Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.7 LAccepted-AOC AT JAYAPADA P O CHYAPURI P S SURYABADI DIST PURI PIN 752014 | PURI | PURI | ODISHA | 752014 | ₹9.7 L | 1 | Accepted-AOC l1 |
| 2 | 2₹8.2 LRejected-Finance | ₹8.2 L | 2 | Rejected-Finance na |
| 3 | 3₹9.7 LRejected-Finance | ₹9.7 L | 3 | Rejected-Finance na |
| 4 | 4₹9.7 LRejected-Finance AT AKSHAYAPADA ALAGUMA P O ALAGUM P S SATYABADI DIST PURI PIN 752014 | SATYABADI | PURI | ODISHA | 752014 | ₹9.7 L | 4 | Rejected-Finance na |
Tender Value
₹9.7 L
EMD Value
₹9,680
Closing Date
27 Apr 2026, 5:00 pmClosed
BDO SATYABADI
OFFICE OF PANCHAYAT SAMITI SATYABADI
CONST. OF ACR AT GOPALPURPATANA UGUPS
2026_ZPSAT_128136_1
2/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
OFFICE OF PANCHAYAT SMAITI SATYABADI
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
₹9,680
Yes
20 Aug 2026
16 Apr 2026
28 Apr 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Foundation excavation in hard soil including levelling and dressing the bed and side depositing muck within initial lead & lift etc complete. | 1 | Cum | 1 | ₹1 |
| 2 | Filling foundation and plinth with sand well watered and rammed
including cost,conveyance and royality of sand etc. complete. | - | Cum | - | - |
| 3 | Cement concrete 1:3:6 using 4cm. size HBG crusher broken metal
including cost,conveyance and royality of materials curing etc. complete | - | Cum | 1 | - |
| 4 | Laterite stone masonry in c.m. 1:6 in Sup.Str. including
cost,conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . | - | Cum | 1 | - |
| 5 | RCC M20 grade (1:1½:3) using 20 mm and down graded black cbg chips including all cost, carriage & royalty etc.complete.(Including Cost of Centering and Shuttering. Column Footing | - | Cum | - | - |
| 6 | Coloumn/Beam | - | Cum | - | - |
| 7 | Plinth Beam | - | Cum | - | - |
| 8 | Lintel | - | Cum | - | - |
| 9 | Roof Slab | 1 | Cum | - | - |
| 10 | 20mm. thick cement plaster in c.m.( 1:4 ) as greading Plaster including cost conveyance and royality of materials curing etc. complete. | 1 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 1.69 MB
NIT.pdf
Tender Documents • 0.67 MB
BOQ_587837.xls
BOQ • 0.33 MB
DTCN.pdf
Tender Documents • 1.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].