EIC
S & F nut bolt (HSS) as per direction of EIC
S&F nut with double washer (Brass) as per direction of EIC
Supply & pouring New Transformer Oil confirming with IS Specification for the following as per direction of EIC
Dehydration & filtration of transformer oil for improvement of dielectric strength.
Testing of dehydrated & improved di-electric strength of transformer oil after and before filtration and de-hydration.
Carrying charge of Transformer Oil, Filter Machine, Testing Equipment etc. UP & DN
Hiring Charge of welding machine with skill welder /manpower including cost of welding filling rod etc.
Hiring Charge 5 KVA 50 Hz Diesel driven generator set with both ways transportation, installation & dismantling cost of DG set incl. Diesel, operator and connecting cable as reqd. as per direction of EIC.
Electromech Engineers Co-Operative Society Ltd.
SUNLIGHT CONSTRUCTION
UNICON
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .